LOST CREEK CONSTRUCTION, LLC | B= | C | 08/19/2020 | Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file / | TRENTP | TRENTP | | B= | C | 6677463 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 08/11/2020 | Photo of house numbers on file | TRENTP | TRENTP | | BSP | P | 6667863 |
LOST CREEK CONSTRUCTION, LLC | B= | P | 08/11/2020 | FX Lumberguard installers cert on file / Pending the reception of Air leakage test results and photo of address numbers on house -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by EPCZONING is not Completed yet (Contact: Brad Walters at 520-6819), External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TRENTP | TRENTP | | B= | P | 6667830 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 08/11/2020 | AMM and test report for FX Lumberguard used as fire protection of floors on file | TRENTP | TRENTP | | BSP | P | 6667824 |
LOST CREEK CONSTRUCTION, LLC | B= | P | 08/10/2020 | Missing address numbers on house / Provide Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 / Provide final approval certificates, AMM sheet, and test report required per product testing report for material used in fire protection of floors per IRC 302.13 EX #4 / Finished basement, rear deck w/stairs -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by EPCZONING is not Completed yet (Contact: Brad Walters at 520-6819), External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TRENTP | TRENTP | | B= | P | 6667037 |
LOST CREEK CONSTRUCTION, LLC | BLA | C | 03/16/2020 | | CHUCK | CHUCK | | BLA | C | 6511684 |
LOST CREEK CONSTRUCTION, LLC | BIN | C | 03/04/2020 | Per discussion with contractor, air handler unit in attic does not draw or circulate air from the attic space with the rest of the house. Ignition barrier is not required in attic per requirements of spray foam UES report. BIN OK. | CHUCK | CHUCK | | BIN | C | 6499403 |
LOST CREEK CONSTRUCTION, LLC | BIN | P | 03/04/2020 | UES report for open cell spray foam on file. Need ignition barrier for spray foam applied to underside of roof deck in conditioned attic per test report. | CHUCK | CHUCK | | BIN | P | 6499229 |
LOST CREEK CONSTRUCTION, LLC | BSP | R | 03/03/2020 | Insulation re-inspection not required/needed - Need to complete BIN. | CHUCK | CHUCK | | BSP | R | 6498677 |
LOST CREEK CONSTRUCTION, LLC | BIN | P | 03/03/2020 | Closed cell foam, open cell foam and DC315 installers cert, closed cell foam ES report and DC315 UES report on file. Need open cell foam test report and ignition barrier required in attic with mechanical equipment if circulating attic air with rest of house. | CHUCK | CHUCK | | BIN | P | 6497945 |
LOST CREEK CONSTRUCTION, LLC | BFR | C | 03/02/2020 | | CHUCK | CHUCK | | BFR | C | 6497610 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 03/02/2020 | Engineering letter for Master Sunroom corner post frame, T18/T12C truss hanger bearing, Master Bathroom joist spacing shift and truss repair details on file. | CHUCK | CHUCK | | BSP | P | 6496844 |
LOST CREEK CONSTRUCTION, LLC | BSP | R | 02/28/2020 | Engineering and truss paperwork uploaded from phone is blurry and jumbled. Please re-submit. | CHUCK | CHUCK | | BSP | R | 6495504 |
LOST CREEK CONSTRUCTION, LLC | BFR | P | 02/03/2020 | T18 trusses and T12C to T14X trusses not fully seated in hangers / Need updated framing plan for trimmers/kings and elimination of 4x4 post/hardware at Sunroom / Missing roll blocking for un-restrained joist ends, main floor and basement / Missing 3rd K e.e., Loft window / Need truss repair paperwork to match work to T21/T21A trusses / Joist in basement mech room moved from 16" o.c. to approx. 