JR WILDER CONSTRUCTION LLC | B= | C | 10/11/2023 | Items corrected. | NATHAN | NATHAN | | B= | C | 7884812 |
JR WILDER CONSTRUCTION LLC | B= | P | 10/05/2023 | Provide knee and toe protection at restroom sink drain, missing fire caulk at 2 penetrations in lobby wall/ screw pattern verified at corridor wall for rated assembly. -- Schedule a new Building Final when above items are complete. | NATHAN | NATHAN | | B= | P | 7879513 |
JR WILDER CONSTRUCTION LLC | BSP | P | 04/03/2023 | Inspection request called as B= and changed to a BSP inspection. All required final inspections need to be partial or completed. No inspection completed. | NATHAN | NATHAN | | BSP | P | 7705423 |
JR WILDER CONSTRUCTION LLC | BE | L | 03/20/2023 | Renewed for $232.00 at 3/20/2023 2:33:20 PM (Receipt#1940829) | JANE | JANE | | BE | L | 7692588 |
JR WILDER CONSTRUCTION LLC | BFR | P | 08/17/2022 | 1st floor corridor walls frame okay, call when drywall is installed and penetrations are fire caulked. | NATHAN | NATHAN | | BFR | P | 7485989 |
JR WILDER CONSTRUCTION LLC | BSP | R | 03/04/2022 | U404 needs USG drywall, American Gypsum used at 8" oc, need screws and seams mud and taped before cover / with penetrations needing corrected, will need above ceiling marking installed per IBC 703.6 . complete mechanical connections at wall and inspections, | NATHAN | NATHAN | | BSP | R | 7290645 |
JR WILDER CONSTRUCTION LLC | BSP | P | 02/24/2022 | Mineral wool insulation in wall per U404 with complete required inspections . | NATHAN | NATHAN | | BSP | P | 7281514 |
JR WILDER CONSTRUCTION LLC | BSP | P | 12/28/2021 | One side of rated walls, drywall OK / Need firestop details for all penetrating items | JEREMYA | JEREMYA | | BSP | P | 7222162 |
JR WILDER CONSTRUCTION LLC | BFR | P | 10/29/2021 | Rear egress walls not ready at this time / with completed required inspections frame okay / discussed U404 proprietary USG and assembly / rear egress walls not ready at this time. | NATHAN | NATHAN | | BFR | P | 7160126 |
JR WILDER CONSTRUCTION LLC | BE | L | 10/28/2021 | Renewed online for 1/2 Fee at 10/28/2021 11:08:50 AM (RECEIPT #: 1818541) | WEBSITE | WEBSITE | | BE | L | 7158009 |
JR WILDER CONSTRUCTION LLC | BFR | P | 02/25/2021 | Discussed rated walls, penetrations and explained damper framing is mechanical departments call for construction. no inspection performed. | NATHAN | NATHAN | | BFR | P | 6881347 |
JR WILDER CONSTRUCTION LLC | BE | C | 10/22/2020 | | GITA | GITA | | BE | C | 6751076 |
JR WILDER CONSTRUCTION LLC | BE | T | 10/22/2020 | PAID (REC#1723835) | GITA | GITA | | BE | T | 6751064 |
JR WILDER CONSTRUCTION LLC | BFR | R | 04/29/2020 | need support at ceiling framing and U404 A wall type on plan need mechanical to look at damper framing. frame not completed | NATHAN | NATHAN | | BFR | R | 6555549 |
JR WILDER CONSTRUCTION LLC | BE | L | 02/26/2020 | Renewed for No Fee at 2/26/2020 10:29:51 AM | LUKES | LUKES | | BE | L | 6492824 |
UPGRADE ELECTRIC LLC | E= | C | 05/05/2023 | | BRIAN | BRIAN | | E= | C | 7736943 |
S.G.S | ER | P | 02/22/2022 | walls and hard lids / need several access door to j boxes and lb's in hard lid ceilings marked on plans in orange / needs to be 18'x18' min / verify on final / need plans spliced to reflect what has been deleted for power and lights / | BRIAN | BRIAN | | ER | P | 7278524 |
S.G.S | EE | L | 02/18/2022 | Renewed for No Fee at 2/18/2022 2:14:21 PM | DEAN | DEAN | | EE | L | 7276458 |
ENCORE ELECTRIC, INC. | E= | C | 02/01/2022 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 7257165 |
ENCORE ELECTRIC, INC. | ER | C | 02/01/2022 | FIRE ALARM INSPECTION: fire alarm ok / | BRIAN | BRIAN | | ER | C | 7257154 |
ENCORE ELECTRIC, INC. | E= | C | 02/01/2022 | FIRE ALARM INSPECTION: fire alarm ok / | BRIAN | BRIAN | | E= | C | 7257155 |
S.G.S | EE | L | 08/04/2021 | Renewed for No Fee at 8/4/2021 1:02:47 PM | VERONIKAP | VERONIKAP | | EE | L | 7060465 |
S.G.S | EE | L | 09/18/2020 | Renewed online for 1/2 Fee at 9/18/2020 7:33:23 AM (RECEIPT #: 1714112) | WEBSITE | WEBSITE | | EE | L | 6710319 |
ADLM INC | H= | C | 05/18/2023 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 7747689 |
ADLM INC | H= | P | 05/16/2023 | FINAL PENDING - Provide test and balance report. DAMPER ANGLES, ACCESS DOORS, DIFFUSERS AND GRILL COMPLETE.
