ELDER CONSTRUCTION, INC. | B= | C | 06/25/2020 | | BOBF | BOBF | | B= | C | 6617196 |
ELDER CONSTRUCTION, INC. | BFR | P | 06/05/2020 | pending completion of other required inspections, soffit framing in lower tunnel okay | BOBF | BOBF | | BFR | P | 6595574 |
ELDER CONSTRUCTION, INC. | B= | P | 05/28/2020 | West side of lower tunnel final pending completed required inspections . East side frame and final needed next. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), DYNALECTRIC COMPANY Electrical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6585516 |
ELDER CONSTRUCTION, INC. | B= | P | 04/22/2020 | upper level mens rest room okay, still need to complete lower level tunnel to exit -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), DYNALECTRIC COMPANY Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6547941 |
ELDER CONSTRUCTION, INC. | B= | P | 04/10/2020 | inspection was for phase 2 - east baggage area okay / upper level womens rest room okay / grab bar behind upper mens accessible toilet to be 24" to the open side, measures 22 1/2" -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), DYNALECTRIC COMPANY Electrical Final Inspection is not Completed yet, RK MECHANICAL, INC Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6537837 |
ELDER CONSTRUCTION, INC. | BFR | P | 03/27/2020 | new soffit framing on west side of tunnel per splice okay | BOBF | BOBF | | BFR | P | 6524076 |
ELDER CONSTRUCTION, INC. | BFR | P | 03/09/2020 | pending other required inspections, upper level rest rooms okay | BOBF | BOBF | | BFR | P | 6504636 |
ELDER CONSTRUCTION, INC. | BSP | P | 02/14/2020 | pending completion of other required inspections - framing for soffits on southwest side of east wing and drop ceiling on northeast corner of east wing okay | BOBF | BOBF | | BSP | P | 6482547 |
ELDER CONSTRUCTION, INC. | B= | P | 02/12/2020 | lower level restrooms okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), DYNALECTRIC COMPANY Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, RK MECHANICAL, INC Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6480028 |
ELDER CONSTRUCTION, INC. | B= | P | 01/29/2020 | pending other required inspections - areas 1,2 and 3 of lower level except rest rooms okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), DYNALECTRIC COMPANY Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, RK MECHANICAL, INC Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6467686 |
ELDER CONSTRUCTION, INC. | BFR | P | 11/08/2019 | pending other required inspections, framing for both reat rooms and all drop ceilings on west 1/2 okay / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 6393408 |
DYNALECTRIC COMPANY | E= | C | 06/18/2020 | Above ceiling and east side of main corridor / tunnel ok / | LOGANP | LOGANP | | E= | C | 6609173 |
DYNALECTRIC COMPANY | ER | P | 05/07/2020 | above ceiling for half ceiling in main corridor only ok | CRAIG | CRAIG | | ER | P | 6564141 |
DYNALECTRIC COMPANY | E= | P | 04/09/2020 | east side, baggage claim ok | CRAIG | CRAIG | | E= | P | 6536758 |
DYNALECTRIC COMPANY | E= | P | 03/19/2020 | above ceiling and soffit on east side ok | CRAIG | CRAIG | | E= | P | 6516315 |
DYNALECTRIC COMPANY | ER | P | 02/27/2020 | 6 can lights rough in on ground level, and rough in for walls and ceilings of upper floor restrooms nearest top of escalator okay. | CHIPO | CHIPO | | ER | P | 6494279 |
DYNALECTRIC COMPANY | ER | P | 02/25/2020 | 2 - 3/4" pvc for power / data to 2 smart carts areas ok 3 - 1 1/4" pvc for data / power / spare to behind counter area in 5 spots ok | CRAIG | CRAIG | | ER | P | 6491511 |
DYNALECTRIC COMPANY | ER | P | 02/21/2020 | large soffit ok----NEED TO ADD 1 MORE ACCESS PANEL FOR A TOTAL OF 6 PANELS CHECK ON FINAL--- | TIMA | TIMA | | ER | P | 6488662 |
DYNALECTRIC COMPANY | ER | P | 02/19/2020 | lobby soffit on east side for 4 can lights only | CRAIG | CRAIG | | ER | P | 6485729 |
