COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | C | 05/07/2020 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 6563830 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | P | 12/02/2019 | pending other inspections / note - pre-existing restrooms - office. Additional Inspections Required (computer generated): ADVANTAGE HEATING & COOLING Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6412880 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 10/11/2019 | observed light gauge non-load bearing wall framing / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6365752 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | L | 10/10/2019 | call ahead confirmed 1:40 / doors locked 2:10 / no inspection performed | BRIANB | BRIANB | | BFR | L | 6365028 |
ADVANCE ELECTRIC | E= | C | 11/04/2019 | final complete | CHIPO | CHIPO | | E= | C | 6387393 |
ADVANCE ELECTRIC | ER | C | 11/04/2019 | rough in complete | CHIPO | CHIPO | | ER | C | 6387392 |
ADVANCE ELECTRIC | ER | C | 10/11/2019 | interior rough in complete | CHIPO | CHIPO | | ER | C | 6366132 |
ADVANCE ELECTRIC | ER | L | 10/10/2019 | Made call ahead, tried doors G and F but both locked. No one on site. Even waited extra. | CHIPO | CHIPO | | ER | L | 6364989 |
ADVANTAGE HEATING AND COOLING | H= | C | 05/07/2020 | Plan splice on file for air balance | MARKB | MARKB | | H= | C | 6563829 |
ADVANTAGE HEATING AND COOLING | HSP | P | 11/22/2019 | Contractor to review test and balance report before submitting - TAB received has multiple issues listed on report. | MARKB | MARKB | | HSP | P | 6408012 |
ADVANTAGE HEATING AND COOLING | H= | P | 11/11/2019 | FOR FINAL - Provide test and balance report for review | MARKB | MARKB | | H= | P | 6394216 |
ADVANTAGE HEATING AND COOLING | H= | P | 11/07/2019 | Thermostats mounted more than 48" above floor and need a locking box installed. Provide test and balance report for review | MARKB | MARKB | | H= | P | 6392398 |
ADVANTAGE HEATING AND COOLING | H= | P | 11/06/2019 | Need site visit to verify thermostat height and provide test and balance report | MARKB | MARKB | | H= | P | 6389725 |
ADVANTAGE HEATING AND COOLING | HD | C | 10/17/2019 | CORRECTIONS MADE. FOR FINAL NEED TEST AND BALANCE REPORT AND TO VERIFY MAXIMUM T-STAT HEIGHT OF 48" TO TOP OF T-STATS | BILLS | BILLS | | HD | C | 6372516 |
ADVANTAGE HEATING AND COOLING | HD | P | 10/17/2019 | IMAGES RECEIVED, WILL REQUIRE AN ON-SITE INSPECTION | BILLS | BILLS | | HD | P | 6371455 |
ADVANTAGE HEATING AND COOLING | HD | P | 10/15/2019 | CHANGED INSPECTION TO AN HD. REMOVE EXISTING FIRE DAMPERS AT RETURN AND SUPPLY DUCTS (SEE MECHANICAL NOTES M-04 AND M-05 ON MECHANICAL PAGE M2.01, INSTALL T-STAT TO NEW LOCATION. | BILLS | BILLS | | HD | P | 6369483 |