| MARKB | MARKB | | H= | P | 7745812 |
THAYER MECHANICAL SERVICES, LLC | HE | L | 03/16/2023 | Renewed for $100.00 at 3/16/2023 10:01:03 AM (Receipt#1940105) | AMYP | AMYP | | HE | L | 7689060 |
SM PLUMBING & MECHANICAL, LLC | H= | C | 12/29/2022 | CORRECTIONS MADE | MARKB | MARKB | | H= | C | 7622483 |
SM PLUMBING & MECHANICAL, LLC | H= | P | 12/28/2022 | Gas shutoff valve needs to be installed in piping within 6' of water heater. Gas piping needs to be elevated off floor. | MARKB | MARKB | | H= | P | 7621650 |
SM PLUMBING & MECHANICAL, LLC | H= | L | 12/27/2022 | LOCK BOX CODE PROVIDED DOE NOT WORK. | MARKB | MARKB | | H= | L | 7620092 |
SM PLUMBING & MECHANICAL, LLC | HC | C | 08/26/2022 | RELEASE METER | MARKB | MARKB | | HC | C | 7497492 |
SM PLUMBING & MECHANICAL, LLC | HI | C | 08/26/2022 | Still need gas connection to water heater. | MARKB | MARKB | | HI | C | 7497490 |
SM PLUMBING & MECHANICAL, LLC | HI | L | 08/11/2022 | STILL NEED CONTRACTOR ATTACHED TO PERMIT FOR WATER HEATER VENT. GAS PIPING NOT CONNECTED TO WATER HEATER. CONTRACTOR NOT ON SITE AT THIS TIME. | MARKB | MARKB | | HI | L | 7479829 |
SM PLUMBING & MECHANICAL, LLC | HE | L | 08/10/2022 | Renewed for $50.00 at 8/10/2022 12:19:45 PM (Receipt#1890469) | BRITNEY | BRITNEY | | HE | L | 7477931 |
THAYER HEATING AND AIR CONDITIONING | HD | P | 07/13/2022 | FIRE DAMPER ANGLES AND ACCESS DOORS COMPLETE EXCEPT - Angles on business side of 24x12 damper need to be sucked up tight to sleeve. | MARKB | MARKB | | HD | P | 7444798 |
THAYER HEATING AND AIR CONDITIONING | HD | P | 04/25/2022 | ANNULAR SPACE AROUND FIRE DAMPERS OK. | MARKB | MARKB | | HD | P | 7351455 |
THAYER HEATING AND AIR CONDITIONING | HSP | P | 04/22/2022 | ON SITE CONSULT FOR DAMPERS WITH BUSINESS OWNER - WILL NEED ANGLES REMOVED FROM FIRE DAMPERS. DAMPERS LACK REQUIRED ANNULAR SPACE. CALL FOR ANNULAR SPACE INSPECTION BEFORE ANGLES ARE REINSTALLED. WHEN ANGLES ARE INSTALLED, WILL NEED ANGLE CORNERS TO OVERLAP AND ANNULAR SPACE COVERED WITH ANGLES EXTENDING OVER DRYWALL 1" MINIMUM PER MANUFACTURER INSTRUCTIONS. | MARKB | MARKB | | HSP | P | 7348761 |
SM PLUMBING & MECHANICAL, LLC | HE | L | 01/11/2022 | Renewed online for Half Fee at Jan 11 2022 10:03AM (RECEIPT #: 1835512) | WEBSITE | WEBSITE | | HE | L | 7234842 |
THAYER HEATING AND AIR CONDITIONING | HD | P | 12/15/2021 | DAMPER INSPECTION - 24X12, 12X8, 16X10 & 16X12 DAMPER OPENINGS OK TO INSTALL DAMPERS - Will need damper instructions on site for annular space inspection before angles are installed. | MARKB | MARKB | | HD | P | 7210219 |
THAYER HEATING AND AIR CONDITIONING | HD | P | 10/29/2021 | INSPECTION FOR FIRE DAMPER FRAMING FOR 24"X 12" SUPPLY TRUNK AT VESTIBULE AND 12"X 8" SUPPLY DUCTS TO LOUNGE AREA X3 OK. | PAULO | PAULO | | HD | P | 7160326 |
THAYER HEATING AND AIR CONDITIONING | HSP | P | 09/09/2021 | Had on site consult for fire damper framing - need dampers and duct removed, framing completed and inspected before dampers get re installed. VAV SERVICE SPACE HAS BEEN CORRECTED FOR BOTH UNITS. | MARKB | MARKB | | HSP | P | 7102244 |