18.5" to accommodate plumbing / Rest of framing OK - finished basement. | CHUCK | CHUCK | | BFR | P | 6472985 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 01/31/2020 | Engineers letter for front porch post cap, rafter connections, truss bearing, ST22 straps | TIMOTHYS | TIMOTHYS | | BSP | P | 6470260 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 01/30/2020 | Engineers letter for alternate post bases front and rear on file | TIMOTHYS | TIMOTHYS | | BSP | P | 6468679 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 01/29/2020 | 6x6 kicker post at front porch lid ridge needs BC6 top and bottom - Rest of front porch lid ok - Rear deck frame ok - Rear deck lid ok - Rear side porch lid ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6468395 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 11/22/2019 | Received letter for front and rear porch post bases - Front and rear porch post bases ok | ASHLEYB | ASHLEYB | | BSP | P | 6408115 |
LOST CREEK CONSTRUCTION, LLC | BTR | C | 11/21/2019 | | TIMOTHYS | TIMOTHYS | | BTR | C | 6406899 |
LOST CREEK CONSTRUCTION, LLC | BSP | R | 11/06/2019 | Front and rear porch post bases do not match plans - Rear upper deck post bases ok | ASHLEYB | ASHLEYB | | BSP | R | 6390157 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 07/25/2019 | Rigid R10 insulation installed under radiant heat in basement floor OK. | CHUCK | CHUCK | | BSP | P | 6276443 |
LOST CREEK CONSTRUCTION, LLC | BSP | P | 07/09/2019 | Foundation design on file. | CHUCK | CHUCK | | BSP | P | 6256476 |
LOST CREEK CONSTRUCTION, LLC | BFN | C | 07/09/2019 | Foundation reinforcement with UFER observation on file. | CHUCK | CHUCK | | BFN | C | 6256467 |
LOST CREEK CONSTRUCTION, LLC | BFT | C | 07/09/2019 | Footing reinforcement observation on file. | CHUCK | CHUCK | | BFT | C | 6256462 |
LOST CREEK CONSTRUCTION, LLC | BFI | C | 07/08/2019 | Rigid R10 insulation installed on interior face of rear walkout foundation wall OK. Need to complete BFT/BFN inspections. | CHUCK | CHUCK | | BFI | C | 6255355 |
LOST CREEK CONSTRUCTION, LLC | BFN | P | 07/08/2019 | Foundation design received - need copy of foundation reinforcement with UFER observation and to complete BFT. | CHUCK | CHUCK | | BFN | P | 6255351 |
LOST CREEK CONSTRUCTION, LLC | BFT | P | 07/08/2019 | Open ex. and soils report received - 2400# (1500# design) / 5% / usable drain required. Need copy of footing observation. | CHUCK | CHUCK | | BFT | P | 6255344 |
LOST CREEK CONSTRUCTION, LLC | BFD | C | 07/08/2019 | Usable drain and damp proofing OK. Drain daylights at left, rear corner of walkout foundation. Need to complete BFT/BFN inspections. | CHUCK | CHUCK | | BFD | C | 6255343 |
LOST CREEK CONSTRUCTION, LLC | BFT | P | 06/13/2019 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 6230805 |
LOST CREEK CONSTRUCTION, LLC | BFN | P | 06/13/2019 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 6230804 |
WINTERS ELECTRIC, INC. | E= | C | 08/04/2020 | E= OK ---- NO A/C ---- | GREGM | GREGM | | E= | C | 6659788 |
WINTERS ELECTRIC, INC. | E= | R | 08/03/2020 | NEED SPARK GUARD AT GARAGE OUTLET ---- PROTECT WIRE IN KITCHEN ------ REST OK --- Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | GREGM | GREGM | | E= | R | 6659041 |
WINTERS ELECTRIC, INC. | ES | C | 08/03/2020 | Residential Underground: 2-200-amp 3 Wire New Residence ok . / NO ACTION NEEDED ------ | GREGM | GREGM | | ES | C | 6659033 |
WINTERS ELECTRIC, INC. | ER | C | 01/27/2020 | ER OK ----- CEN VAC----14/3 MCC ---5 #6AL SER ---4-#4 SER ----- | GREGM | GREGM | | ER | C | 6465194 |
WINTERS ELECTRIC, INC. | ER | L | 01/23/2020 | gate locked at 2:30 | TOMC | TOMC | | ER | L | 6462311 |
WINTERS ELECTRIC, INC. | EUG | C | 12/13/2019 | 2 - 250 urd | TOMC | TOMC | | EUG | C | 6427867 |
THE FURNACE GUY HEATING & COOLING | H= | C | 08/05/2020 | NO NEED FOR 2 POUND LETTER / HOUSE IS USING PROPANE /
| ANDREWP | ANDREWP | | H= | C | 6662742 |
