SKYLINE CONSTRUCTION COMPANY, INC. | B= | C | 12/04/2019 | | DAKOTAB | DAKOTAB | | B= | C | 6416230 |
SKYLINE CONSTRUCTION COMPANY, INC. | BIN | P | 10/24/2019 | Insulation at drive thru window OK | DAKOTAB | DAKOTAB | | BIN | P | 6379404 |
SKYLINE CONSTRUCTION COMPANY, INC. | BFR | P | 10/24/2019 | Light guage frame at drive thru window OK | DAKOTAB | DAKOTAB | | BFR | P | 6379309 |
SKYLINE CONSTRUCTION COMPANY, INC. | BFT | P | 10/24/2019 | Open hole for new drive thru window received - 1500 PSF -- No drain required -- Foundation reinforcement OK | DAKOTAB | DAKOTAB | | BFT | P | 6379308 |
SKYLINE CONSTRUCTION COMPANY, INC. | BFT | P | 07/30/2019 | Authorized 3rd party engineer inspection with all observation paperwork to follow for drive through window foundation | SCOTTS | SCOTTS | | BFT | P | 6282300 |
SKYLINE CONSTRUCTION COMPANY, INC. | BFR | P | 07/30/2019 | frame is per plan/complete other rough inspections | SCOTTS | SCOTTS | | BFR | P | 6282298 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 11/27/2019 | Electrical complete / | ROB | ROB | | E= | C | 6411510 |
INTERMOUNTAIN POWER SERVICES INC | E= | P | 11/14/2019 | One line does match prints and is being re-submiited to plan review / Need box at menu board to make safe for final / | ROB | ROB | | E= | P | 6399517 |
INTERMOUNTAIN POWER SERVICES INC | EUG | P | 11/06/2019 | Menu Board requires stand alone sign permit with electrical attached / 2-3/4" PVC's to menu board routed from existing 11/4 stub outs / | ROB | ROB | | EUG | P | 6390246 |
INTERMOUNTAIN POWER SERVICES INC | ER | C | 08/27/2019 | Rough for ceiling ok / | ROB | ROB | | ER | C | 6315901 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 07/30/2019 | Rough for Service Area 101 ok / Results transferred from permit # M14216 / | ROB | ROB | | ER | P | 6281198 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 09/18/2019 | HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6338903 |
ALPHALETE MECHANICAL LLC | HC | C | 09/13/2019 | 75K ADDED TO GAS LOAD. | LIDO | LIDO | | HC | C | 6334489 |
ALPHALETE MECHANICAL LLC | H= | C | 09/13/2019 | GAS HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6334480 |
ALPHALETE MECHANICAL LLC | HI | C | 09/12/2019 | 10 lb TEST OK / GAS INSTALLED PER PLAN . | LIDO | LIDO | | HI | C | 6334483 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 09/04/2019 | PARTIAL PENDING: (( NEED GAS INSTALLED TO WATER HEATER / NEED REVISED AND APPROVED PLANS FOR GAS TO WATER HEATER AND WATER HEATER VENT LOCATION AND VENT TYPE )) CONTRACTOR INSTALLING GAS TO WATER HEATER TO ATTACH TO THE PERMIT. CONTRACTOR THAT INSTALLED WATER HEATER VENT WILL NEED TO ADD VENT TO THERE SCOPE OF WORK / ( VENT INSPECTED, INSTALL OK ) | LIDO | LIDO | | H= | P | 6324304 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 09/04/2019 | RECEIVED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | P | 6322930 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/26/2019 | ((NEED REVISED AND APPROVED PLANS FOR GAS TO WATER HEATER AND WATER HEATER VENT LOCATION AND VENT TYPE )) CONTRACTOR INSTALLING GAS TO WATER HEATER AND WATER HEATER VENT NEEDS TO ATTACH TO THE PERMIT. NEED A DUCT DETECTOR INSTALLED IN THE RETURN FOR THE EXISTING RTU. NEED REMOTE SMOKE INDICATOR INSTALLED ( LED) . MISSING THERMOSTAT.NEED TEST AND BALANCE REPORT. (ALL SUPPLY, RETURN AND EXHAUST GRILLS AND REGISTER FINAL CONNECTION OK. )
| LIDO | LIDO | | H= | P | 6314560 |
PIPE RITE PLUMBING AND HEATING LLC | P= | C | 12/03/2019 | | SAMH | SAMH | | P= | C | 6414120 |
PIPE RITE PLUMBING AND HEATING LLC | PTO | P | 07/30/2019 | CWV at hand sink. Check water heater at final. Will need air gap at in wall waste receptors at final. | SAMH | SAMH | | PTO | P | 6281728 |
INTERMOUNTAIN POWER SERVICES INC | XES | T | 11/22/2019 | PAID (REC#1646480) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise fault current for panel J | SHELBY | SHELBY | | XES | T | 6408856 |