THAYER HEATING AND AIR CONDITIONING | HD | L | 09/08/2021 | Called contractor from site - no one able to meet on site. Contractor will reschedule | MARKB | MARKB | | HD | L | 7100156 |
SM PLUMBING & MECHANICAL, LLC | HE | L | 06/02/2021 | Renewed for $100.00 at 6/2/2021 8:18:13 AM (Receipt#1777492) | BRITNEY | BRITNEY | | HE | L | 6987517 |
THAYER HEATING AND AIR CONDITIONING | HSP | P | 04/21/2021 | ON SITE CONSULT WITH CONTRACTOR - OTHER CONTRACTOR STARTED JOB AND DISCUSSED WHAT INSPECTIONS ARE NEEDED FOR FIRE DAMPERS - NEED TO REMOVE DAMPERS AND FRAME PER MANUFACTURER INSTRUCTIONS. AT TIME OF DAMPER FRAMING INSPECTION WILL NEED DAMPER INSTALL INSTRUCTIONS PROVIDED. WILL NEED INSPECTIONS FOR ANNULAR SPACE, ANGLES, BREAKAWAY CONNECTIONS AND ACCESS DOORS. BOTH VAV'S LACK REQUIRED SERVICE SPACE. STILL NEED WATER HEATER VENT INSPECTIONS. | MARKB | MARKB | | HSP | P | 6942106 |
THAYER HEATING AND AIR CONDITIONING | HD | P | 04/21/2021 | ABOVE CEILING DUCT - SUPPLY MAINS/BRANCHES FOR VAV'S B01 & B02 INSTALLED PER PLAN BUT VAV'S LACK REQUIRED SERVICE SPACE AND STILL NEED RETURN BY LIQUOR VAULT. | MARKB | MARKB | | HD | P | 6942093 |
THAYER HEATING AND AIR CONDITIONING | H= | L | 03/17/2021 | WAIVED TRIP FEE WRONG PERMIT CALLED FOR INSPECTION - NOTIFIED CALL AHEAD AND CANCELED INSPECTION - CONTRACTOR TO VERIFY WHICH ADDRESS IS TO BE INSPECTED | JERRYF | JERRYF | | H= | L | 6902041 |
PIERCE AIR & HEATING, INC | HD | L | 01/04/2021 | CHANGED INSPECTION TO HD - AUTO CALL COMPLETE AT 12:50 - NO ACCESS AT 1:20 - PER CONVERSATION WITH CONTRACTOR INSPECTION WAS TO START C AND C PROCESS | JERRYF | JERRYF | | HD | L | 6824542 |
PIERCE AIR & HEATING, INC | HE | L | 11/30/2020 | Renewed for No Fee at 11/30/2020 9:54:01 AM | VERONIKAP | VERONIKAP | | HE | L | 6790262 |
SM PLUMBING & MECHANICAL, LLC | HI | L | 04/06/2020 | CANCELED BY CONTRACTOR AT CALL AHEAD WRONG PERMIT CALLED FOR INSPECTION | JERRYF | JERRYF | | HI | L | 6531924 |
SM PLUMBING & MECHANICAL, LLC | HI | P | 10/18/2019 | NEED HVAC MECHANICAL CONTRACTOR ATTACHED TO PERMIT BEFORE METER RELEASE - AT FUTURE INSPECTION VERIFY FINAL CONNECTION AT WATER HEATER - NEED WATER HEATER VENT ADDED TO PERMIT AND INSPECTION CALLED WHEN READY PRESSURE TEST OK AND PIPING PER PLAN | JERRYF | JERRYF | | HI | P | 6373504 |
SM PLUMBING & MECHANICAL, LLC | HI | L | 10/17/2019 | CONTRACTOR CANCELED INSPECTION HE WILL RESCHEDULE | JERRYF | JERRYF | | HI | L | 6371908 |
SM PLUMBING & MECHANICAL, LLC | P= | C | 12/27/2022 | | CODYP | CODYP | | P= | C | 7619697 |
SM PLUMBING & MECHANICAL, LLC | PE | L | 08/10/2022 | Renewed for $50.00 at 8/10/2022 12:19:45 PM (Receipt#1890469) | BRITNEY | BRITNEY | | PE | L | 7477930 |
SM PLUMBING & MECHANICAL, LLC | PE | L | 01/11/2022 | Renewed online for Half Fee at Jan 11 2022 10:03AM (RECEIPT #: 1835512) | WEBSITE | WEBSITE | | PE | L | 7234841 |
SM PLUMBING & MECHANICAL, LLC | PB | C | 07/09/2021 | | JOHNS | JOHNS | | PB | C | 7030271 |
