HENSEL PHELPS CONSTRUCTION CO | B= | C | 05/05/2020 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6560783 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 03/12/2020 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | BOBF | BOBF | | B= | P | 6508625 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 01/30/2020 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | BOBF | BOBF | | B= | P | 6469002 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/30/2019 | pending other required inspections / all light gauge steel wall framing OK / all light gauge steel framing for ceiling hard lid OK / discussed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 6383904 |
STURGEON ELECTRIC CO INC | E= | C | 01/02/2020 | | BRIAN | BRIAN | | E= | C | 6441544 |
STURGEON ELECTRIC CO INC | E= | P | 12/31/2019 | mens gfci not holding on left side of doorway / | BRIAN | BRIAN | | E= | P | 6440284 |
STURGEON ELECTRIC CO INC | ER | C | 11/06/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 6390428 |
STURGEON ELECTRIC CO INC | E= | C | 11/06/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6390429 |
STURGEON ELECTRIC CO INC | ER | R | 11/04/2019 | Electrical Rough ceilings ok, FA not complete ---------------do not sheetrock--------------- / | BRIAN | BRIAN | | ER | R | 6387449 |
STURGEON ELECTRIC CO INC | ER | P | 10/31/2019 | need rbd fire alarm rough in permit / ---pipe and boxes for fire alarm on walls ok | BRIAN | BRIAN | | ER | P | 6384652 |
STURGEON ELECTRIC CO INC | ER | P | 10/25/2019 | Electrical Rough ok, FA not complete ----walls only--------- / Discussed accessibility requirements with contractor / | BRIAN | BRIAN | | ER | P | 6380918 |
MESA PLUMBING & HEATING INC. | H= | C | 01/29/2020 | ALL OK | JERRYF | JERRYF | | H= | C | 6467329 |
MESA PLUMBING & HEATING INC. | H= | P | 01/28/2020 | PLAN REVISION IS COMPLETE - STILL NEED ALL OTHER NOTES FROM HI ADDRESSED | JERRYF | JERRYF | | H= | P | 6465737 |
COLORADO SHEET METAL CO., INC. | H= | C | 01/21/2020 | ENGINEER LETTER APPROVING TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6457456 |
COLORADO SHEET METAL CO., INC. | H= | P | 12/30/2019 | TEST AND BALANCE REPORT AND PICTURE OF FIRE DAMPER ACCESS DOOR STICKER RECEIVED, SEE IMAGES. FCU-1 HAS MULTIPLE SUPPLY READINGS OUTSIDE +/- 10%. NEED REVISED TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6438962 |
MESA PLUMBING & HEATING INC. | H= | P | 12/26/2019 | SEE HI NOTES DATED 12 / 26 /19 TO COMPLETE FINAL | JERRYF | JERRYF | | H= | P | 6436605 |
MESA PLUMBING & HEATING INC. | HI | C | 12/26/2019 | PRESSURE TEST OK - FOR FINAL STILL NEED PLAN REVISION FOR GAS LINE TO MATCH AS INSTALLED PER PREVIOUS NOTES - MEDIUM PRESSURE LABELS AT LOWER LEVEL OK TO ATTACH PICTURES OF LABELS TO NEXT INSPECTION REQUEST | JERRYF | JERRYF | | HI | C | 6436599 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/25/2019 | PARTIAL PENDING TAB REPORT AND PICTURE OF FIRE DAMPER ACCESS DOOR LABEL | JERRYF | JERRYF | | H= | P | 6409381 |
COLORADO SHEET METAL CO., INC. | HD | P | 11/07/2019 | THIS INSPECTION WAS FOR THE FOLLOWING - MEN'S / LOCKER / SHOWER AND RESTROOM NOTES: ABOVE CEILING SA / RA AND EXHAUST RUN OUT CONNECTIONS AND CABLE ACTUATORS ARE COMPLETE | JERRYF | JERRYF | | HD | P | 6392041 |
COLORADO SHEET METAL CO., INC. | HD | P | 11/06/2019 | ABOVE CEILING SA / RA / EXHAUST FINAL CONNECTIONS AND CABLE ACTUATORS OK AT WOMEN'S SHOWER / LOCKER / GENDER - EF 1 ON ROOF OK | JERRYF | JERRYF | | HD | P | 6389791 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/31/2019 | STILL NEED ALL CABLE ACTUATED DAMPER CONTROLS AND FINAL DUCT CONNECTIONS AT ALL HARD LID AREAS - STILL NEED ROOF INSPECTION NOTES: ABOVE HARD LID SA / RA / EXHAUST MAINS AND RUN OUTS OK PER REVISED PLAN - HIGH LIGHTED IN GREEN ON ON-SITE PLANS DATED 10 / 31 / 19 | JERRYF | JERRYF | | HD | P | 6384792 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/28/2019 | CHANGED INSPECTION TO HD - ENGINEER LETTER FOR FIRE DAMPERS RECEIVED - NO INSPECTION TODAY | JERRYF | JERRYF | | HD | P | 6381632 |
MESA PLUMBING & HEATING INC. | HI | P | 10/23/2019 | UNABLE TO DO VISUAL OR PRESSURE TEST ON RELOCATED PIPING AT THIS TIME WORK IS NOT COMPLETE AT THIS TIME ( CONTRACTOR PROCEEDING AT OWN RISK ON PIPING AT THIS TIME) - AT FUTURE INSPECTION WILL NEED PRESSURE TEST AND VISUAL INSPECTION AND REVISED APPROVED REVISED PLAN SHOWING ROUTING AS INSTALLED | JERRYF | JERRYF | | HI | P | 6377638 |
