TECTON CORPORATION | B= | C | 01/19/2021 | | TIMOTHYS | TIMOTHYS | | B= | C | 6839723 |
TECTON CORPORATION | B= | P | 01/07/2021 | Door hardware not corrected / All other final items OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | ADAML | ADAML | | B= | P | 6828470 |
TECTON CORPORATION | B= | P | 12/23/2020 | Complete zoning final / Maintenance door hardware requires tight grasping pinching twisting motion to operate / Office door hardware requires tight grasping pinching twisting motion to operate / Remove deadbolt from office door / Provide accessible laundry folding table / Repalce obscured signage over exit door -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | TIMOTHYS | TIMOTHYS | | B= | P | 6818835 |
TECTON CORPORATION | BE | L | 08/04/2020 | Renewed for No Fee at 8/4/2020 2:56:15 PM | SABRINA | SABRINA | | BE | L | 6660852 |
TECTON CORPORATION | BFR | P | 08/07/2019 | Frame OK pending all MEP's complete / Reviewed accessible elements / Need electrical attached | NICK | NICK | | BFR | P | 6292013 |
TECTON CORPORATION | BFT | C | 06/26/2019 | New bulk heads OK per approved design on A3 | NICK | NICK | | BFT | C | 6244911 |
BLUE MOUNTAIN ELECTRIC, INC. | E= | C | 05/29/2020 | Correction made. | BRETC | BRETC | | E= | C | 6586971 |
BLUE MOUNTAIN ELECTRIC, INC. | ER | C | 05/29/2020 | Correction made | BRETC | BRETC | | ER | C | 6586970 |
BLUE MOUNTAIN ELECTRIC, INC. | E= | R | 05/15/2020 | Need to have breaker locks on all hardwired washers, PA1 & PA2 / Label each washer with which brkr | BRETC | BRETC | | E= | R | 6573065 |
BLUE MOUNTAIN ELECTRIC, INC. | ER | R | 05/15/2020 | Need to have breaker locks on all hardwired washers, PA1 & PA2 | BRETC | BRETC | | ER | R | 6573064 |
BLUE MOUNTAIN ELECTRIC, INC. | ER | P | 08/08/2019 | all walls,,,,, | GARYL | GARYL | | ER | P | 6294152 |
CLIMATE SOLUTIONS, LLC | H= | C | 12/09/2020 | ALL PERMIT CORRECTIONS MADE - TAB REPORT RECEIVED - SEE IMAGES | JERRYF | JERRYF | | H= | C | 6801140 |
O.M.A.G.M., INC. | H= | C | 12/09/2020 | | JERRYF | JERRYF | | H= | C | 6801132 |
O.M.A.G.M., INC. | HE | L | 08/04/2020 | Renewed for No Fee at 8/4/2020 2:56:41 PM | SABRINA | SABRINA | | HE | L | 6660853 |
CLIMATE SOLUTIONS, LLC | H= | R | 02/28/2020 | NEED PERMIT WORK SCOPE CORRECTED PER PREVIOUS NOTES CONTRACTOR TO REVIEW ALL NOTES BEFORE CALLING INSPECTION - SEE HV NOTES - NEED TAB REPORT - STOPPED INSPECTION | JERRYF | JERRYF | | H= | R | 6496696 |
CLIMATE SOLUTIONS, LLC | HV | P | 02/28/2020 | PARTIAL PENDING SOMEONE CLAIMING WATER HEATER VENTS AND REQUESTING INSPECTION - AT THIS TIME PERMIT SHOWS 2 VENT / THERE ARE 4 WATER HEATER VENTS ON PLAN | JERRYF | JERRYF | | HV | P | 6496691 |
