ELITE PROPERTIES OF AMERICA, INC. | B= | C | 03/04/2020 | | CHUCK | CHUCK | | B= | C | 6499360 |
ELITE PROPERTIES OF AMERICA, INC. | B= | P | 01/27/2020 | Building final OK pending completion of shell permit. -- Schedule a new Building Final when above items are complete. | CHUCK | CHUCK | | B= | P | 6465535 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | P | 09/04/2019 | interior light gauge framing OK at all of showroom pending splice for all display walls and at all restroom, IT/storage room and janitor closet pending the splice of the structural design for how to build the hard lids over the restrooms and janitor closet as currently the hard lids are to have the water heater and service area for water heater on top of it and 16 gauge joists are attached to ledgers attached to 25 gauge studs | DANE | DANE | | BFR | P | 6323773 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | R | 09/04/2019 | Design changes for bathroom ceiling to be spliced in to plans. | CHUCK | CHUCK | | BFR | R | 6322723 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | P | 08/14/2019 | need to attach plumbing permit and have inspections / interior light gauge framing from reception area, office hall wall and bull pen to west demising wall OK pending other roughs / nothing east of this was completed or inspected at this time / discussed accessible elements | DANE | DANE | | BFR | P | 6300059 |
ENCORE ELECTRIC, INC. | E= | C | 12/12/2019 | | BRET | BRET | | E= | C | 6425548 |
ENCORE ELECTRIC, INC. | E= | P | 12/11/2019 | install hoods , safe off whips for hoods and future lighting, | BRET | BRET | | E= | P | 6424032 |
ENCORE ELECTRIC, INC. | ESL | C | 10/07/2019 | 1" pvc for island | BRET | BRET | | ESL | C | 6360218 |
ENCORE ELECTRIC, INC. | ER | C | 10/07/2019 | | BRET | BRET | | ER | C | 6360215 |
ENCORE ELECTRIC, INC. | EP | R | 09/24/2019 | panels not ready | BRET | BRET | | EP | R | 6346210 |
ENCORE ELECTRIC, INC. | ES | C | 09/24/2019 | Commercial Service: 400 amp service ok to energize, existing 800 amp service core and shell , made to main disconnect only | BRET | BRET | | ES | C | 6346206 |
ENCORE ELECTRIC, INC. | ER | P | 09/09/2019 | hard lid and walls east area , | BRET | BRET | | ER | P | 6328309 |
ENCORE ELECTRIC, INC. | ER | P | 08/29/2019 | I T room 107, hall , restrooms 108,109, janitor closet 110, rest of east wall with track light stubs. | BRET | BRET | | ER | P | 6318726 |
ENCORE ELECTRIC, INC. | ER | P | 08/14/2019 | walls office 102,103,104, bull pin 106 except half walls, kitchen/break room 105, exterior walls south and east. top north/ east exterior wall | BRET | BRET | | ER | P | 6300190 |
WESTERN FIREPLACE SUPPLY, INC. | H= | C | 12/09/2019 | FIREPLACE FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6420791 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 11/19/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6403386 |
KAMPP-L ENTERPRISES, INC. | H= | C | 11/13/2019 | PICTURE OF GAS SHUT OFF BEING MOVED TO BE ACCESSIBLE RECEIVED, SEE IMAGES. GAS FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6397053 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 11/07/2019 | ALL FLEX, DIFFUSERS, THERMOSTATS, REMOTE INDICATORS AND ROOF OK. MECHANICAL FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6391725 |
KAMPP-L ENTERPRISES, INC. | H= | P | 10/21/2019 | APPEARS GAS SHUT OFF FOR FIREPLACE IS NOT ACCESSIBLE. MEDIUM PRESSURE STICKERS AND REGULATORS IN PLACE. | DUSTINS | DUSTINS | | H= | P | 6374842 |
KAMPP-L ENTERPRISES, INC. | HC | C | 10/01/2019 | ADDING 120MBH TO EXISTING LOAD. | DUSTINS | DUSTINS | | HC | C | 6353649 |
