MPB CONTRACTORS, INC. | B= | C | 03/02/2022 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 7286754 |
MPB CONTRACTORS, INC. | B= | P | 03/23/2021 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | BERTW | BERTW | | B= | P | 6907558 |
MPB CONTRACTORS, INC. | B= | P | 11/01/2019 | Building final OK pending mechanical complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6385901 |
MPB CONTRACTORS, INC. | BSP | P | 10/03/2019 | Screw inspection for rated wall other than IBC reasons OK | NICK | NICK | | BSP | P | 6356465 |
MPB CONTRACTORS, INC. | BFR | P | 09/25/2019 | All new framing OK per approved design / Reviewed accessible elements / Need to attach mechanical / Need electrical and mechanical complete | NICK | NICK | | BFR | P | 6347878 |
DILLER ELECTRIC LLC | E= | C | 11/01/2019 | | GARYL | GARYL | | E= | C | 6385554 |
DILLER ELECTRIC LLC | EP | P | 10/25/2019 | new sub panel, transformer--okay, rtu is 20 amp breaker NOTE!!! main breaker not installed in sub panel, check on final | GARYL | GARYL | | EP | P | 6380561 |
DILLER ELECTRIC LLC | EP | P | 10/24/2019 | All ceilings, note! Marcos to open up two new panels,transformer at final | GARYL | GARYL | | EP | P | 6379156 |
DILLER ELECTRIC LLC | ER | P | 09/25/2019 | 4-recept's/2-gang on north wall, 2-switches NOTE! lots of low voltage on grid | GARYL | GARYL | | ER | P | 6347965 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 11/01/2019 | GAS PIPING OK | JERRYF | JERRYF | | H= | C | 6386144 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 11/01/2019 | RTU INSTRUCTION MANUAL RECEIVED | JERRYF | JERRYF | | H= | P | 6385334 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 10/31/2019 | PARTIAL PENDING THE FOLLOWING - NEED GAS CONTRACTOR ATTACHED TO PERMIT AND INSPECTIONS CALLED - TAB REPORT - ADD NEW VENT AT RELOCATED UNIT HEATER TO PERMIT WORK SCOPE - ROOF INSPECTION / NO ACCESS AT THIS TIME - COULD LOCATE CARBON DIOXIDE SENSOR CALLED FOR ON RTU SCHEDULE - NEED INSTALL MANUAL FOR RTU TO VERIFY CONDENSATE DRAIN AND SECONDARY DRAIN PROTECTION NOTES: ALL SA / RA GRILLES AND CONTROLS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6385024 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 10/31/2019 | TAB REPORT RECIEVED | JERRYF | JERRYF | | H= | P | 6384286 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 10/03/2019 | ABOVE CEILING SA / MAINS AND RUN OUTS OK - BY FINAL CAP ABANDONED B VENT IN BACK AREA | JERRYF | JERRYF | | HD | P | 6357361 |
DILLER ELECTRIC LLC | XES | T | 10/22/2019 | PAID (REC#1639303) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised panel/circuit numbers, added panel L2. | BERTHA | BERTHA | | XES | T | 6376663 |