CLIMATE SOLUTIONS, LLC | HD | C | 01/27/2020 | CHANGED INSPECTION TO DUCT INSPECTION - ALL DRYER / FRESH AIR / SA / RA DUCTS AND FINAL CONNECTIONS OK - FOR FINAL NEED THE FOLLOWING - ADJUST WORK SCOPE ON PERMIT TO SHOW ALL DUCTS / DRYER VENTS / LOUVER'S - TAB REPORT - SOMEONE TO CLAIM WATER HEATER VENTS ON PERMIT AND CALL INSPECTION ( AT THIS INSPECTION NOTED WATER HEATER VENTS NEED TO BE PROPERLY BRACES ON ROOF AND REPLACE VENT JOINT NOT SEATED CORRECTLY - STILL NEED VENT INSPECTION COMPLETED - STOPPED INSPECTION | JERRYF | JERRYF | | HD | C | 6465403 |
O.M.A.G.M., INC. | H= | P | 08/13/2019 | NEED 2# APPROVAL LETTER FROM CSU AND MECHANICAL CONTRACTOR ATTACHED NOTES: ALL FINAL CONNECTIONS / LABELS AND REGULATORS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6299156 |
O.M.A.G.M., INC. | HI | C | 08/13/2019 | PLAN REVISION COMPLETE - BEFORE FINAL CAN BE COMPLETED NEED MECHANICAL CONTRACTOR ATTACHED - TALKED TO GENERAL CONTRACTOR | JERRYF | JERRYF | | HI | C | 6299155 |
O.M.A.G.M., INC. | HI | P | 07/29/2019 | NEED MECHANICAL AND ELECTRICAL CONTRACTOR ATTACHED TO PERMIT.((CAN NOT RELEASE METER UNTIL THE SPLICE HAS GONE THROUGH PLANS AND REVIEW :NEED REVISED AND APPROVED SPLICE FOR THE FOLLOWING - ON THE ROOF GAS FOR THE WEST BANK OF DRYERS GOES FROM 2" TO 1-1/4" AT GAS REGULATOR LOCATION AND BACK TO 2" BEFORE IT PENETRATES INTO THE BUILDING , PLANS SHOWS GAS PIPING 2" ALL THE WAY . ON THE ROOF GAS FOR THE NORTH BANK OF DRYERS - 1" INSTALLED AT GAS REGULATOR LOCATION AND OFF THE 2" BEFORE IT PENETRATES INTO THE BUILDING PLANS SHOWS THIS TO BE 1-1/2".)) (10 lb TEST OK . GAS PIPE INSTALLED INSIDE PER PLANS / ALL MEDIUM PRESSURE LABELS IN PLACE. STILL NEED ALL FINAL CONNECTIONS AND REGULATORS INSTALLED .) | LIDO | LIDO | | HI | P | 6280422 |
HOGAN MECHANICAL, INC. | P= | C | 01/22/2020 | | JOHNS | JOHNS | | P= | C | 6460662 |
HOGAN MECHANICAL, INC. | P= | P | 11/19/2019 | Insulate all hot water lines, Need trap guards at emergency floor drains, Verify lint trap at trench drains. | SAMH | SAMH | | P= | P | 6403674 |
HOGAN MECHANICAL, INC. | PTO | C | 11/19/2019 | Verify insulation at final. | SAMH | SAMH | | PTO | C | 6403670 |
HOGAN MECHANICAL, INC. | PB | C | 06/24/2019 | | SAMH | SAMH | | PB | C | 6241734 |
BLUE MOUNTAIN ELECTRIC, INC. | XES | P | 11/19/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power and lighting for background change. | BERTHA | BERTHA | | XES | P | 6403527 |
TECTON CORPORATION | XBS | T | 11/19/2019 | PAID (REC#1645438) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Delta 4: Adding louvers to existing window openings | LBENNETT | LBENNETT | | XBS | T | 6403507 |
O.M.A.G.M., INC. | XMS | P | 11/19/2019 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: new splice see Delta 4 on plans added louver ed openings interlocked with dryers. | TCRIPPEN | TCRIPPEN | | XMS | P | 6403484 |
O.M.A.G.M., INC. | XMS | T | 07/30/2019 | PAID (REC#1621733) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: see clouded notes | TCRIPPEN | TCRIPPEN | | XMS | T | 6281973 |