THE FURNACE GUY HEATING & COOLING | H= | P | 07/30/2020 | UPDATED 7-31-20 DS: SPRAY FOAM INSULATION AT ROOF DECK, NO DUCT LEAKAGE REPORT REQUIRED. NO CONDENSERS FOR COOLING, THIS IS A PART OF THE GEO THERMAL SYSTEM. STILL NEED 2 LB APPROVAL AND BOILER VENT TERMINATION COMPLETED. // NEED DUCT LEAKAGE REPORT. NEED 2 LB APPROVAL FROM BLACK HILLS. COMPLETE BOILER VENT TERMINATION PER INSTALLATION INSTRUCTIONS. WERE CONDENSERS INSTALLED FOR AIR HANDLERS FOR COOLING? OR WAS THIS WHAT GEO THERMAL SYSTEM IS FOR? WHOLE HOUSE VENTILATION BEING ACHIEVED THROUGH EXHAUST FAN LOCATED IN POWDER ROOM / WHOLE HOUSE VENTILATION SWITCH LOCATED IN POWDER ROOM / NOTE / FINISHED BASEMENT / DIRECT VENT BOILER / 2- ELECTRIC AIR HANDLER FOR COOLING / | DUSTINS | DUSTINS | | H= | P | 6656042 |
THE FURNACE GUY HEATING & COOLING | H= | P | 07/29/2020 | GEOTHERMAL UNITS THAT ARE INSTALLED ARE OK
RE INSPECT ALL WHEN INSPECTION IS CALLED IN | ANDREWP | ANDREWP | | H= | P | 6653663 |
THE FURNACE GUY HEATING & COOLING | H= | P | 07/28/2020 | WILL NEED TO DO FURTHER RESEARCH WITH SENIOR ABOUT GEOTHERMAL UNITS INC MECHANICAL ROOM / WILL NEED INSTRUCTIONS FOR BOILER ON SITE/ VERIFY TERMINATION FOR BOILER IS CORRECT / NEED LADDER ACCESS FOR AIR HANDLER IN ATTIC / NEED WHOLE HOUSE LABELED
RE INSPECT ALL | ANDREWP | ANDREWP | | H= | P | 6652164 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HWP | C | 02/24/2020 | 60 lb test ok for upper and main floors, this completes HWP. | TAYLOR | TAYLOR | | HWP | C | 6490502 |
THE FURNACE GUY HEATING & COOLING | HRR | C | 01/29/2020 | PER NOTE FROM THE CONTRACTOR THE INSULATION FOR THIS HOME WILL BE SPRAY ON AT ROOF LINE,
WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN POWDER ROOM / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL /
NOTE/FINISHED BASEMENT/ 2X AIR HANDLERS / DIRECT VENT BOILER / A/C ROUGH, COIL AND LINESET / | TREVORH | TREVORH | | HRR | C | 6468608 |
THE FURNACE GUY HEATING & COOLING | HRR | P | 01/28/2020 | NEED BOILER INSTRUCTIONS ON SITE ,
BY FINAL WILL NEED DUCT LEAKAGE REPORT
WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN POWDER ROOM / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL /
NOTE/FINISHED BASEMENT/ 2X AIR HANDLERS / BOILER | ANDREWP | ANDREWP | | HRR | P | 6466289 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI | C | 01/21/2020 | BY FINAL WILL NEED 2 POUND APPROVAL LETTER FROM BLACK HILLS , WILL NEED TO VERIFY REGULATORS IN PLACE
10 LB TEST OK , 1 INCH MAIN , 1 BOILER , 2 OUTDOOR STUBS , 1 RANGE | ANDREWP | ANDREWP | | HI | C | 6457943 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI | C | 01/21/2020 | BY FINAL WILL NEED 2 POUND APPROVAL LETTER FROM BLACK HILLS , WILL NEED TO VERIFY REGULATORS IN PLACE
10 LB TEST OK , 1 INCH MAIN , 1 BOILER , 2 OUTDOOR STUBS , 1 RANGE | ANDREWP | ANDREWP | | HI | C | 6457920 |
NASRALLAH PLUMBING & HEATING, INC. | HO | C | 12/13/2019 | 10 lb test okay. 55' of 3/4" poly from tank to house will carry 258 K BTU (Propane) | MARK | MARK | | HO | C | 6427557 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HWP | P | 07/25/2019 | 60 lb test good for basement, ok to cover. | TAYLOR | TAYLOR | | HWP | P | 6276477 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | C | 08/07/2020 | Ok. Note: RP mechanical room. | DANR | DANR | | P= | C | 6665173 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | P | 08/07/2020 | Water Certificate attached | MALYNDA | MALYNDA | | P= | P | 6664529 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PTO | C | 01/21/2020 | partially finished basement ( 1 bathroom only ), aav's at right master lav, bar sink and main floor hall bath lav next to garage. | TAYLOR | TAYLOR | | PTO | C | 6458406 |
HOMEOWNER | PWO | C | 11/05/2019 | Verify Certificate of potable water by final. | SAMH | SAMH | | PWO | C | 6388807 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PB | C | 07/16/2019 | H2O under footer, note: IECC prescriptive. | TAYLOR | TAYLOR | | PB | C | 6265906 |