PALACE HOMES, INC. | B= | C | 09/17/2020 | Items corrected / See permit N07212 for retaining wall | TRENTP | TRENTP | | B= | C | 6710175 |
PALACE HOMES, INC. | BSP | P | 09/17/2020 | Photos of corrections from previous inspection on file | TRENTP | TRENTP | | BSP | P | 6708962 |
PALACE HOMES, INC. | B= | P | 09/10/2020 | Electrical has not signed off on AC / Retaining wall over 4 ft on north side of house not on plans / Gas fire place in master bedroom requires a CO detector to also be present in room / Need to complete missing stucco where lights were moved at rear / Need provide weather resistive exterior covering around front door / Finished basement, Rear deck, no stairs installed at time of inspection -- Schedule a new Building Final when above items are complete. | TRENTP | TRENTP | | B= | P | 6701700 |
PALACE HOMES, INC. | B= | P | 09/10/2020 | Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file / 3rd party insulation certificate on file -- Schedule a new Building Final when above items are complete. | JEREMYA | JEREMYA | | B= | P | 6700971 |
PALACE HOMES, INC. | BTR | C | 06/02/2020 | | MICHAELM | MICHAELM | | BTR | C | 6590717 |
PALACE HOMES, INC. | BFR | C | 04/21/2020 | | SCOTTS | SCOTTS | | BFR | C | 6545972 |
PALACE HOMES, INC. | BLA | C | 04/17/2020 | lath ok | SCOTTS | SCOTTS | | BLA | C | 6543851 |
PALACE HOMES, INC. | BIN | P | 04/17/2020 | complete BFR -- insulation at walls and vaulted ceilings ok/blown in at final for ceiling -- Reviewed Air Leakage Testing Requirements Per 2015 IECC Section R402.4.1.2 to be Provided by Final Inspection / | SCOTTS | SCOTTS | | BIN | P | 6543827 |
PALACE HOMES, INC. | BFR | P | 04/17/2020 | splice is not yet complete at time of visit -- by final/ Per 2015 IRC R308.4.5 Glazing less than 60" vertically from the standing or walking surface and less than 60" horizontally from waters edge shall be considered a hazardous location which requires safety glazing for upper Bath 1 left side of casement and fixed panel in Bath 2 | SCOTTS | SCOTTS | | BFR | P | 6543823 |
PALACE HOMES, INC. | BIN | P | 04/17/2020 | Builders statement for blown in on file -- FX certificate and test on file | SCOTTS | SCOTTS | | BIN | P | 6543401 |
PALACE HOMES, INC. | BFR | P | 04/07/2020 | provide plan splice as previously requested for roof at front door as well as framing changes front and back covers/window added on 2nd floor right elevation that is not on plan -- provide stamped copy of truss layout with hardware/viewed shop drawing on site -- ok to insulate | SCOTTS | SCOTTS | | BFR | P | 6534033 |
PALACE HOMES, INC. | BSP | P | 04/07/2020 | E2 and L3 truss repairs on file | SCOTTS | SCOTTS | | BSP | P | 6533011 |
PALACE HOMES, INC. | BSP | R | 03/16/2020 | Front porch and rear deck cover - Unable to see framing or connections due to installation of T&G ceilings; Missing all CBT4Z post caps; Missing 2 CS20 straps at front porch ridge beam to post and post to header; Missing 2 CS20 straps at rear deck cover ridge beam post to header / Lower roof over front entry not found on plans - need to splice plan change. | CHUCK | CHUCK | | BSP | R | 6511743 |
PALACE HOMES, INC. | BSP | P | 03/09/2020 | Front and rear post bases per plan | CHAD | CHAD | | BSP | P | 6505013 |