SM PLUMBING & MECHANICAL, LLC | PE | L | 06/02/2021 | Renewed for $100.00 at 6/2/2021 8:18:13 AM (Receipt#1777492) | BRITNEY | BRITNEY | | PE | L | 6987518 |
SM PLUMBING & MECHANICAL, LLC | PE | L | 06/03/2020 | Renewed online for 1/2 Fee at 6/3/2020 9:31:41 PM (RECEIPT #: 1685309) | WEBSITE | WEBSITE | | PE | L | 6592831 |
SM PLUMBING & MECHANICAL, LLC | PTO | P | 10/18/2019 | pending revisions / e letter, refer to P16 results
ok for corrections made | JOHNS | JOHNS | | PTO | P | 6373221 |
SM PLUMBING & MECHANICAL, LLC | PTO | P | 10/17/2019 | need to add 1- hand sink to scope, 1 more f.d. to scope of work, and gas water htr (not elec)
need engineers letter allowing aav @ accessible bath in lieu of vtr (on plans)
pb still not complete / plan revisions, still need walls set @ 107, insulate waters / re circ to plan, set all flanges, nail pro where needed, strap pex every 32", re circ lines not per plan through out, rest ok. NOTE: ---VERIFY SCOPE UPDATED---03 ANSI, aav @ accessible lav, mop sink, and hand sink, vtr (existing) for rest, water htr looked @ on pto (PIPING ONLY, MECH TO LOOK @ GAS / VENTING), check water htr c/a @ final, NEED ENGINEERS LETTER for aav @ accessible lav
sub note-- REVISIONS COMPLETE | JOHNS | JOHNS | | PTO | P | 6371622 |
SM PLUMBING & MECHANICAL, LLC | PB | P | 10/04/2019 | engineer to address pipe sizing / hub drain
plans call out 3" drain @ floor sink, now its a 2" hub drain, re inspect all @ back of "house" drains
still need to run hand sink direct connect drain | JOHNS | JOHNS | | PB | P | 6357664 |
SM PLUMBING & MECHANICAL, LLC | P16 | P | 09/19/2019 | any plan revisions / engineers letter / special inspections will be posted here
1. engineer to address pipe sizing @ floor sink @ back of "house" drains, plans call for 3" tie in / 3" floor sink, contractor tied onto existing 2" drain w/ 2" hub drain wet vented through 2" hand sink line w/ revised plans--PB 10/4/19
2. need engineers letter allowing aav @ accessible lav in lieu of vtr (on plans)--PTO 10/17/19 | JOHNS | JOHNS | | P16 | P | 6340739 |
SM PLUMBING & MECHANICAL, LLC | PB | P | 09/19/2019 | OK for bath group / utility sink / and floor drain only (refer to P16). NOTE: partial status due to P16 notes, ok to cover areas inspected on 9/19/19 | JOHNS | JOHNS | | PB | P | 6340697 |
ENCORE ELECTRIC, INC. | XES | P | 04/14/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power, lighting and schedules. | BERTHA | BERTHA | | XES | P | 7717643 |
SM PLUMBING & MECHANICAL, LLC | XMS | P | 04/13/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised backgrounds, layout, CFM values, ventilation | JUSTINC | JUSTINC | | XMS | P | 7715106 |
JR WILDER CONSTRUCTION LLC | XBS | T | 04/12/2023 | PAID (REC#1950611): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions to architectural | DANM | DANM | | XBS | T | 7714885 |
SM PLUMBING & MECHANICAL, LLC | XPS | T | 06/29/2021 | PAID (REC#1787888) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: Added sheet P0.1 and adjusted sheet P3.1. | SHANEN | SHANEN | | XPS | T | 7018768 |