PEAK PROFESSIONAL CONTRS INC | B= | C | 10/17/2019 | | DAKOTAB | DAKOTAB | | B= | C | 6371487 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 10/10/2019 | Temp CO: Pending Mechanical final ( Expires: 11/9/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6365130 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 10/09/2019 | Items corrected -- Building final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6363556 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 10/04/2019 | Service counter not 36" in length -- Need to complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6358435 |
PEAK PROFESSIONAL CONTRS INC | B= | R | 10/02/2019 | No ready for final inspection -- Reviewed accessible elements with contractor and requirements for building final inspection. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, MIDWAY PLUMBING LLC Plumbing Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6355323 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 08/27/2019 | attach mechanical and electrical permits/complete other roughs -- frame is per plan/reviewed accessibility | SCOTTS | SCOTTS | | BFR | P | 6315790 |
EL PASO ELECTRIC, LLC. | E= | C | 10/09/2019 | Retail finish complete---RTUs existing and protected with type R fuses | CHIPO | CHIPO | | E= | C | 6363805 |
EL PASO ELECTRIC, LLC. | E= | R | 10/03/2019 | Not complete / | ROB | ROB | | E= | R | 6357068 |
EL PASO ELECTRIC, LLC. | ER | R | 10/03/2019 | Tracks need suuport every 4' / Panel needs working space clearance, could not check / Need access to HWH / Need roof access / | ROB | ROB | | ER | R | 6357063 |
EL PASO ELECTRIC, LLC. | ES | C | 09/11/2019 | Commercial / 200 amp 4 wire / Ok to set 1 meter / | ROB | ROB | | ES | C | 6332004 |
EL PASO ELECTRIC, LLC. | ES | R | 09/05/2019 | Need to meet and open main switchgear / Panel ok / | ROB | ROB | | ES | R | 6325125 |
EL PASO ELECTRIC, LLC. | ER | P | 08/29/2019 | Rough ok for 2- bathroom walls and ceilings / | ROB | ROB | | ER | P | 6318869 |
AIRTECH MECHANICAL, INC. | H= | C | 10/17/2019 | HEAT FINAL OK . | LIDO | LIDO | | H= | C | 6371354 |
AIRTECH MECHANICAL, INC. | H= | P | 10/09/2019 | RECEIVED TEST AND BALANCE REPORT. PARTIAL PENDING : STORAGE ROOM # 103 NOW HAS AN OPEN CEILING AND DUCT IS EXPOSED / NEED REVISED AND APPROVED MECHANICAL PLAN. LABEL THERMOSTATS FOR THE RTU THEY CONTROL. | LIDO | LIDO | | H= | P | 6362566 |
AIRTECH MECHANICAL, INC. | H= | P | 10/08/2019 | PARTIAL PENDING : STORAGE ROOM # 103 NOW HAS AN OPEN CEILING AND DUCT IS EXPOSED / NEED REVISED AND APPROVED MECHANICAL PLAN. LABEL THERMOSTATS FOR THE RTU THEY CONTROL. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6362354 |
AIRTECH MECHANICAL, INC. | HD | C | 08/28/2019 | STORAGE ROOM # 103 NOW HAS AN OPEN CEILING AND DUCT IS EXPOSED / NEED REVISED AND APPROVED PLANS . ALL DUCT ROUGH AND GRILLS AND REGISTERS OK. ROOF OK . BY FINAL NEED THERMOSTATS INSTALLED WITH THE TOP NO HIGHER THAN 48" ABOVE FINISHED FLOOR. NEED TEST AND BALANCE REPORT | LIDO | LIDO | | HD | C | 6317803 |
MIDWAY PLUMBING LLC | P= | C | 10/04/2019 | tenant finish | TED | TED | | P= | C | 6358365 |
MIDWAY PLUMBING LLC | PTO | C | 08/29/2019 | Correction made. | DANR | DANR | | PTO | C | 6318390 |
MIDWAY PLUMBING LLC | PTO | P | 08/28/2019 | need to insulate hot water piping, rest ok | TED | TED | | PTO | P | 6317290 |
MIDWAY PLUMBING LLC | PB | C | 08/19/2019 | correction made, spliced plan set on site | TED | TED | | PB | C | 6305376 |
MIDWAY PLUMBING LLC | PB | P | 08/16/2019 | need 18'' between toilets and sancross on back to back toilets, insulate hot water piping under slab, need plan splice on dwv changes | TED | TED | | PB | P | 6303511 |
AIRTECH MECHANICAL, INC. | XMS | P | 10/16/2019 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: changed from drop ceiling to no ceiling | DALEH | DALEH | | XMS | P | 6369915 |
PEAK PROFESSIONAL CONTRS INC | XBS | P | 08/19/2019 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Revised floor plan | SHELLEY | SHELLEY | | XBS | P | 6305095 |
MIDWAY PLUMBING LLC | XPS | T | 08/19/2019 | PAID (REC#1623217) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 8/19/19: Delta 1 revisions P001 adjusted schedules and calculations P111 & P112 deleted island sinks, added KS1 and piping | SHANEN | SHANEN | | XPS | T | 6305066 |