PALACE HOMES, INC. | BFD | C | 10/15/2019 | remainder of drain and damp proofing installed | SCOTTS | SCOTTS | | BFD | C | 6369093 |
PALACE HOMES, INC. | BFD | P | 09/27/2019 | Partial drain inspection - Drain at front elevation installed at habitable space - stops at garage common wall and sides - Damp proof at same locations OK -- Still need to inspect drain and damp proof components at remaining habitable locations | JUSTINL | JUSTINL | | BFD | P | 6351321 |
PALACE HOMES, INC. | BFN | C | 09/27/2019 | Engineer letter for foundation on file -- Eufer noted / Foundation design apart of plan set (Bearing Capacity Verified) | DAKOTAB | DAKOTAB | | BFN | C | 6349947 |
PALACE HOMES, INC. | BFT | C | 09/27/2019 | Engineer letter for footing on file -- Open hole on file -- 3000 PSF - Drain usable - 10% | DAKOTAB | DAKOTAB | | BFT | C | 6349945 |
ROWAN ELECTRIC LLC | E= | C | 09/17/2020 | E= OK ------- | GREGM | GREGM | | E= | C | 6709234 |
ROWAN ELECTRIC LLC | E= | P | 09/16/2020 | WIRE FOR GATE NEEDS TO BE IN A J-BOX ----- A/C #1 30 AMP --- A/C #2 50 AMP ---- | GREGM | GREGM | | E= | P | 6708383 |
ROWAN ELECTRIC LLC | E= | T | 08/31/2020 | PAID (REC#1713307): E= OK -------status changed by Matt S for a/c install | GREGM | GREGM | | E= | T | 6691114 |
ROWAN ELECTRIC LLC | E= | R | 08/20/2020 | INLAND SINK OUTLET NOT INSTALLED ( NEEDS TO BE ACCESSIBLE ) SWITCH HANGING OUT OF WALL BATH SOUTH SIDE MAIN LEVEL ----- REST OK --- 2- A/C PRE-WIRE ---- | GREGM | GREGM | | E= | R | 6679972 |
ROWAN ELECTRIC LLC | ER+ | C | 06/23/2020 | EUG FOR GATE OK --- 2- 10/2 UF ---- | GREGM | GREGM | | ER+ | C | 6615085 |
ROWAN ELECTRIC LLC | ES | C | 04/06/2020 | Residential Underground: 2 - 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 6532814 |
ROWAN ELECTRIC LLC | ER | C | 04/06/2020 | 1 - #2 AL , 6 - #6 AL , 4 - #10 , irreversible ufer , no mcc , no central vac , finished basement , 100 amp sub-panel | TOMC | TOMC | | ER | C | 6532813 |
ROWAN ELECTRIC LLC | EUG | C | 01/03/2020 | EUG OK -------2-250 MCM ------ | GREGM | GREGM | | EUG | C | 6442648 |
ROWAN ELECTRIC LLC | ESL | C | 10/23/2019 | ESL OK ---- | GREGM | GREGM | | ESL | C | 6377207 |
ROWAN ELECTRIC LLC | ESL | R | 10/22/2019 | NEED POC ON SITE OR NUMBER ------ | GREGM | GREGM | | ESL | R | 6376871 |
AIR CONCEPTS HEATING & COOLING | H= | C | 09/09/2020 | REVISED EQUIPMENT CERTIFICATE HAS BEEN RECEIVED BY PLAN REVIEW AND HAS NOT BEEN SCANNED YET. | ROBERTC | ROBERTC | | H= | C | 6700801 |
AIR CONCEPTS HEATING & COOLING | H= | P | 09/09/2020 | RECEIVED PICTURES OF FIREPLACE MANTLE CLEARANCES. STILL NEED RBD STAMPED EQUIPMENT CERTIFICATE FOR BOILER. | ROBERTC | ROBERTC | | H= | P | 6699825 |
AIR CONCEPTS HEATING & COOLING | H= | P | 09/04/2020 | PROVIDE FIREPLACE INSTALLATION INSTRUCTIONS FOR GREAT ROOM FIREPLACE TO VERIFY MANTLE CLEARANCES. PROVIDE RBD STAMPED EQUIPMENT CERTIFICATE FOR BOILER. FUTURE INSTALLATION OF GARAGE HEATERS MUST MEET ENERGY CODE REQUIREMENTS. | ROBERTC | ROBERTC | | H= | P | 6697186 |
AIR CONCEPTS HEATING & COOLING | H= | P | 09/04/2020 | RECEIVED DUCT LEAKAGE REPORT AND EQUIPMENT CERTIFICATE. EQUIPMENT CERTIFICATE IS NOT STAMPED MUST BE SUBMITTED TO RBD FOR PLAN REVIEW. | ROBERTC | ROBERTC | | H= | P | 6696960 |