COLORADO SHEET METAL CO., INC. | HSP | P | 10/23/2019 | HAD CONSULT WITH MECHANICAL CONTRACTOR ON FIRE DAMPERS BEING REMOVED FROM WALL - WILL NEED STAMPED APPROVED LETTER FROM ENGINEER ON DAMPERS STAYING IN PLACE OR BEING REMOVED | JERRYF | JERRYF | | HSP | P | 6377637 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/22/2019 | **Updated 10/23/19 by Bill S : contacted contractor by phone (Greg Daniels) on the fire dampers installed at corridor wall. Will need a plan slice showing the removal of the fire dampers or will need the dampers inspected as if it is a rated wall (framing, angles, break-away connections, etc) **ENGINEER TO ADDRESS 12" SUPPLY AIR COMING OFF OF THE 12"X12" DUCT INSTEAD OF THE 20"X12" AS DRAWN** NO ROOF INSPECTION TODAY. DUCTWORK AND RUN OUTS AT WOMENS AND ALL GENDER LOCKER ROOMS AND BATHROOMS INSTALLED PER PLAN (SEE ABOVE COMMENT). STILL NEED TO COMPLETE 10" SUPPLY AT "5" LINE. OK TO WRAP ALL INSPECTED DUCT | BILLS | BILLS | | HD | P | 6376380 |
MESA PLUMBING & HEATING INC. | P= | C | 01/28/2020 | See plumbing plan splice dated 1-22-2019. | DANR | DANR | | P= | C | 6465731 |
MESA PLUMBING & HEATING INC. | PTO | C | 01/28/2020 | See plumbing plan splice dated 1-22-2019. | DANR | DANR | | PTO | C | 6465728 |
MESA PLUMBING & HEATING INC. | P= | P | 12/26/2019 | waiting on plan splice, mens locker room ok | JOSEPHD | JOSEPHD | | P= | P | 6436569 |
MESA PLUMBING & HEATING INC. | P= | P | 12/19/2019 | Need inspection Men's locker area and recirc pump mechanical room, need plan splice on 1st floor piping for pool showers (can complete PTO when splice complete), rest ok. | DANR | DANR | | P= | P | 6431991 |
MESA PLUMBING & HEATING INC. | PTO | P | 11/19/2019 | Re-pipe of rinse showers: Need plans splice per piping to 1st floor, cannot combination waste and vent on shower drains. test ok on in wall and venting, need test on re-pipe under floor (flow test ok). Domestic water tie ins ok. Note: check recirc pump in mechanical room at final.
| DANR | DANR | | PTO | P | 6404439 |
MESA PLUMBING & HEATING INC. | PTO | P | 11/11/2019 | ok for dwv and water under floor columns 3-5, still need to see insulation, will need engineer letter for aav @ drain for showers in pool area, will need to conduct more research into indirect drain for pool area showers | JOSEPHD | JOSEPHD | | PTO | P | 6394475 |
MESA PLUMBING & HEATING INC. | PTO | P | 10/29/2019 | Inspection columns 5-9 DWV and domestic water (G.C. drawing P1.3 marked): Ok to insulate domestic water, rest ok for this area. Note: need inspection DWV under floor columns 3-5, and insulation inspection. Check VTR to air intake at final, discussed accessible elements.
| DANR | DANR | | PTO | P | 6382821 |
MESA PLUMBING & HEATING INC. | PTO | P | 10/28/2019 | In wall and overhead DWV and domestic water columns 3-5 (G.C. drawing P1.3 marked): Ok to insulate domestic water, need toilet flanges and under floor inspection, rest ok this area. Note: discussed accessible elements on transfer showers. | DANR | DANR | | PTO | P | 6381664 |
MESA PLUMBING & HEATING INC. | PTO | P | 10/24/2019 | Domestic water only as noted below need all domestic water tie ins at mains and nail protection: Under floor: men's and women's locker room and gang bathrooms ok to insulate. In wall: bathroom group and men's lavs ok to insulate. Note: discussed accessible elements. | DANR | DANR | | PTO | P | 6379048 |
MESA PLUMBING & HEATING INC. | XMS | P | 01/22/2020 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: new splice page reroute gas line | TCRIPPEN | TCRIPPEN | | XMS | P | 6459844 |
MESA PLUMBING & HEATING INC. | XPS | P | 01/22/2020 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 1/22/20: Delta 1 revisions P1.2 revised key note 13, plumbing lower level new work plan, and pool deck shower detail. | SHANEN | SHANEN | | XPS | P | 6459832 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 01/15/2020 | PAID (REC#1657356) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: New sheet A1.5 - expand work area to include storage removal in vestibule. | SHELLEY | SHELLEY | | XBS | T | 6453343 |
MESA PLUMBING & HEATING INC. | XMS | P | 10/24/2019 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | P | 6379695 |
STURGEON ELECTRIC CO INC | XES | P | 10/23/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power, lighting and schedules. | BERTHA | BERTHA | | XES | P | 6377634 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 10/17/2019 | PAID (REC#1639992) PLAN SPLICE FEE: $50 by: DANM for Construction: Remove 1-hr corridor rating due to fully sprinklered building | DANM | DANM | | XBS | T | 6371669 |