HENSEL PHELPS CONSTRUCTION CO | B= | C | 01/13/2020 | | BOBF | BOBF | | B= | C | 6450666 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 01/08/2020 | swing bars at all rest rooms to be 39" - 41" from back wall and 39" - 41" above finished floor, reast of building okay -- Schedule a new Building Final when above items are complete. | BOBF | BOBF | | B= | P | 6446332 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/09/2019 | pending completion of other required inspections, framing of soffits and hardlids throughout okay | BOBF | BOBF | | BFR | P | 6363570 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 09/17/2019 | pending other required inspections, interior wall framing okay, still need bulk heads, soffits and hard lids / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 6337944 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 08/23/2019 | pending other required inspections framing for full height non rated walls in rooms 5018 through 5033 and rooms 5061, 5063, 5065, 5067 and 5013 okay | BOBF | BOBF | | BFR | P | 6312055 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 08/23/2019 | layout for frame inspection | BOBF | BOBF | | BFR | P | 6311583 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 01/03/2020 | | BRIAN | BRIAN | | E= | C | 6442966 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | EP | P | 12/31/2019 | need to label the panels with the fault current and replace only with 14 k breakers / Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / -----rest ok | BRIAN | BRIAN | | EP | P | 6440353 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 12/30/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6439101 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 12/30/2019 | need gfci protection with in 6' of sink on exam rooms 5-6-7-8 / rest ok / need ep inspection | BRIAN | BRIAN | | E= | P | 6439091 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | R | 12/23/2019 | FIRE ALARM INSPECTION: need the stamped set of plans on site and the tile removed as marked on the plans / | BRIAN | BRIAN | | E= | R | 6435918 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 12/23/2019 | offices and staff lounge , exam rooms 20 down to #10 / still need the rest and need EP inspection / | BRIAN | BRIAN | | E= | P | 6435905 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/14/2019 | FIRE ALARM INSPECTION: rest of new fire alarm / just need to demo old system | BRIAN | BRIAN | | ER | P | 6399302 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/14/2019 | ceiling--ok --see plans / | BRIAN | BRIAN | | ER | P | 6399296 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/07/2019 | FIRE ALARM INSPECTION: above ceiling in work area and reception / | BRIAN | BRIAN | | ER | P | 6391750 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/07/2019 | ceilings ok --see plans / work area | BRIAN | BRIAN | | ER | P | 6391728 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/31/2019 | exam room ceilings / ok | BRIAN | BRIAN | | ER | P | 6384584 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/29/2019 | FIRE ALARM INSPECTION: office ceilings ok / see plans need tiles left out in rooms with blue marker for fire alarm demo of old devices / | BRIAN | BRIAN | | ER | P | 6382722 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/29/2019 | office ceilings/ ok see plans | BRIAN | BRIAN | | ER | P | 6382718 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 10/24/2019 | need to remove any border tile 12" or greater / | BRIAN | BRIAN | | ER | R | 6379030 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/10/2019 | Hard lids in 3 bathrooms, 2 nurses stations, and clean/soiled utility on south end okay | CHIPO | CHIPO | | ER | P | 6364493 