AIR CONCEPTS HEATING & COOLING | H= | P | 08/31/2020 | PROVIDE REVISED EQUIPMENT CERTIFICATE FOR THE BOILER. PROVIDE DUCT LEAKAGE REPORT. NEED REVISED APPROVED PLAN SHOWING THE HEATED GARAGE. ARE YOU INSTALLING BOTH GARAGE HEATERS? IF GARAGE HEATERS ARE FUTURE NEED TO CAP BOTH VENTS. UNABLE TO SEE SHUTOFF ON ONE GARAGE HEATER. LABEL GAS RISER AT HOUSE WITH MEDIUM PRESSURE LABEL. PROVIDE INSTALLATION INSTRUCTIONS FOR LIVING ROOM FIREPLACE TO VERIFY MANTLE CLEARANCES. GAS SHUT OFF TO RANGE IS LOCATED WHERE? NEED LADDER TO SEE MAKEUP AIR FOR KITCHEN HOOD. UNABLE TO ACCESS FILTER AT UPSTAIRS FAN COIL UNIT DUE TO HUMIDIFIER DRAIN TUBE. PROTECT A/C SECONDARY ON UPPER UNIT. WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN LAUNDRY ROOM / WHOLE HOUSE VENTILATION SWITCH LOCATED IN LAUNDRY ROOM / NOTE / FINISHED BASEMENT / DIRECT VENT BOILER / 2 A/C COMPLETE TWO FAN COIL UNITS / | ROBERTC | ROBERTC | | H= | P | 6691787 |
AIR CONCEPTS HEATING & COOLING | HC | C | 03/30/2020 | RELEASE METER | GREGV | GREGV | | HC | C | 6525582 |
AIR CONCEPTS HEATING & COOLING | HRR | C | 03/30/2020 | CORRECTIONS MADE. PER CONTRACTOR, NO ERVS ARE BEING INSTALLED. NEED REVISED EQUIPMENT SCHEDULE, BOILER WITH IN FLOOR RADIANT HEAT. REMOVE DUCT DESIGN. BY FINAL NEED DUCT LEAKAGE REPORT AND WILL NEED ACCESS TO SEE KITCHEN MAKE UP AIR AND CONNECTION TO KITCHEN HOOD. WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN LAUNDRY ROOM / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL / NOTE / FINISHED BASEMENT /BOILER WITH IN FLOOR RADIANT HEAT / AIR HANDLER UPPER LEVEL A/C ONLY / AIR HANDLER IN BASEMENT A/C ONLY / A/C ROUGH, COIL AND LINE SET X 2 / | GREGV | GREGV | | HRR | C | 6525578 |
AIR CONCEPTS HEATING & COOLING | HRR | P | 03/27/2020 | NEED REVISED EQUIPMENT SCHEDULE, BOILER WITH IN FLOOR RADIANT HEAT. REMOVE DUCT DESIGN. BY FINAL NEED DUCT LEAKAGE REPORT AND WILL NEED ACCESS TO SEE KITCHEN MAKE UP AIR AND CONNECTION TO KITCHEN HOOD. PER CONVERSATION WITH BUILDER, 3 ERVS WERE DISCUSSED, ARE THEY STILL BEING INSTALLED? LOWER B VENT IN GARAGE DOWN TO FRAMING, REMOVE ROOFING MATERIALS ARE TOUCHING B VENT AT GARAGE HEATER, INSTALL HEAT SHIELDS TO BOTH GARAGE HEATER VENTING, PROPERLY SUPPORT ALL EXHAUST FAN FLEX THROUGH OUT HOUSE, CAN NOT USE ELECTRICAL WIRE AS SUPPORT. WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN LAUNDRY ROOM / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL / NOTE / FINISHED BASEMENT /BOILER WITH IN FLOOR RADIANT HEAT / AIR HANDLER UPPER LEVEL A/C ONLY / AIR HANDLER IN BASEMENT A/C ONLY / A/C ROUGH, COIL AND LINE SET X 2 / | GREGV | GREGV | | HRR | P | 6523656 |
JOLLY PLUMBING & HEATING INC. | HWP | C | 03/23/2020 | 70 LB TEST OK ON MANIFOLD | GREGV | GREGV | | HWP | C | 6518666 |
SPRINGS GAS, INC. | HI | C | 03/17/2020 | BY FINAL INSTALL ALL PRESSURE REGULATORS IN MECHANICAL ROOM. PER CONTRACTOR GAS STUBS ON DECK ARE FUTURE FIREPITS AT 80K EACH, STUB UNDER DECK IS FOR FUTURE BBQ AT 50K. UNDERGROUND IS FOR A FUTURE FIREPLACE AT 50K. GARAGE HEATER AND FUTURE GARAGE HEATER BOTH SIZED AT 60K EACH. 10 LB TEST OK/ 1 1/4 INCH MEDIUM PRESSURE MAIN LINE TO MECHANICAL ROOM/ 1 BOILER/ THREE FIREPLACES/ 1 RANGE/ 1 DRYER/ 1 GARAGE HEATER/ 1 FUTURE OUTDOOR FIREPLACE/ 1 FUTURE BBQ (BELOW DECK)/ 2 FUTURE FIREPITS (ON DECK)/ 1 FUTURE GARAGE HEATER/ | NANCY | NANCY | | HI | C | 6512783 |
