WESTERN FIREPLACE SUPPLY, INC. | B= | C | 09/09/2020 | Corrections made / Pending other inspections | JASONL | JASONL | | B= | C | 6700696 |
CLANCY BUILDING & DESIGN, LLC | B= | P | 09/09/2020 | Corrections made / Pending other inspections -- Schedule a new Building Final when above items are complete. | JASONL | JASONL | | B= | P | 6700217 |
CLANCY BUILDING & DESIGN, LLC | B= | P | 08/20/2020 | Need to daylight downspout at SE corner of garage / Need to install tip out at back of home by fireplace pop out / Rest OK // A/C installed / No deck / Crawlspace -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NICHOLEM | NICHOLEM | | B= | P | 6679794 |
CLANCY BUILDING & DESIGN, LLC | BFR | C | 08/20/2020 | Corrections complete | NICHOLEM | NICHOLEM | | BFR | C | 6679790 |
CLANCY BUILDING & DESIGN, LLC | BIN | C | 08/20/2020 | Documents received | NICHOLEM | NICHOLEM | | BIN | C | 6679259 |
CLANCY BUILDING & DESIGN, LLC | BSP | P | 08/20/2020 | Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file / | NICHOLEM | NICHOLEM | | BSP | P | 6679253 |
CLANCY BUILDING & DESIGN, LLC | BIN | P | 03/27/2020 | Complete BFR - Provide installers certificate for blown in insulation in walls - Provide installers certificate and ES report for spray foam used at rims in crawlspace | TIMOTHYS | TIMOTHYS | | BIN | P | 6524018 |
CLANCY BUILDING & DESIGN, LLC | BFR | P | 03/27/2020 | Still need to glue shims in beam pocket East end of crawlspace center beam - Other items corrected | TIMOTHYS | TIMOTHYS | | BFR | P | 6524015 |
CLANCY BUILDING & DESIGN, LLC | BFR | P | 03/20/2020 | Need 3 lags for ledger at kitchen / Need to glue shims in beam pockets / All other framing items completed | NICK | NICK | | BFR | P | 6517466 |
CLANCY BUILDING & DESIGN, LLC | BFR | P | 03/20/2020 | Eng on file for use of 4x4 post in place of 3 2x4 under LVL / Still need re inspection for framing | NICK | NICK | | BFR | P | 6516665 |
CLANCY BUILDING & DESIGN, LLC | BLA | C | 03/17/2020 | | NICK | NICK | | BLA | C | 6513498 |
CLANCY BUILDING & DESIGN, LLC | BFD | C | 03/17/2020 | Eng observation on file | NICK | NICK | | BFD | C | 6512498 |
CLANCY BUILDING & DESIGN, LLC | BFN | C | 03/17/2020 | Eng observation on file for foundation/ufer / Design on file with approved plans | NICK | NICK | | BFN | C | 6512497 |
CLANCY BUILDING & DESIGN, LLC | BFT | C | 03/17/2020 | Eng observation on file / Open hole on file / #2000psf / Drain usable / Foundation design on file with approved plans | NICK | NICK | | BFT | C | 6512490 |
CLANCY BUILDING & DESIGN, LLC | BFR | T | 03/06/2020 | PAID (REC#1668649): No truss calcs with approved plans on computer / Need to splice in truss calcs to plans / Need open hole report, need 3rd party observations for footing/foundation/drain / Need to install 2 LTS20 straps for glue lamb upper level both ends / Need to install diagonal 2x4 bracing at tail end of rafters for roll bocking per approved plans / Need to install double 2x6 studs at front enty balloon frame wall per approved plans / Need to install H2.5T for MC3 trusses at front entry / Need to install 3 SDS screws for ledgers throughout per approved plans, 2 SDS screws installed at time of inspection / F01G 2 ply installed in garage and not shown on plans in garage / Need to install double H2.5T for all F01 trusses in garage per approved plans / Need to install LTS18 straps for post to beam of front porch at garage wall / Need to install anchor bolts with in 12" of sill plate breaks / Need to install LS30's for all 2x4 outriggers / Missing Steel post | NICK | NICK | | BFR | T | 6503325 |
