GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 05/01/2020 | All other required Final inspections are complete. (This is a computer generated result) | DAKOTAB | DAKOTAB | | B= | C | 6558895 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/20/2020 | Building final OK pending other finals. Additional Inspections Required (computer generated): ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6517115 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/20/2020 | See Permit #M34809 for all frame and above lid inspections dated prior to change in phase 2 | DAKOTAB | DAKOTAB | | BFR | P | 6517112 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/17/2020 | Contractor to provide list of inspection for this phase inspected and entered on wrong permit | DAKOTAB | DAKOTAB | | BSP | P | 6513082 |
ENCORE ELECTRIC, INC. | E= | C | 05/01/2020 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6558894 |
ENCORE ELECTRIC, INC. | E= | C | 05/01/2020 | | RANDY | RANDY | | E= | C | 6558892 |
ENCORE ELECTRIC, INC. | E= | C | 03/23/2020 | panel UPS2LF1 ok | RANDY | RANDY | | E= | C | 6518896 |
ENCORE ELECTRIC, INC. | E= | P | 03/20/2020 | still need to check breakers in panel UPS2LF1----electrically ok to move in | RANDY | RANDY | | E= | P | 6517248 |
ENCORE ELECTRIC, INC. | E= | P | 03/19/2020 | OR 16 and 17----surrounding rooms as well all marked on plans | RANDY | RANDY | | E= | P | 6516194 |
ENCORE ELECTRIC, INC. | E= | P | 03/17/2020 | OR's 14 and 15 + equipment rooms---marked on plans | RANDY | RANDY | | E= | P | 6513732 |
ENCORE ELECTRIC, INC. | ER | P | 03/10/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6506096 |
ENCORE ELECTRIC, INC. | ER | P | 03/10/2020 | OR 14 and 15 equipment rm ceilings | RANDY | RANDY | | ER | P | 6506095 |
ENCORE ELECTRIC, INC. | ER | P | 03/05/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6502051 |
ENCORE ELECTRIC, INC. | ER | P | 03/05/2020 | OR ceilings 14-17 and corridors | RANDY | RANDY | | ER | P | 6502030 |
ENCORE ELECTRIC, INC. | ER | P | 02/18/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6485135 |
ENCORE ELECTRIC, INC. | ER | P | 02/18/2020 | OR ceilings phase 2---marked on plans | RANDY | RANDY | | ER | P | 6485134 |
ENCORE ELECTRIC, INC. | ER | P | 11/21/2019 | walls area 123a rooms 2611,2611,2621---area 123b room 2623 | RANDY | RANDY | | ER | P | 6407856 |
ENCORE ELECTRIC, INC. | ER | P | 11/11/2019 | walls in corridor 2577 marked on plans | RANDY | RANDY | | ER | P | 6395510 |
ENCORE ELECTRIC, INC. | ER | P | 10/30/2019 | OR 17 walls | RANDY | RANDY | | ER | P | 6383788 |
ENCORE ELECTRIC, INC. | ER | P | 10/29/2019 | OR 16 hard lid | RANDY | RANDY | | ER | P | 6383004 |
ENCORE ELECTRIC, INC. | ER | P | 10/15/2019 | OR 15 ceilings | RANDY | RANDY | | ER | P | 6369079 |
ENCORE ELECTRIC, INC. | ER | P | 10/11/2019 | equipment rooms 14-17 marked on plans | RANDY | RANDY | | ER | P | 6366375 |