SPRINGS GAS, INC. | HSP | P | 03/16/2020 | PER CONVERSATION WITH GENERAL CONTRACTOR WILL BE GETTING A SPLICE FOR THE GARAGE HEATERS, 1 INSTALLED NOW, 1 IS FUTURE. MECHANICAL CONTRACTOR IS INSTALLING AN AIR HANDLER IN UPPER LEVEL CLOSET, AIR HANDLER IS FOR COOLING AND HUMIDIFICATION ONLY. WILL NEED DUCT LEAKAGE REPORT FOR ALL DUCTS IN ATTIC. RANGE HOOD EXHAUST BEING INSTALLED, TEMPERED MAKE-UP AIR ALSO BEING INSTALLED. TWO ERV'S BEING INSTALLED. | GREGV | GREGV | | HSP | P | 6511981 |
SPRINGS GAS, INC. | HI | P | 03/16/2020 | PROVIDE BTU'S OF FIREPIT AND THE THREE UNKNOWN GAS LINES ABOVE AND UNDER DECK. 10 LB TEST OK. 45 FEET OF 1 1/4 INCH MEDIUM PRESSURE GAS LINE FROM METER TO 4 REGULATORS IN MECHANICAL ROOM. 50 FEET 1 1/4 INCH TO 2 FIREPLACES, 1 FIREPIT AND 1 UNKNOWN ON DECK. 60 FEET OF 1 1/4 INCH TO 1 FIREPLACE, 1 UNKNOWN ON DECK AND 1 UNKNOWN STUB UNDER DECK, 1 RANGE AND 1 DRYER. 110 FEET OF 1 INCH TO GARAGE HEATER AND 1 FUTURE GARAGE HEATER. | GREGV | GREGV | | HI | P | 6511980 |
JOLLY PLUMBING & HEATING INC. | HV+ | C | 03/16/2020 | THE BOILER VENT IS INSPECTED UNDER THE MECHANICAL HRR INSPECTION. BOILER VENTS ARE NOT INSPECTED UNDER A HV OR HV+ INSPECTION. COMPLETED HV+ INSPECTION TODAY BUT FOLLOWING CORRECTION STILL NEEDS TO BE MADE TO BOILER VENT. NEED 1 INCH CLEARANCE FROM BOILER VENT PIPES TO SIDE OF FIREPLACE CABINET. MAKE CORRECTION BEFORE MECHANICAL CONTRACTOR CALLS IN HRR INSPECTION. QUESTIONS? PLEASE CONTACT ME. | GREGV | GREGV | | HV+ | C | 6511979 |
JOLLY PLUMBING & HEATING INC. | HV+ | P | 03/13/2020 | NEED BOILER INSTALLATION INSTRUCTIONS ON-SITE TO VERIFY BOILER VENTING, SUPPORT, MATERIALS, LENGTH, ETC. | GREGV | GREGV | | HV+ | P | 6510277 |
JOLLY PLUMBING & HEATING INC. | HWP | P | 03/10/2020 | All zones holding at 70 lbs. ok to cover. | MARK | MARK | | HWP | P | 6506334 |
JOLLY PLUMBING & HEATING INC. | HWP | P | 03/09/2020 | ZONE 3 -LOW PRESSURE ZONE 5 -LOW PRESSURE ZONE 6 -65 LB TEST OK ZONE 7 - LOW PRESSURE ZONE 8- LOW PRESSURE ZONE 10- LOW PRESSURE ZONE- 11 LOW PRESSURE ZONE 12 - 65 LB TEST OK
| ANDREWP | ANDREWP | | HWP | P | 6504559 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 03/09/2020 | CORRECTION MADE, SEE IMAGES / | MATTM | MATTM | | HV | C | 6503718 |
JOLLY PLUMBING & HEATING INC. | HWP | P | 02/27/2020 | 70 LB TEST OK FOR 2 ZONES STAPLE UP RADIANT TUBING ON UPPER LEVEL. OK TO COVER. STILL NEED TO SEE REMAINING RADIANT TUBING THROUGHOUT HOUSE. | GREGV | GREGV | | HWP | P | 6494668 |
JOLLY PLUMBING & HEATING INC. | HWP | P | 02/26/2020 | FIELD CANCELLED NOT READY. | GREGV | GREGV | | HWP | P | 6493456 |
WESTERN FIREPLACE SUPPLY, INC. | HV | R | 02/13/2020 | TRIP FEE WAIVED / INSULATION SHIELD STILL LACKS CLEARANCE TO FIREPLACE VENT / CONTRACTOR TO ATTACH PICTURE OF CORRECTION TO NEXT INSPECTION INSPECTION REQUEST | MATTM | MATTM | | HV | R | 6481567 |
WESTERN FIREPLACE SUPPLY, INC. | HV | P | 01/10/2020 | Upper level vent clearance not met. See rectangular shield at framing and vent to shield clearance. | MARK | MARK | | HV | P | 6449843 |