DYNALECTRIC COMPANY | E= | P | 01/27/2020 | west side of 1st floor / still need rental desk installed ,wall signs, and tv monitors over the luggage belts / rest ok | BRIAN | BRIAN | | E= | P | 6465267 |
DYNALECTRIC COMPANY | ER | P | 01/08/2020 | above ceiling behind counters ok | CRAIG | CRAIG | | ER | P | 6446560 |
DYNALECTRIC COMPANY | ER | P | 12/23/2019 | above ceiling ok | CRAIG | CRAIG | | ER | P | 6435011 |
DYNALECTRIC COMPANY | ER | P | 12/09/2019 | access to j box in hard lid ceiling ok | CRAIG | CRAIG | | ER | P | 6420752 |
DYNALECTRIC COMPANY | ER | P | 12/04/2019 | all floor boxes ok on first floor west side -------------------- NOTE access to j box in hard lid ok | CRAIG | CRAIG | | ER | P | 6416323 |
DYNALECTRIC COMPANY | ER | P | 11/15/2019 | NOTE --- can not have cords or outlets above the hard lid at the 1st floor stairway in lobby / need access door at the south side of column at bottom of stair way /------ rest of 1st floor lobby hard lid ok / | BRIAN | BRIAN | | ER | P | 6400907 |
DYNALECTRIC COMPANY | ER | P | 11/11/2019 | hard lid and bathroom walls / 2 hard lid soffits in open area / see plans | BRIAN | BRIAN | | ER | P | 6395166 |
HVAC SOLUTIONS, INC. | H= | C | 04/02/2020 | Mechanical final ok. Test and balance report received, see images. / | MARKB | MARKB | | H= | C | 6529193 |
HVAC SOLUTIONS, INC. | H= | P | 03/16/2020 | MECHANICAL FINAL OK FOR AREAS A,B,C,D,E, PENDING TAB REPORT | BENH | BENH | | H= | P | 6511289 |
HVAC SOLUTIONS, INC. | HD | P | 02/19/2020 | AREA D AND E ABOVE CEILING LATERALS OK TO WRAP, BY FINAL WILL NEED ACCESS DOORS FOR VAV- 208 AND 209 SINCE CEILING IS HARD LID | BENH | BENH | | HD | P | 6485677 |
HVAC SOLUTIONS, INC. | HD | P | 01/21/2020 | PARTIAL FINAL - AREAS A, B & C UP TO ESCALATORS COMPLETE. ABOVE CEILING DUCT - DIFFUSERS COMPLETE IN MENS AND WOMANS BATHROOMS. | MARKB | MARKB | | HD | P | 6458434 |
HVAC SOLUTIONS, INC. | HSP | P | 01/21/2020 | PARTIAL TEST AND BALANCE RECEIVED FOR AREA'S "A", "B" & PARTIAL "C" | MARKB | MARKB | | HSP | P | 6457648 |
HVAC SOLUTIONS, INC. | H= | P | 01/10/2020 | PARTIAL FINAL ONLY FOR SECTIONS A, B & PART OF C UP TO BATHROOMS - FLEX AND DIFFUSERS COMPLETE EXCEPT: Still need diffusers installed in bathrooms and provide test and balance report. Still need rough inspections on rest of C, D & E. | MARKB | MARKB | | H= | P | 6449497 |
HVAC SOLUTIONS, INC. | HSP | P | 12/20/2019 | SEE IMAGES FOR ENGINEER RESPONSE FOR RETURN AIR. | MARKB | MARKB | | HSP | P | 6433325 |
HVAC SOLUTIONS, INC. | HD | P | 12/19/2019 | WHAT IS BEING DONE FOR RETURN AIR IN THESE AREA'S NOTES: ALL SA GRILLES AND FINAL CONNECTIONS OK ON ALL LINEAR SLOT DIFFUSERS FROM GRID LINES 11 THROUGH 14 AND E THROUGH M - NO HARD LID AREA'S OR RESTROOMS AT THIS INSPECTION | JERRYF | JERRYF | | HD | P | 6432586 |
HVAC SOLUTIONS, INC. | HD | P | 11/12/2019 | LATERALS ABOVE CEILING OK TO WRAP IN SECTION A,B,C AND DUCT ABOVE HARD LID IN BATHROOMS OK | BENH | BENH | | HD | P | 6395897 |
RK MECHANICAL, LLC | P= | C | 04/17/2020 | | JOHNS | JOHNS | | P= | C | 6543639 |
RK MECHANICAL, LLC | P= | P | 04/08/2020 | lacking side clearance @ 2 womens and 1 mens stall, rest ok. NOTE: pre existing floor drains | JOHNS | JOHNS | | P= | P | 6534824 |
RK MECHANICAL, LLC | PTO | C | 03/09/2020 | main public restrooms upper level ok | TED | TED | | PTO | C | 6503946 |
RK MECHANICAL, LLC | P= | P | 02/12/2020 | lower level bathrooms ok | TED | TED | | P= | P | 6479899 |
RK MECHANICAL, LLC | PTO | P | 11/13/2019 | men's and women's public rest rooms lower level ok | TED | TED | | PTO | P | 6397332 |
ELDER CONSTRUCTION, INC. | XBS | T | 03/23/2020 | PAID (REC#1669640): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Add tunnel to scope. | BPHILLIPS | BPHILLIPS | | XBS | T | 6518339 |
HVAC SOLUTIONS, INC. | XMS | P | 03/23/2020 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: okay new splice | TCRIPPEN | TCRIPPEN | | XMS | P | 6517797 |
DYNALECTRIC COMPANY | XES | T | 03/21/2020 | PAID (REC#1672690): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add lower tunnel to scope | SHELBY | SHELBY | | XES | T | 6517690 |