ENCORE ELECTRIC, INC. | ER | P | 10/10/2019 | OR 14 and 15 | RANDY | RANDY | | ER | P | 6365024 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 04/06/2020 | PHASE -2 - MECHANICAL HEAT FINAL COMPLETE / ENGINEER STAMPED TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6531603 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 03/06/2020 | PHASE-2 - HYDRONIC HEAT FINAL COMPLETE. | LIDO | LIDO | | H= | C | 6502244 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 03/05/2020 | PHASE -2 - PARTIAL HEAT FINAL PENDING - NEED TEST AND BALANCE REPORT | LIDO | LIDO | | H= | P | 6501749 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 01/16/2020 | 2ND FLOOR MP123 ( BDA 150) : ALL HYDRONIC SPLICES ARE SPLICED INTO PLANS / LOW PRESSURE STEAM BEHIND SHAFT # 2100 UNDER OPERATING PRESSURE OK, NO VISIBLE LEAKS , OK TO WRAP. | LIDO | LIDO | | HWP | C | 6455585 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/08/2020 | 2ND FLOOR MH-123 ( BDA 139 ) ALL ABOVE CEILING EQUIPMENT AND ALL DUCT ROUGH OK. ((ALL MECHANICAL SPLICES ARE SCANNED INTO PERMIT PLANS.)) | LIDO | LIDO | | HD | P | 6446436 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/06/2020 | 2ND FLOOR MH-123 ( BDA 143) : OR #6 PARTIAL HEAT FINAL OK. ( FIRE DAMPER REMOVED SPLICE COMPLETED FOR ROOM # 2606 REFER TO NOTES DATED 12/10/19. NORTH WEST AREA - PARTIAL DUCT ROUGH OK ( HIGHLIGHTED IN YELLOW.) | LIDO | LIDO | | HD | P | 6444621 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 01/06/2020 | 2ND FLOOR SPLICE PAGE DATED 12/23/19 MP123 : VAV2-106/ EXISTING HUMIDIFIER - LOW PRESSURE STEAM, LOW PRESSURE CONDENSATE, HEAT WATER SUPPLY AND RETURN UNDER OPERATING PRESSURE NO VISIBLE LEAKS / INSTALLED PER PLAN / OK TO WRAP AND LABEL. | LIDO | LIDO | | H= | P | 6444620 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/23/2019 | 2ND FLOOR MH-123 ( BDA 143 ) OR - 6 SPLICED INTO PHASE-2 / 12/19/19 . CORRIDOR 2294 SUPPLY AND RETURN AIR DUCT ROUGH OK / OK TO WRAP / STILL NEED FINAL TIE- INTO EXISTING DUCT SCHEDULED TO BE DONE ON 1/6/20. OR-6 - RELOCATED VAV-TB2-106 / MEDIUM AND LOW PRESSURE DUCT ROUGH OK, OK TO WRAP / GRILLS AND REGISTER FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 6435753 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/10/2019 | 2ND FLOOR MH-123 ( BDA 143 : ((NEED REVISED AND APPROVED PLAN PAGE FOR 1- 14 X 14 DAMPER ELIMINATED IN ROOM # 2606 )) 5 - DAMPERS COMPLETE. | LIDO | LIDO | | HD | P | 6422587 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/13/2019 | 2ND FLOOR MH-123 ( BDA139) SUPPLY, RETURN, EXHAUST GRILLS AND REGISTERS FOR ELEVATOR LOBBY # 2602 OK. | LIDO | LIDO | | HD | P | 6398438 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 11/13/2019 | 2ND FLOOR MP-123 ( BDA 126) HUMIDIFIER H-2-19 FINAL CONNECTIONS OK / UNDER OPERATING PRESSURE OK NO VISIBLE LEAKS. STILL NEED LOW PRESSURE STEAM BEHIND SHAFT # 2100. | LIDO | LIDO | | H= | P | 6398431 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/11/2019 | 2ND FLOOR MH123 ( BDA 143) SPLICE DATED 11/1/19 : TWO DAMPERS COMPLETE / VAV 2-218 AND LOW PRESSURE DUCT ROUGH COMPLETE. | LIDO | LIDO | | HD | P | 6395458 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/30/2019 | 2ND FLOOR MH-123 ( BDA 139) AFTER RESEARCH FOR SUPPLY PENETRATING A WALL FOR VAV 2-231 IN ROOM # 2623 FROM ELEVATOR LOBBY / WALL IS A SMOKE PARTITION , PENETRATION OK. | LIDO | LIDO | | HD | P | 6384145 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/30/2019 | 2ND FLOOR MH-123 ( BDA 139) NEED TO RESEARCH SUPPLY PENETRATING A WALL FOR VAV 2-231 IN ROOM # 2623 FROM ELEVATOR LOBBY. OR-17 ROOM # 2622 AND EQUIPMENT ROOM # 2633 SUPPLY, RETURN, EXHAUST DUCT ROUGH OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6384020 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 10/23/2019 | 2nd FLOOR MP-123 ( BDA 126) NEED REVISED AND