WESTERN FIREPLACE SUPPLY, INC. | HV | P | 01/03/2020 | MAIN LEVEL FIREPLACE IN GREAT ROOM THAT VENTS THROUGH THE ROOF, FRAMING AROUND VENTING ON SECOND FLOOR LACKS CLEARANCE TO COMBUSTIBLES. SMALLER MAIN LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK. NOTE: MANUFACTURER NON-COM INSTALLED ON BOTH FIREPLACES. | GREGV | GREGV | | HV | P | 6442429 |
SPRINGS GAS, INC. | HO | C | 12/31/2019 | 10LB TEST GOOD, 290' OF 2" POLY WITH TRACER WIRE. | CHADP | CHADP | | HO | C | 6440719 |
WESTERN FIREPLACE SUPPLY, INC. | HV | P | 12/13/2019 | MAIN LEVEL FIREPLACE IN GREAT ROOM THAT VENTS THROUGH THE ROOF, NEEDS FRAMING AROUND VENTING ON SECOND FLOOR TO VERIFY VENT CLEARANCE TO COMBUSTIBLES. SMALLER MAIN LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK. NOTE: MANUFACTURER NON-COM INSTALLED ON BOTH FIREPLACES. | GREGV | GREGV | | HV | P | 6427235 |
JOLLY PLUMBING & HEATING INC. | P= | C | 09/08/2020 | Potable Water Cert attached | MALYNDA | MALYNDA | | P= | C | 6698388 |
JOLLY PLUMBING & HEATING INC. | P= | P | 09/04/2020 | Need potable water certificate, rest ok Note: at PTO, inspector was advised basement was not being finished, it has since been finished with 2 full bathrooms, bar sink is rough in only, irrigation has also since been installed and a pvb is on the outside of the house | MALYNDA | MALYNDA | | P= | P | 6697015 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 01/24/2020 | Note: aav at upstairs lav across from stairs, aav's at both kitchen sinks, tempering at right master lav, no irrigation, check water heater connections at final *Basement has been framed, but is not being finished at this time. All basement lavs are vtr and the water lines are ran to all fixtures, aav at bar sink. | MALYNDA | MALYNDA | | PTO | C | 6463236 |
JOLLY PLUMBING & HEATING INC. | PWO | C | 12/27/2019 | Need Certificate of potable water by final. | SAMH | SAMH | | PWO | C | 6438300 |
JOLLY PLUMBING & HEATING INC. | PWO | P | 12/20/2019 | Will still need to see water line running from East side of driveway, underneath the driveway and into the house. No need to test coupling connection. Okay to backfill water line from East side of driveway to existing well. Note: will need potable water certificate by final | MALYNDA | MALYNDA | | PWO | P | 6434171 |
JOLLY PLUMBING & HEATING INC. | PB | C | 10/18/2019 | Note: will need PWO and potable water certificate, no water line at this time. | MALYNDA | MALYNDA | | PB | C | 6373136 |
JOLLY PLUMBING & HEATING INC. | PB | R | 10/17/2019 | Not Ready | MALYNDA | MALYNDA | | PB | R | 6371687 |
MORNING STAR ELEVATOR, LLC. | V= | C | 08/25/2020 | ELEVATOR COMPLETE | ERIC | ERIC | | V= | C | 6685116 |
PALACE HOMES, INC. | XMS | T | 09/08/2020 | PAID (REC#1710827): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised equipment certificate to show hydronic boiler as heat system. - Provide heat sources to all habitable locations | JUSTINC | JUSTINC | | XMS | T | 6698464 |
PALACE HOMES, INC. | XBS | T | 04/20/2020 | PAID (REC#1674907): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: ADD PORCH - WINDOWS | MICHAELA | MICHAELA | | XBS | T | 6545444 |