HI-POINT HOME BUILDERS, LLC | B= | C | 04/30/2020 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6556802 |
HI-POINT HOME BUILDERS, LLC | B= | P | 04/23/2020 | Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | P | 6549036 |
HI-POINT HOME BUILDERS, LLC | B= | P | 04/21/2020 | Complete pending blower door test results -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | TIMOTHYS | TIMOTHYS | | B= | P | 6546853 |
HI-POINT HOME BUILDERS, LLC | B= | P | 04/15/2020 | Need to seal exterior penetrations at right and left elevations - Provide ladder for ceiling insulation inspection - Provide blower door test - 1/2 finished basement - Uncovered deck -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | ASHLEYB | ASHLEYB | | B= | P | 6541928 |
HI-POINT HOME BUILDERS, LLC | BFR | C | 11/25/2019 | | NATHAN | NATHAN | | BFR | C | 6409963 |
HI-POINT HOME BUILDERS, LLC | BIN | C | 11/25/2019 | unfinished basement | NATHAN | NATHAN | | BIN | C | 6409956 |
HI-POINT HOME BUILDERS, LLC | BFR | P | 11/18/2019 | garage door brackets blocking, missing ledger locks at garage ledgers, strap rear garage wall and master shower plate break, 3 2x8 at rear patio door main floor, center web bottom of porch E02 split, metal shims at beam pocket, anchor bolts at rear basement wall, basement protection at unfinished and paperwork. includes frame of porch and deck. | NATHAN | NATHAN | | BFR | P | 6402425 |
HI-POINT HOME BUILDERS, LLC | BSP | P | 09/10/2019 | front porch, posts, garage portal frame okay | NATHAN | NATHAN | | BSP | P | 6329935 |
HI-POINT HOME BUILDERS, LLC | BFN | C | 08/15/2019 | foundation plan uploaded | NATHAN | NATHAN | | BFN | C | 6301541 |
HI-POINT HOME BUILDERS, LLC | BFD | P | 08/14/2019 | still need foundation design to complete BFN / picture of drain tie in on file | LONNYS | LONNYS | | BFD | P | 6299690 |
HI-POINT HOME BUILDERS, LLC | BFT | C | 08/07/2019 | open hole on file -- 2000 PSF -- usable -- 10% / footing and foundation observation on file - ufer noted | NATHAN | NATHAN | | BFT | C | 6291293 |
HI-POINT HOME BUILDERS, LLC | BFN | P | 08/07/2019 | stamped open excavation letter on file need foundation plan | NATHAN | NATHAN | | BFN | P | 6291290 |
HI-POINT HOME BUILDERS, LLC | BFI | C | 08/02/2019 | R-10 at 2' OK | NICK | NICK | | BFI | C | 6286767 |
HI-POINT HOME BUILDERS, LLC | BFD | P | 07/30/2019 | drain is usable to daylight at SE corner of foundation / Pending verification of connection to underdrain via photo or reinspection / | NATHAN | NATHAN | | BFD | P | 6282074 |
HI-POINT HOME BUILDERS, LLC | BFT | P | 07/12/2019 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 6261386 |
HI-POINT HOME BUILDERS, LLC | BFN | P | 07/12/2019 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 6261385 |
ROWAN ELECTRIC LLC | E= | C | 04/13/2020 | | JOHNN | JOHNN | | E= | C | 6538537 |
ROWAN ELECTRIC LLC | E= | R | 04/03/2020 | install cages on 2 keyless fixtures in storage area with insulation above them / dish/disposal on with counter top circuit next to fridge labeled K1 / island receptacles labeled dish/ disposal / need test light to test WH blower receptacle / A/C 1-30A A/C 2-15A ok / | MIGUEL | MIGUEL | | E= | R | 6531350 |
ROWAN ELECTRIC LLC | ER | C | 11/15/2019 | ufer connection tight / | MIGUEL | MIGUEL | | ER | C | 6401534 |
ROWAN ELECTRIC LLC | ES | C | 10/11/2019 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | JOHNN | JOHNN | | ES | C | 6365585 |
