AZTEC GENERAL CONTRACTORS, LLC | B= | C | 11/06/2019 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 6389805 |
AZTEC GENERAL CONTRACTORS, LLC | B= | P | 10/25/2019 | building final OK pending other required inspections. Additional Inspections Required (computer generated): ROSS ELECTRIC ENTERPRISE, INC Electrical Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 6379907 |
AZTEC GENERAL CONTRACTORS, LLC | B= | P | 09/26/2019 | Temp CO: Pending all of our departments finals ( Expires: 10/26/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6349743 |
AZTEC GENERAL CONTRACTORS, LLC | B= | P | 09/26/2019 | pending other required inspections / break room sink height measured 36" at final / all other building final aspects OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, EL PASO PLUMBING, INC. Plumbing Final Inspection is not Completed yet, ROSS ELECTRIC ENTERPRISE, INC Electrical Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 6349711 |
AZTEC GENERAL CONTRACTORS, LLC | BSP | P | 09/25/2019 | site visit / reviewed accessible elements with site rep - including signs - accessible door handles - and lav heights / discussed need to meet accessibility requirements for lav in break room as the room occupancy was changed | LONNYS | LONNYS | | BSP | P | 6347115 |
AZTEC GENERAL CONTRACTORS, LLC | BFN | C | 08/26/2019 | pit #3 wall forms and reinforcing OK / all footers and walls OK | LONNYS | LONNYS | | BFN | C | 6314365 |
AZTEC GENERAL CONTRACTORS, LLC | BFT | P | 08/26/2019 | updated foundation design for pits on file - 2000PSF | LONNYS | LONNYS | | BFT | P | 6313432 |
AZTEC GENERAL CONTRACTORS, LLC | BFT | P | 08/22/2019 | need pit design noting allowable bearing capacity / received open hole 2000PSF / pit #3 footing forms and reinforcing OK | LONNYS | LONNYS | | BFT | P | 6311399 |
AZTEC GENERAL CONTRACTORS, LLC | BFT | P | 08/20/2019 | still need foundation design noting bearing capacity to complete BFT / open hole on file 2000PSF | LONNYS | LONNYS | | BFT | P | 6306404 |
AZTEC GENERAL CONTRACTORS, LLC | BSP | P | 08/19/2019 | pending other required inspections / wood framing for front entrance family restroom walls OK / reviewed accessible elements with site rep | LONNYS | LONNYS | | BSP | P | 6305504 |
COLORADO SHEET METAL CO., INC. | BSP | P | 08/12/2019 | ADDITIONAL PLAN REVIEW TIME: From: DALEH revised backgrounds from bathroom to breakroom | DALEH | DALEH | | BSP | P | 6297574 |
AZTEC GENERAL CONTRACTORS, LLC | BFN | P | 08/12/2019 | pending receiving open hole / foundation forms and reinforcing OK for pit A and pit B | LONNYS | LONNYS | | BFN | P | 6297381 |
AZTEC GENERAL CONTRACTORS, LLC | BFT | P | 08/08/2019 | need stamped open hole and eng design showing bearing pressure / pending receipt of requested items north pit footing and southeast pit footing okay per design | BOBF | BOBF | | BFT | P | 6293559 |
AZTEC GENERAL CONTRACTORS, LLC | BFR | P | 08/08/2019 | pending other required inspections - framing for walls and deck of mezzanine, new rest rooms, storage and maintainance rooms okay , will need to splice added work scope at existing rooms / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 6293558 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | C | 11/06/2019 | | TIMA | TIMA | | E= | C | 6389804 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | R | 11/05/2019 | no one on site / no ladder set up / | BRIAN | BRIAN | | E= | R | 6389295 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | R | 11/04/2019 | INSTALL LONGER NIPPLE FROM DISCONNECT TO RTU 25 ONLY | CRAIG | CRAIG | | E= | R | 6387570 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | P | 11/01/2019 | need wires in raceway running through rtu unit / install stacon for equipment ground wire in rtu disconnect----rest ok | TIMA | TIMA | | E= | P | 6385708 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | R | 10/25/2019 | Splice must be approved, stamped, and scanned into RBD system before you request final. Recall inspection request after splice is in system, we can not complete on inspector's side until then. | CHIPO | CHIPO | | E= | R | 6379911 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | R | 10/22/2019 | breaker lock not installed on wall heaters / can not bond in both thr transformer and panel LV1 / one line needs to show #3 CU to disconnect to transformer, showing 3/0 / need roof access to inspect new RTU / | MIGUEL | MIGUEL | | E= | R | 6377105 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | P | 10/16/2019 | label disconnect and meter ---------- install correct breaker lock for heater | CRAIG | CRAIG | | E= | P | 6370661 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | P | 09/24/2019 | one-line and panel schedule for LV1 does not match / panel shows 100A main, there is not one /install secondary protection / install EGC from disconnect to transformer / plans show existing 45KVA transformer, actually 75KVA / label panel , and AIC rating / install breaker lock on wall heaters / | MIGUEL | MIGUEL | | E= | P | 6345707 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 08/28/2019 | 2 wall heaters added, bathroom and breakroom / | MIGUEL | MIGUEL | | ER | P | 6316870 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 08/19/2019 | walls for family restroom and break room ok / hallway switch ok / | MIGUEL | MIGUEL | | ER | P | 6306287 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 08/08/2019 | bathrooms hard lid --ok | BRIAN | BRIAN | | ER | P | 6293961 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 08/06/2019 | bathroom group walls only / missing bath fans for ceiling / | BRIAN | BRIAN | | ER | P | 6290865 |
COLORADO SHEET METAL CO., INC. | H= | C | 10/24/2019 | UPDATED 11-20-19 DS: SEE PERMIT M38825 FOR RTU REPLACEMENT FOR RELOCATED RTU ON THIS PERMIT. LABELING FOR RTU THERMOSTATS COMPLETED, SEE IMAGES. TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6378811 |
COLORADO SHEET METAL CO., INC. | HSP | P | 10/23/2019 | MECHANICAL CONTRACTOR FOR RTU REPLACEMENT NOT REQUIRED. CONTRACTOR HAS REPLACEMENT PERMIT M38825. RTU'S WILL BE LABELED PER THIS REPLACEMENT PERMIT AS WELL. | DUSTINS | DUSTINS | | HSP | P | 6377272 |
COLORADO SHEET METAL CO., INC. | H= | P | 10/22/2019 | STILL NEED MECHANICAL CONTRACTOR TO ATTACH TO PERMIT FOR NEW RTU AND GAS PIPING. // PICTURE OF RTU ECONOMIZER AND CO2 SENSOR RECEIVED, SEE IMAGES. STILL NEED RTU'S AND THERMOSTATS PROPERLY LABELED, PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6375953 |
COLORADO SHEET METAL CO., INC. | H= | P | 09/26/2019 | ----ENGINEER TO ADDRESS WITH PLAN SPLICE - Sheets M1, M2 & G1 of plan splice all show different numbers for RTU'S at different locations. Need equipment schedule to correctly show which RTU'S are existing, replaced & new with correct manufacturer and model numbers. Need thermostat locations shown on plan---- Currently 1 existing RTU lacks an economizer and still need to confirm CO2 sensors installed on all. Need RTU'S and thermostats properly labeled. Provide test and balance report. ----Need mechanical contractor attached to permit for new RTU and gas piping---- | MARKB | MARKB | | H= | P | 6349145 |
COLORADO SHEET METAL CO., INC. | HD | P | 08/07/2019 | ABOVE CEILING DUCT - EXHAUST DUCT FOR BATHROOM COMPLETE, Still need to see roof termination. | MARKB | MARKB | | HD | P | 6291644 |
