HAMMERS CONSTRUCTION, INC | B= | C | 10/24/2019 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6379570 |
HAMMERS CONSTRUCTION, INC | B= | P | 10/24/2019 | pending fire final/rest ok. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | SCOTTS | SCOTTS | | B= | P | 6379296 |
HAMMERS CONSTRUCTION, INC | BFR | P | 10/17/2019 | framing for med gas vent chase an ceiling drop hard lid over med gas cabinets OK / did courtesy walk for final and discussed accessible elements and door latches and handles | DANE | DANE | | BFR | P | 6372011 |
HAMMERS CONSTRUCTION, INC | BSP | P | 09/27/2019 | no rated walls no above ceiling needed / all walls at perimeter of suite are existing and no new penetrations / all framing complete at this job | DANE | DANE | | BSP | P | 6351083 |
HAMMERS CONSTRUCTION, INC | BFR | P | 09/09/2019 | pending other required inspections fire block complete at corner of conference room | LONNYS | LONNYS | | BFR | P | 6329016 |
HAMMERS CONSTRUCTION, INC | BFR | R | 09/06/2019 | Great Stuff fire block is for use in type VB construction only - need to remove all foam used as fire stop in type IIIB rated floor ceiling assembly at multiple flex conduits at corner of conference room and replace with an approved fire block material | DANE | DANE | | BFR | R | 6326840 |
HAMMERS CONSTRUCTION, INC | BFR | P | 09/05/2019 | interior light gauge framing OK pending other roughs / need to see fire stopping at flex conduits through floor at northeast corner of consult room in wall and will need to do above ceiling at all new penetrations in existing rated assemblies before ceiling tiles are dropped | DANE | DANE | | BFR | P | 6325330 |
SYSTEMS ELECTRIC, INC. | E= | C | 10/22/2019 | corrections made---ef-2 ok | RANDY | RANDY | | E= | C | 6376854 |
SYSTEMS ELECTRIC, INC. | E= | P | 10/16/2019 | partial final, need EF-1, Xray, outlet in vacuum closet has no power | RANDY | RANDY | | E= | P | 6370301 |
SYSTEMS ELECTRIC, INC. | E= | C | 10/16/2019 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6370300 |
SYSTEMS ELECTRIC, INC. | ER | C | 10/16/2019 | FIRE ALARM INSPECTION: FA complete | RANDY | RANDY | | ER | C | 6370295 |
SYSTEMS ELECTRIC, INC. | ER | P | 10/11/2019 | FIRE ALARM INSPECTION: FA rough ok | RANDY | RANDY | | ER | P | 6365673 |
SYSTEMS ELECTRIC, INC. | ER | P | 10/11/2019 | ceilings ok | RANDY | RANDY | | ER | P | 6365662 |
SYSTEMS ELECTRIC, INC. | ER | C | 09/04/2019 | all walls ok | RANDY | RANDY | | ER | C | 6323886 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 10/24/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6378657 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 10/23/2019 | MECHANICAL FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6378609 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 10/15/2019 | PLANS HAVE NOT BEEN APPROVED FOR CHANGES TO MED GAS YET. NEED TO VERIFY INSTALL MATCHES PLAN WHEN NEW PLAN IS ATTACHED TO PERMIT. WHAT IS INSTALLED, TWO 6" ROUND DUCTS ATTACHED TO CABINETS TIE INTO ONE 8" ROUND DUCT TO EXHAUST FAN ON ROOF. STILL NEED TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6369010 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 09/30/2019 | GENERAL CONTRACTOR HAS SET OF PLANS FOR CHANGES, ADDED EXHAUST AND TRANSFER WITH FIRE DAMPERS FOR MED GAS ROOM. NEED PLANS APPROVED AND SCANNED ONTO PERMIT AND INSPECTIONS WHEN INSTALLED. ALL FLEX AND DIFFUSERS AND THERMOSTATS INSTALLED. PROVIDE TEST AND BALANCE REPORT FOR FINAL | DUSTINS | DUSTINS | | H= | P | 6352709 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 09/30/2019 | PICTURE OF NAIL PROTECTION FOR DRYER EXHAUST RECEIVED, SEE IMAGES. | DUSTINS | DUSTINS | | H= | P | 6351706 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 09/04/2019 | DRYER EXHAUST DUCT NEEDS NAIL PROTECTION AT TOP PLATE. NEW SUPPLY AIR DUCTS OK, OK TO WRAP. NO FLEX AND DIFFUSERS. NO ROOF TODAY TO VERIFY DRYER EXHAUST TERMINATION. MOUNT RELOCATED THERMOSTATS NO HIGHER THAN 48" ABOVE FINISHED FLOOR. | DUSTINS | DUSTINS | | HD | P | 6323702 |
MARTINSON MECHANICAL, INC | P= | C | 10/23/2019 | Dental vacuum waste direct tie in at service sink. Condensate hose piped to floor sink. Office toilet pre existing non conforming. | SAMH | SAMH | | P= | C | 6378230 |
MARTINSON MECHANICAL, INC | PTO | P | 09/03/2019 | Need to have direct tie in for dental vacuum waste. Rest ok. Note: VTR. | SAMH | SAMH | | PTO | P | 6322271 |
SYSTEMS ELECTRIC, INC. | XES | P | 10/16/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Re-approved splice - added EF-2. | BERTHA | BERTHA | | XES | P | 6370972 |
NIELSEN MECHANICAL CONTRACTORS, INC. | XMS | T | 10/16/2019 | PAID (REC#1637995) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised med gas | JUSTINC | JUSTINC | | XMS | T | 6370893 |
HAMMERS CONSTRUCTION, INC | XBS | P | 10/07/2019 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Rearrage walls | MICHAELA | MICHAELA | | XBS | P | 6360483 |
SYSTEMS ELECTRIC, INC. | XES | P | 10/02/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Moved EF-1 to Panel L2. | BERTHA | BERTHA | | XES | P | 6355736 |
HAMMERS CONSTRUCTION, INC | XBS | T | 10/01/2019 | PAID (REC#1637996) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Med gas duct enclosure | LBENNETT | LBENNETT | | XBS | T | 6353275 |
SYSTEMS ELECTRIC, INC. | XES | P | 10/01/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added exhaust fan to power plan. | BERTHA | BERTHA | | XES | P | 6353215 |