ROWAN ELECTRIC LLC | ER | R | 10/11/2019 | ir ufer connection is loose,---------------------notes,unfinished basement, no floor heat, | JOHNN | JOHNN | | ER | R | 6365574 |
GENE'S HEATING AND AIR LLC | H= | C | 04/07/2020 | DUCT LEAKAGE RECEIVED. PHOTO OF WHOLE HOUSE VENTILATION SWITCH RECEIVED. SEE IMAGES. | KYLEW | KYLEW | | H= | C | 6532842 |
GENE'S HEATING AND AIR LLC | H= | P | 04/02/2020 | PROVIDE DUCT LEAKAGE REPORT FOR UPPER LEVEL SYSTEM. UNABLE TO LOCATE WHOLE HOUSE VENTILATION SWITCH. NOTE/ FINISHED BASEMENT/ OUTSIDE AIR TO FURNACE RETURN WITH DAMPER X2/ DIRECT VENT FURNACE/ MECHANICAL ROOM MEEETS 50:1 FOR WATER HEATER/ A/C COMPLETE X2/ | KYLEW | KYLEW | | H= | P | 6529554 |
GENE'S HEATING AND AIR LLC | HC | C | 11/13/2019 | RELEASE METER | MATTM | MATTM | | HC | C | 6398209 |
GENE'S HEATING AND AIR LLC | HRR | C | 11/13/2019 | | MATTM | MATTM | | HRR | C | 6398206 |
GENE'S HEATING AND AIR LLC | HRR | P | 11/08/2019 | VENT FOR FURNACE IN ATTIC NEEDS 1 INCH CLEARANCE FROM COMBUSTIBLES (OK TO ATTACH A DETAIL PICTURE FOR NEXT INSPECTION) BY FINAL WILL NEED DUCT LEAKAGE REPORT WHOLE HOUSE VENTILATION BEING ACHIEVED BY USING EXHAUST FAN IN LAUNDRY ROOM, BY FINAL VERIFY LOCATION OF DISCONNECT SWITCH
NOTES: UNFINISHED BASEMENT , DIRECT VENT FURNACE , 2X OUTSIDE AIR WITH DAMPERS , 2 A/C ROUGH COIL AND LINE SETS | ANDREWP | ANDREWP | | HRR | P | 6393121 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | HI | C | 11/07/2019 | 10LB TEST OK 1 1/4" MAIN 2 FURNACE 1 WATER HEATER 1 RANGE 1 FIREPLACE 1 BBQ | MATTM | MATTM | | HI | C | 6391684 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 10/01/2019 | Main level fireplace clearance to combustibles and vent termination ok | MATTM | MATTM | | HV | C | 6354195 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | P= | C | 04/14/2020 | PVB installed. | SAMH | SAMH | | P= | C | 6540016 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PTO | C | 11/14/2019 | by final insulate re circ return OR fill out and upload to plans AMM form for the recirc, rest ok | JOHNS | JOHNS | | PTO | C | 6399153 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PTO | P | 11/01/2019 | still need freeze pro @ garage p-trap, need to insulate re circ return OR fill out AAM form w/ plan review approval and upload to plans, rest ok | JOHNS | JOHNS | | PTO | P | 6385672 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PTO | P | 09/11/2019 | need freeze pro @ garage p-trap, main level shwr not vented (not on vented branch), re attach straps @ pwdr bath 3" @ bsmnt, need to insulate re circ return OR fill out AMM form with plan review approval and upload to plans, rest ok. NOTE: vtr (3) 1 @ back lower roof, VENT CAPS ON, unfinished bsmnt, bsmnt lav vtr, irrigation stub, by final insulate re circ return OR fill out and upload to plans AMM form for the recirc | JOHNS | JOHNS | | PTO | P | 6331755 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PB | C | 08/13/2019 | | JOSEPHD | JOSEPHD | | PB | C | 6298468 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PB | L | 08/12/2019 | Field cancel. | DANR | DANR | | PB | L | 6296431 |
HI-POINT HOME BUILDERS, LLC | XMS | T | 10/31/2019 | PAID (REC#1641106): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised manuals J,S,D, HVAC equipment cert., WHMVS form for added 2nd story system | JUSTINC | JUSTINC | | XMS | T | 6384252 |