HAMMERS CONSTRUCTION, INC | B= | C | 08/14/2019 | | RITA | RITA | | B= | C | 6301151 |
HAMMERS CONSTRUCTION, INC | B= | P | 08/02/2019 | Temp CO: pending building and fire finals ( Expires: 9/1/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6286531 |
HAMMERS CONSTRUCTION, INC | B= | P | 08/01/2019 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | DANE | DANE | | B= | P | 6285071 |
HAMMERS CONSTRUCTION, INC | B= | L | 07/31/2019 | spoke to Tyler of Hammers Construction on phone and there is no access to the building after hours so I have rescheduled the inspection for tomorrow and discussed this with Tyler. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | DANE | DANE | | B= | L | 6284265 |
HAMMERS CONSTRUCTION, INC | BFR | P | 06/25/2019 | interior light gauge framing OK pending other roughs / need to attach mechanical permit and have inspections / need to have all other MEP inspections / door to conference room swings wrong way for final and will not have maneuvering clearance / sink in conference room is existing / east pain of glass in wall between conference and storage room 107 in existing wall is not tempered and is less than 18 from floor and greater than 9 SqFt and must be tempered for final / discussed accessible elements / inspection added in field as inspection was called on interior demo permit not the interior finish permit | DANE | DANE | | BFR | P | 6242778 |
SYSTEMS ELECTRIC, INC. | E= | C | 07/31/2019 | furniture in and labeled on panel 3-pole 20 amp | GARYL | GARYL | | E= | C | 6283623 |
SYSTEMS ELECTRIC, INC. | E= | R | 07/16/2019 | Office furniture needs installed and inspected, GFCI breaker for refrig | GARYL | GARYL | | E= | R | 6265187 |
SYSTEMS ELECTRIC, INC. | ER | P | 07/08/2019 | ceilings only, r | GARYL | GARYL | | ER | P | 6256034 |
SYSTEMS ELECTRIC, INC. | ER | R | 07/02/2019 | Called in as a partial ceilings, did not see any ceilings without cable on tiles | GARYL | GARYL | | ER | R | 6251446 |
SYSTEMS ELECTRIC, INC. | ER | P | 06/25/2019 | all walls only, lots of in ceilings | GARYL | GARYL | | ER | P | 6243048 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 07/30/2019 | CHANGED TO COMPLETE ( LM) (TESTS AND BALANCE REPORT RECEIVED WITH ENGINEER LETTER APPROVING THE READINGS SEE IMAGES / THERMOSTAT OK SEE IMAGES. ) | LIDO | LIDO | | H= | C | 6281005 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 07/17/2019 | PARTIAL PENDING : IN RECEPTION AND OFFICE AREA'S 1-8" SUPPLY INSTALLED IN EACH ROOM PLAN SHOWS 10" SUPPLY TO BE INSTALLED / INSTALL PER PLAN OR REVISED AND APPROVED PLANS WILL BE NEEDED. MISSING THERMOSTAT IN HALL #108 / TOP OF THERMOSTAT TO BE INSTALLED NO HIGHER THAN 48 " /OK TO ATTACH IMAGES TO NEXT INSPECTION REQUEST. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6267110 |
MARTINSON MECHANICAL, INC | P= | C | 07/17/2019 | | SAMH | SAMH | | P= | C | 6267624 |
MARTINSON MECHANICAL, INC | PTO | C | 06/26/2019 | Existing VTR. | SAMH | SAMH | | PTO | C | 6245512 |