APPROVED SPLICE FOR VAV 2-234 MOVED FROM CORRIDOR TO ROOM # 2575 / VAV 2-228 MOVED FROM CORRIDOR TO ROOM # 2606 AND VAV-2-239 MOVED FROM CORRIDOR TO ROOM # 2573. SUPPLY AND RETURN HEAT WATER PIPING FOR VAV- 2-228, 2-229, 2-230, 2-227 UNDER OPERATING PRESSURE OK / NO VISIBLE LEAKS / OK TO WRAP AND LABEL. ALL VAV TIE - INS OK / EXCEPT FOR VAV 2-235. | LIDO | LIDO | | HWP | C | 6378097 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/10/2019 | 2ND FLOOR MH-123 ( BDA 139) 1 - RETURN AIR DAMPER SHOWN ON PLAN FOR ROOM # 2606 IS NOT BEING INSTALLED / ENGINEER TO ADDRESS AND PROVIDE REVISED AND APPROVED PLANS . SUPPLY, RETURN AND EXHAUST DUCT ROUGH OK / OK TO WRAP. 1- DAMPER COMPLETE. | LIDO | LIDO | | HD | P | 6365230 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/08/2019 | 2ND FLOOR SPLICE MH-123 ( BDA 139) (NEED REVISED / APPROVED PLANS FOR DELETED SUPPLY AIR FIRE DAMPER IN WALL FOR ROOM # 2605.) 11 - DAMPER COMPLETE. SUPPLY, RETURN AND EXHAUST DUCT ROUGH IN ROOMS 2000, 2604, 2573 AND SOUTH OF (OR) 14 OK. | LIDO | LIDO | | HD | P | 6362296 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 10/06/2019 | (( PHASE - 2 )) (HWP) HEAT WATER PIPING INSPECTIONS DONE ON PERMIT M34809. THERE ARE STILL INSPECTIONS REMAINING ON THIS PHASE -2 PERMIT. PLEASE CALL HEAT WATER PIPING INSPECTIONS ON THIS PHASE UNDER THIS PERMIT NUMBER WHEN READY. | LIDO | LIDO | | HWP | P | 6359054 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/06/2019 | (( PHASE -2 )) (HD) DUCT ROUGH INSPECTIONS DONE ON PERMIT M34809. THERE ARE STILL INSPECTIONS REMAINING ON THIS PHASE -2 PERMIT. PLEASE CALL DUCT INSPECTIONS ON THIS PHASE UNDER THIS PERMIT NUMBER WHEN READY. | LIDO | LIDO | | HD | P | 6359053 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 02/24/2020 | operating rooms phase 2 complete, note: see permit M34809 for all rough inspection, rough inspections completed under phase 1 before permit was put into phases | TED | TED | | P= | C | 6490217 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 12/23/2019 | PAID (REC#1652059) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: removed fire daper aqnd rerouted water lines | TCRIPPEN | TCRIPPEN | | XMS | T | 6435744 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 12/19/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised for phasing coloring | JUSTINC | JUSTINC | | XMS | P | 6432725 |
ENCORE ELECTRIC, INC. | XES | P | 11/01/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Add smoke dampers | SHELBY | SHELBY | | XES | P | 6386375 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 11/01/2019 | PAID (REC#1643374) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 6386356 |
ENCORE ELECTRIC, INC. | XES | P | 10/04/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Phasing | SHELBY | SHELBY | | XES | P | 6357580 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XMS | T | 09/30/2019 | PAID (REC#1641213) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Plan approval is for phasing only. See previously approved plan for all mechanical work. | JUSTINC | JUSTINC | | XMS | T | 6351740 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XMS | T | 09/30/2019 | PAID (REC#1641213) PLAN SPLICE FEE: $75 by: JUSTINC for Mechanical: Plan approval is for phasing only. See previously approved plan for all mechanical work. | JUSTINC | JUSTINC | | XMS | T | 6351732 |