KAMPP-L ENTERPRISES, INC. | HI | C | 10/01/2019 | 10 LB TEST OK. PIPING PER PLAN SPLICE. MEDIUM PRESSURE STICKERS IN PLACE. CHECK REGULATORS AND CONNECTIONS TO EQUIPMENT AT FINAL. ADDING 120MBH TO EXISTING LOAD. | DUSTINS | DUSTINS | | HI | C | 6353644 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 09/17/2019 | FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK. FACTORY NON COMBUSTIBLE FACING MATERIAL INSTALLED PER INSTALLATION INSTRUCTIONS. | DUSTINS | DUSTINS | | HV | C | 6337622 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 08/30/2019 | EXHAUST FAN CONNECTIONS ABOVE HARD LID OK, NO ROOF TODAY | BENH | BENH | | HD | P | 6320094 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 08/21/2019 | EXHAUST TERMINATION ON ROOF NEEDS TO BE 10' AWAY OR 3' ABOVE ECONOMIZER. MISSING 10" SUPPLY AIR FROM RTU-1 IN SHOW ROOM. MISSING 8" SUPPLY AIR FROM RTU-4 TO HALLWAY OUTSIDE IT STORAGE. ALL OTHER SUPPLY/RETURN AIR MAIN TRUNKS AND LATERALS OK, OK TO WRAP. EXHAUST DUCTS ABOVE CEILING OK, NEED TO SEE CONNECTIONS IN BATH ROOMS. SMOKE DETECTORS ALL INTERNALLY MOUNTED IN RTU'S. AT FINAL VERIFY REMOTE INDICATORS INSTALLED. FYI: PERMITS PULLED AFTER 7-1-19 ALL RTU'S EITHER NEW OR REPLACEMENT NEED TO HAVE A WATER LEVEL MONITORING DEVICE INSTALLED AND P-TRAPS TO BE INSTALLED PER INSTALLATION INSTRUCTIONS. | DUSTINS | DUSTINS | | HD | P | 6308349 |
KAMPP-L ENTERPRISES, INC. | P= | C | 01/17/2020 | Corrections made. | SAMH | SAMH | | P= | C | 6456720 |
KAMPP-L ENTERPRISES, INC. | P= | P | 01/07/2020 | install dishwasher to verify hi- loop at break room sink, toilet handle needs to be on the open side at womens restroom, need drain down at water heater, revise plans for single drinking fountain, need hammer arrestors at both dishwashers, rest ok. | TAYLOR | TAYLOR | | P= | P | 6445268 |
KAMPP-L ENTERPRISES, INC. | PTO | C | 10/04/2019 | By final add Plan splice for water, and Engineers letter of approval for AAV at S1 and S2. | SAMH | SAMH | | PTO | C | 6358271 |
KAMPP-L ENTERPRISES, INC. | PTO | P | 09/19/2019 | Need to verify dwv to S1 and S2. Rest OK. Note: Add plan splice for cold water by final. | SAMH | SAMH | | PTO | P | 6341633 |
KAMPP-L ENTERPRISES, INC. | PTO | P | 09/04/2019 | cold H2O not to plan, anchor closet flanges, complete drinking fountain. | TAYLOR | TAYLOR | | PTO | P | 6323488 |
KAMPP-L ENTERPRISES, INC. | XPS | T | 01/14/2020 | PAID (REC#1655743) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 1/14/20: Delta 4 revisions P1.2 revised EWC-1 for accessible height drinking fountain with bottle filler. | SHANEN | SHANEN | | XPS | T | 6452812 |
KAMPP-L ENTERPRISES, INC. | XPS | P | 10/04/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 101/4/19: Delta 3 revisions P1.1 AAV detail, P1.2 AAV S-1 & S-2, 3/4" DCW & DHW | SHANEN | SHANEN | | XPS | P | 6357851 |
ELITE PROPERTIES OF AMERICA, INC. | XBS | T | 09/24/2019 | PAID (REC#1633007): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided ceiling detail and engineering letter for water heater platform. | BPHILLIPS | BPHILLIPS | | XBS | T | 6345616 |
ELITE PROPERTIES OF AMERICA, INC. | XBS | T | 09/23/2019 | PAID (REC#1632150): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Added wall type F at display. | BPHILLIPS | BPHILLIPS | | XBS | T | 6344022 |
ENCORE ELECTRIC, INC. | XES | T | 08/23/2019 | PAID (REC#1625811): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised Showroom. | BERTHA | BERTHA | | XES | T | 6313091 |
NIELSEN MECHANICAL CONTRACTORS, INC. | XMS | P | 08/23/2019 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised for gas ranges with associated piping and hoods. Also new gas fireplace with venting and piping | JUSTINC | JUSTINC | | XMS | P | 6312699 |
KAMPP-L ENTERPRISES, INC. | XPS | T | 08/23/2019 | PAID (REC#1624977): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 8/23/19: Delta 2 revisions adjust fixture schedule and water pipe size analysis, added S-1, S-2 and piping | SHANEN | SHANEN | | XPS | T | 6312661 |
ELITE PROPERTIES OF AMERICA, INC. | XES | T | 06/20/2019 | PAID (REC#1608122): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise panel location ( IT room). | SHELBY | SHELBY | | XES | T | 6237389 |