EL PASO PLUMBING, INC. | P= | C | 10/17/2019 | correction made see images | JOSEPHD | JOSEPHD | | P= | C | 6371252 |
EL PASO PLUMBING, INC. | PTO | C | 10/17/2019 | | JOSEPHD | JOSEPHD | | PTO | C | 6371250 |
EL PASO PLUMBING, INC. | P= | P | 10/15/2019 | sink in breakroom still to high needs to be 34" max to top of sink | JOSEPHD | JOSEPHD | | P= | P | 6368312 |
EL PASO PLUMBING, INC. | P= | P | 09/24/2019 | update: 9/25/19 break room sink not at accessible hieght
need to add water heater to scope of work, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6345847 |
EL PASO PLUMBING, INC. | PTO | P | 08/19/2019 | lav relocated in front bathroom ok, still need plan splice for 1 1/4" water from adjacent unit to water entry, still need to add items to scope of work | JOSEPHD | JOSEPHD | | PTO | P | 6305247 |
EL PASO PLUMBING, INC. | PTO | P | 08/02/2019 | Ok, Note: by final need plan splice for for added 1-1/4" domestic water line from adjacent unit for new water entry by mop sink, need engineer approval for removal of floor drain, fix scope of work to show 4 lavs, 1 drinking fountain, 1 mop sink, 5 toilets, 1 urinal, 1 water heater, 1 backflow. Check water heater - water entry - vtr to ait intake at final. | DANR | DANR | | PTO | P | 6287367 |
EL PASO PLUMBING, INC. | PB | P | 07/17/2019 | Need engineer approval for removal of floor drain, rest ok for underground. Note: fix scope of work to show 4 lavs, 1 drinking fountain, 1 mop sink, 5 toilets, 1 urinal. | DANR | DANR | | PB | P | 6266344 |
ROSS ELECTRIC-ENTERPRISE, INC. | XES | T | 10/25/2019 | PAID (REC#1640219) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised conductor size on one-line to indicate #3. | BERTHA | BERTHA | | XES | T | 6380806 |
ROSS ELECTRIC-ENTERPRISE, INC. | XES | T | 10/15/2019 | PAID (REC#1637573) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised plans - changed restroom to breakroom, added RTU. | BERTHA | BERTHA | | XES | T | 6369176 |
EL PASO PLUMBING, INC. | XPS | P | 10/15/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 10/15/19: Delta R2 revisions adjusted plumbing plan, notes 1-4 | SHANEN | SHANEN | | XPS | P | 6369152 |
COLORADO SHEET METAL CO., INC. | XMS | T | 10/04/2019 | PAID (REC#1635121) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: clouds | JUSTINC | JUSTINC | | XMS | T | 6358077 |
ROSS ELECTRIC-ENTERPRISE, INC. | XES | T | 09/12/2019 | PAID (REC#1631911) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised 45KVA transformer to 75KVA - revised one line. | BERTHA | BERTHA | | XES | T | 6333595 |
EL PASO PLUMBING, INC. | XPS | P | 09/12/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 9/12/19: Delta R1 revisions P1 adjust isometrics and plumbing plan, P2 add water entry detail, adjust water heater detail | SHANEN | SHANEN | | XPS | P | 6333510 |
ROSS ELECTRIC-ENTERPRISE, INC. | XES | P | 08/14/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Electrical plans to accommodate revised background. | BERTHA | BERTHA | | XES | P | 6300565 |
EL PASO PLUMBING, INC. | XPS | P | 08/14/2019 | PLAN SPLICE FEE: $0 by: SHANEN for Plumbing: Plumbing splice 8/14/19: Delta 1 revisions new page added (PS1). | SHANEN | SHANEN | | XPS | P | 6300530 |
COLORADO SHEET METAL CO., INC. | XMS | P | 08/12/2019 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: revised backgrounds | DALEH | DALEH | | XMS | P | 6297571 |
AZTEC GENERAL CONTRACTORS, LLC | XBS | T | 08/12/2019 | PAID (REC#1622247) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise toilet room - add breakroom | MICHAELA | MICHAELA | | XBS | T | 6297475 |