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/10/2019 | FIRE ALARM INSPECTION: Hard lids in 3 bathrooms, 2 nurses stations, and clean/soiled utility on south end okay | CHIPO | CHIPO | | ER | P | 6364492 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/08/2019 | FIRE ALARM INSPECTION: conference room fire alarm boxes and pipe / | BRIAN | BRIAN | | ER | P | 6361237 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/08/2019 | entry, conference , hard lids marked on plans / | BRIAN | BRIAN | | ER | P | 6361234 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/25/2019 | FIRE ALARM INSPECTION: see Electrical plans, wall stubs only, no cable run, | JOHNN | JOHNN | | ER | P | 6347150 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/25/2019 | see plans, walls, Discussed accessibility requirements with contractor / | JOHNN | JOHNN | | ER | P | 6347149 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/18/2019 | FIRE ALARM INSPECTION: boxes and pipe only , no wire / ---walls | BRIAN | BRIAN | | ER | P | 6339676 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/18/2019 | walls see plans / | BRIAN | BRIAN | | ER | P | 6339673 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/10/2019 | walls see plans / break room , exam rooms | BRIAN | BRIAN | | ER | P | 6329869 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/26/2019 | 16 exam rooms / see plans / Discussed accessibility requirements with contractor / Discussed /GFCI/TR requirements / | BRIAN | BRIAN | | ER | P | 6314258 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 12/17/2019 | ALL FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6429284 |
MECHONE, INC. | H= | C | 12/16/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6428311 |
MECHONE, INC. | H= | P | 12/13/2019 | PARTIAL PENDING TAB REPORT NOTES: ALL BOXES / SA / RA MAINS / RUN OUTS / FINAL CONNECTIONS / GRILLES AND CONTROLS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6426822 |
OTIS ELEVATOR COMPANY | HE= | C | 12/13/2019 | ADDED REAR ENTRANCES FOR ELEVATORS 41 AND 42 | ERIC | ERIC | | HE= | C | 6426673 |
MECHONE, INC. | H= | P | 11/19/2019 | NEED EAST SIDE AND WEST SIDE IN THE FOLLOWING ROOMS - 5072 - 5075 - 5018 - 5001 AND TAB REPORT NOTES: ALL OTHER SA / RA GRILLES FINAL CONNECTIONS AND SOUND BOOTS ARE COMPLETE IN ALL OTHER ROOMS | JERRYF | JERRYF | | H= | P | 6404628 |
OLSON PLUMBING & HEATING COMPANY | HWP+ | C | 11/07/2019 | ALL PIPING COMPLETE INCLUDING FINAL CONNECTIONS - INCLUDING THE FOLLOWING ROOMS - 5036 THROUGH 5042 - ROOM 5002 - AND VAV 20 - ALL OK TO INSULATE | JERRYF | JERRYF | | HWP+ | C | 6392181 |
MECHONE, INC. | HSP | P | 10/25/2019 | WHILE LOOKING AT HWP PIPING NOTICED VAV 14 LACKS SERVICE ACCESS NOW BLOCKED BY SOFFIT | JERRYF | JERRYF | | HSP | P | 6380714 |
OLSON PLUMBING & HEATING COMPANY | HWP+ | P | 10/25/2019 | NEED THE FOLLOWING - HEATING PANELS AT ROOM 5002 - VAV 20 - HEATING PANELS FROM ROOM 5043 THROUGH 5036 NOTES: PRESSURE TEST AND PIPING OK ON THE FOLLOWING VAV'S 01 - 02 - 18 - 16 - 03 - 17 - 15 - 4 - 14 - 5 - 13 - 9 - 6 - 12 - 19 - 10 - 11 HEATING PANELS 5035 THROUGH 5018 OK TO INSULATE | JERRYF | JERRYF | | HWP+ | P | 6380709 |
MECHONE, INC. | HD | P | 10/01/2019 | THIS INSPECTION WAS FOR THE FOLLOWING - ALL OK ON THE FOLLOWING - VAV 5-21 LOW AND MEDIUM PRESSURE TIE INS MAINS AND RUN OUTS - VAV 5-16 AND VAV 5 -15 RELOCATED BOX - VAV 5 -12 AND VAV 5 -19 MEDIUM AND LOW PRESSURE MAINS AND RUN OUTS | JERRYF | JERRYF | | HD | P | 6353723 |
MECHONE, INC. | HD | P | 09/24/2019 | THIS INSPECTION WAS FOR THE FOLLOWING - NEED THE FOLLOWING - VAV 5-11 LOW PRESSURE TIE IN - VAV 5-04 LOW PRESSURE TIE IN - NEED PROPER ACCESS TO VAV 5-16 AND 5-15 - RE INSPECT WHEN READY - MEDIUM AND LOW PRESSURE OK AT THE FOLLOWING VAV BOXES - 5-12 - 5-13 - 5-09 - 5-07 - 5-14 - 5-05 - 5-17 - 5-16 - 5-03 - 5-21 | JERRYF | JERRYF | | HD | P | 6345554 |