CLANCY BUILDING & DESIGN, LLC | BSP | P | 02/14/2020 | Front porch lid and posts OK / All shear straps and nailing OK / Still need open hole report / Still need 3rd party observations for footing/foundation/drain | NICK | NICK | | BSP | P | 6483029 |
CLANCY BUILDING & DESIGN, LLC | BSP | P | 02/03/2020 | Porch and shear inspection / Missing post at front porch / Need 3 SDS screws for ledger at front porch ledger / Missing MST37 straps per detail ** on approved plans for upper level shear / All other hold downs OK / Shear nailing OK | NICK | NICK | | BSP | P | 6472739 |
J2D ELECTRIC, INC. | E= | C | 07/23/2020 | a/c pre wire only/ | JOHNN | JOHNN | | E= | C | 6648381 |
J2D ELECTRIC, INC. | ES | C | 02/28/2020 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | BRETC | BRETC | | ES | C | 6495791 |
J2D ELECTRIC, INC. | ER | C | 02/28/2020 | Corrections made. | BRETC | BRETC | | ER | C | 6495784 |
J2D ELECTRIC, INC. | ES | R | 02/27/2020 | Residential Underground: Load side service conductors on all 6 ends ringed to deep into aluminum conductor , need to replace /New Res / 200 amp 3/w / | BRETC | BRETC | | ES | R | 6494736 |
J2D ELECTRIC, INC. | ER | R | 02/27/2020 | In garage, HR wires and garage wiring need protection from metal framing gussets in ceiling, No NM pulled tight touching sharp metal edges. / 200 amp 3/w / Irreversible Ufer / No Mcc / No Central Vac / 3 #8 Al ser / no jet tub / crawler. | BRETC | BRETC | | ER | R | 6494726 |
ARROW HAWK HEATING, LLC | H= | C | 06/25/2020 | NOTE/ WHOLE HOUSE VENTILATION SWITCH LOCATED AT FURNACE / A/C ROUGH, LINESET ONLY / DIRECT VENT FURNACE / DIRECT VENT WATER HEATER / | DAVIDH | DAVIDH | | H= | C | 6617495 |
DAVIS GAS SHOP INC | HC | C | 03/04/2020 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 6500074 |
DAVIS GAS SHOP INC | HI | C | 03/04/2020 | RECEIVED 2 LB LETTER | DAVIDH | DAVIDH | | HI | C | 6500064 |
ARROW HAWK HEATING, LLC | HRR | C | 03/02/2020 | WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN LAUNDRY ROOM / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL / A/C ROUGH, COIL AND LINESET / DIRECT VENT FURNACE / DIRECT VENT WATER HEATER / | DAVIDH | DAVIDH | | HRR | C | 6497591 |
DAVIS GAS SHOP INC | HI | P | 02/28/2020 | 2 LB SYSTEM 10 LB TEST OK/ PENDING 2 LB LETTER/ 1 1 COOKTOP / 1 FIREPLACE / 1 FURNACE / 1 WATER HEATER / | DAVIDH | DAVIDH | | HI | P | 6496719 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 02/03/2020 | NOTE/ MAIN LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / | DAVIDH | DAVIDH | | HV | C | 6472705 |
TIMBERWOLF PLUMBING, INC. | P= | C | 07/30/2020 | | SAMH | SAMH | | P= | C | 6655435 |
TIMBERWOLF PLUMBING, INC. | PTO | C | 03/02/2020 | note: no irrigation, aav @ LH master lav, hall bath lav, cwv @ laundry sink, at final check water heater removal clearance | JOSEPHD | JOSEPHD | | PTO | C | 6497101 |
CLANCY BUILDING & DESIGN, LLC | XBS | P | 03/10/2020 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | P | 6505439 |