GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 07/02/2020 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6625834 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/30/2020 | final OK pending other finals. Additional Inspections Required (computer generated): U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6623109 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/11/2019 | final OK pending other finals. Additional Inspections Required (computer generated): U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6394762 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/17/2019 | all above ceiling penetrations and fire tape OK pending other roughs | DANE | DANE | | BSP | P | 6372741 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/17/2019 | hard lid framing OK pending other roughs | DANE | DANE | | BFR | P | 6372723 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 10/17/2019 | hard lid framing not ready / discussed with contractor that I would make a 2nd trip to inspect at end of day for both above ceiling and hard lid | DANE | DANE | | BFR | R | 6372003 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/16/2019 | first layer of rock on east wall OK / still need to inspect 2nd layer of rock at east wall and hard lid framing and all above ceiling penetrations inside of room above ceiling | DANE | DANE | | BSP | P | 6370542 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/15/2019 | shaft liner and shaft liner framing OK at east wall of fire alarm room | DANE | DANE | | BFR | P | 6368583 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/10/2019 | 2nd layer of rock at both sides of east wall and all penetrations above ceiling at outside of wall OK / all above ceiling penetrations at west wall at gift shop side OK | DANE | DANE | | BSP | P | 6364627 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/08/2019 | first layer of rock at east wall (UL U411 assembly) OK on both sides of wall - discussed inspection process for remainder of room | DANE | DANE | | BSP | P | 6361611 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/02/2019 | interior light gauge framing for east wall of fire alarm room OK | DANE | DANE | | BSP | P | 6354954 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/01/2019 | 3rd layer of rock OK at gift shop side of west wall - still need to inspect penetration above ceiling once ready / 2nd layer of rock OK at south wall of UL V455 inside of fire alarm room - still need to check penetrations above ceiling when ready | DANE | DANE | | BSP | P | 6354438 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 09/30/2019 | no new progress to inspect / site canceled and rescheduled for tomorrow | DANE | DANE | | BSP | R | 6352050 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/27/2019 | first layer of rock and attachments OK at UL V455 wall at south side of room / 2nd layer of rock at west wall still OK - OK to install the 3rd layer | DANE | DANE | | BSP | P | 6351141 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/26/2019 | shaft liner and shaft liner framing OK at UL V455 wall at south side of room and 2nd layer of rock at west wall on gift shop side of UL V449 OK pending other roughs | DANE | DANE | | BFR | P | 6348692 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/23/2019 | first layer of rock and attachments OK at UL V449 at west wall on gift shop side / discussed inspection process for remaining walls and discussed spliced in shaft liner wall for both ends of room and sequencing of wall construction | DANE | DANE | | BSP | P | 6344151 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 09/12/2019 | Talked to contractor on phone and discussed need for mechanical inspector to inspect damper framing / also discussed need for mechanical and electrical permits to be attached to this permit | DANE | DANE | | BSP | R | 6332555 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/06/2019 | west wall against gift shop light gauge wall framing OK - top and bottom tracks have been attached per assembly and studs OK / all pending need to attach mechanical and electrical permits and have inspections / please note that the mechanical inspector will need to inspect both damper framed openings in this wall / still need to inspect all other wall assemblies | DANE | DANE | | BSP | P | 6326780 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B16 | P | 09/03/2019 | met contractor in site office to discuss rated assemblies and inspection process for new smoke barriers at fire alarm room / plans show UL V455 as a shaft liner wall but when the assembly is looked up it is shown as a multiple layer of rock assembly / need to splice in corrected assembly for shaft liner wall at ends of room | DANE | DANE | | B16 | P | 6322089 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/30/2019 | need to attach mechanical and electrical permits / met contractor on site for consultation on rated assemblies for fore control room / looked at all 3 wall actual listings from UL and discussed need for all to have correct components installed in all walls and inspection process for all rated walls and need to build walls per UL listings and not how they have been detailed on the plans because the assembly was tested in the configuration that is described in UL listing | DANE | DANE | | BSP | P | 6320190 |
ENCORE ELECTRIC, INC. | E= | C | 10/30/2019 | | RANDY | RANDY | | E= | C | 6384299 |
ENCORE ELECTRIC, INC. | ER | C | 10/30/2019 | | RANDY | RANDY | | ER | C | 6383829 |
ENCORE ELECTRIC, INC. | ER | P | 10/03/2019 | fire command wall rough only | RANDY | RANDY | | ER | P | 6356858 |
ENCORE ELECTRIC, INC. | ER | P | 09/26/2019 | data and power box for monitor in fire panel room stubbed to ceiling | BRET | BRET | | ER | P | 6348656 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 07/02/2020 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. | NANCY | NANCY | | H= | C | 6625833 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 11/15/2019 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 6401452 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 10/17/2019 | DUCTS, DAMPERS, BREAK AWAY CONNECTIONS, RETAINING ANGLES AND DAMPER ACCESS DOORS ABOVE CEILING OK. STILL NEED TO SEE SUPPLY AND RETURN INSTALLED IN FIRE CONTROL ROOM. | NANCY | NANCY | | HD | P | 6372530 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 10/16/2019 | MECHANICAL CONTRACTOR NEEDS TO CALL FOR AN ABOVE CEILING INSPECTION BEFORE NEW DAMPERS AND DUCTS GET COVERED. PROVIDE INFORMATION ABOUT DAMPERS, ARE YOU INSTALLING GREENHECK? NEED TO KNOW SO I CAN GET THE DAMPER INSTALLATION INSTRUCTIONS. LOOKS LIKE BREAK AWAY CONNECTION ON ONE DAMPER HAS TOO MANY SCREWS. DAMPER ACCESS DOOR ON GIFT SHOP SIDE OF WALL IS ABOVE LARGE HOT WATER PIPES, IT APPEARS A PERSON WILL NOT BE ABLE TO ACCESS FIRE DAMPER TO RESET FUSIBLE LINK AND DAMPER. | NANCY | NANCY | | HD | P | 6370874 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 09/20/2019 | SUPPLY TRUNK LINE COMING FROM WHEEL CHAIR STORAGE IS NOT SHOWN ON PLANS BUT DOES GO THROUGH THE NEW RATED WALL FOR THE FIRE CONTROL ROOM. THAT SAME TRUNK LINE ALSO HAS A BRANCH DUCT TAKING OFF AND GOING THROUGH WHERE THE NEW RATED WALL IS ON THE NORTH END. THESE DUCTS AND PENETRATIONS ARE NOT SHOWN ON PLANS. NEED REVISED/APPROVED PLANS SHOWING ALL DUCTS AND DAMPERS REQUIRED. CONTRACTOR HAS A FRAMED DAMPER OPENING ON NEW WALL BETWEEN FIRE CONTROL AND WHEEL CHAIR STORAGE FOR THE EXISTING SUPPLY DUCT, FRAMED OPENING OK. SUPPLY AND RETURN AIR DAMPER OPENINGS ON GIFT SHOP WALL OK. OK TO INSTALL DAMPERS, WILL NEED TO SEE DAMPERS, BREAK AWAY CONNECTIONS AND ANGLES. | NANCY | NANCY | | HD | P | 6342155 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 09/18/2019 | PROPERLY FRAME SUPPLY AND RETURN DAMPER OPENINGS PER MANUFACTURER'S INSTRUCTIONS. | NANCY | NANCY | | HD | P | 6340323 |
U.S. ENGINEERING CONSTRUCTION, LLC | XMS | T | 10/02/2019 | PAID (REC#1634509) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice for Fire Dampers | TCRIPPEN | TCRIPPEN | | XMS | T | 6355595 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 09/10/2019 | PAID (REC#1628644) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised listed assembly for wall S3 | LBENNETT | LBENNETT | | XBS | T | 6329440 |