MECHONE, INC. | HD | P | 09/13/2019 | NEED REVISED PLANS FOR THE FOLLOWING - REROUTED 14 X 10 DUCT PER NOTES DATED 8 /28 - REVISE PLANS DUCT CHANGES AT VAV 5-15 AND VAV 5 -10 REROUTED DUCT AND DUCT SIZING - NEED LOW PRESSURE SA RUN OUTS AT ROOMS 5061 AND CORRIDOR NOTES: THIS INSPECTION WAS FOR THE FOLLOWING - MEDIUM PRESSURE TIE IN AT VAV 5 - 04 OK - VAV 5 -04 MEDIUM PRESSURE TIE IN OK - VAV 5 - 01 AND VAV 5 -02 MEDIUM PRESSURE TIE INS OK - VAV 5 - 18 MEDIUM PRESSURE TIE IN OK - VAV 5 -06 ALL MEDIUM AND LOW PRESSURE MAINS AND RUN OUTS OK - VAV 5 - 08 - ALL MEDIUM AND LOW PRESSURE MAINS AND RUN OUTS OK - VAV 5- 07 ALL MEDIUM AND PRESSURE MAINS / RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6334334 |
MECHONE, INC. | HD | P | 08/28/2019 | LEVEL - 5 ( BDA 25) M205 : NEED REVISED AND APPROVED PLANS FOR REROUTED 14 X 10 MEDIUM PRESSURE DUCT. VAV - 5-16, 5-03, 5-04, 5-05, 5-07, 5-16 AND 5-18 - LOW PRESSURE DUCT ROUGH OK / OK TO WRAP. VAV-5-01, 5-02, 5-07 - LOW PRESSURE SUPPLY TRUNK LINE ONLY OK / OK TO WRAP. PARTIAL MEDIUM PRESSURE DUCT ROUGH OK / OK TO WRAP. NEED TO HIGHLIGHT APPROVED PLANS ON SITE AT NEXT INSPECTION. | LIDO | LIDO | | HD | P | 6316924 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 12/16/2019 | Ok. | DANR | DANR | | P= | C | 6428347 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 12/16/2019 | Ok. | DANR | DANR | | PTO | C | 6428346 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/20/2019 | Nail protection room 5070 , rest ok, plans marked. Note: At final check overhead domestic water insulation and DWV under belly. All toilets need 16"-18" side clearance off side wall at final. | DANR | DANR | | PTO | P | 6342334 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/12/2019 | Overhead corridor domestic water mains ok to insulate, plans marked., Room 5068 domestic water drops need nail protection, ok to insulate. | DANR | DANR | | PTO | P | 6332712 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/11/2019 | ok for in wall / over head dwv and h20, plans marked
still need circut setter @ rm #'s 5003 and 5074
still need remainder and under belly
NOTE: vtr (existing) hammer arrestor in ceiling above water closet @ rm # 5003 | JOHNS | JOHNS | | PTO | P | 6331045 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/23/2019 | Plans marked DWV in wall and overhead to corridor and domestic water in wall and mains ok, need underbelly on DWV, ok to insulate domestic water. | DANR | DANR | | PTO | P | 6311812 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 09/17/2019 | PAID (REC#1631484): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: okay new splice adjusted ventilation schedule, reroute and adjust ducts,showing supply and return ducts to VAV box 5-09 adjust gpm. | TCRIPPEN | TCRIPPEN | | XMS | T | 6338145 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 09/16/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Room 5013 going from storage to shared office E 205 | SHELBY | SHELBY | | XES | P | 6337078 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 09/16/2019 | PLAN SPLICE FEE: $0 by: SHANEN for Plumbing: 9/16/19: Delta 2 revisions pages P-001, P-002, PD-204, PD-205, P-204, P-205, P-500 | SHANEN | SHANEN | | XPS | P | 6335786 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 09/13/2019 | PAID (REC#1629990): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Floor plan revision | MICHAELA | MICHAELA | | XBS | T | 6335165 |
HENSEL PHELPS CONSTRUCTION CO | XBS | P | 08/28/2019 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Add wall type - clarify demansions | MICHAELA | MICHAELA | | XBS | P | 6317336 |