HITT CONTRACTING INC. | B= | C | 02/11/2020 | | NICK | NICK | | B= | C | 6479334 |
HITT CONTRACTING INC. | B= | L | 02/07/2020 | No access to suite once arrived on site / Left call ahead at 9:45 / Once contractor on site could not gain access to suite / Please recall inspection | NICK | NICK | | B= | L | 6476567 |
HITT CONTRACTING INC. | B= | P | 12/19/2019 | Need to install smoke seal for door 270 vestibule / Need to install 45min door for vestibule 270 door / Need all other finals complete / -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), MURPHY CO MECH CONTRS & ENGNRS Mechanical Final Inspection is not Completed yet, MURPHY CO MECH CONTRS & ENGNRS Plumbing Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6432225 |
HITT CONTRACTING INC. | BSP | P | 12/12/2019 | Pre walk for final with contractor / Reviewed accessible elements / Reviewed requirements for final inspection | NICK | NICK | | BSP | P | 6425430 |
HITT CONTRACTING INC. | BSP | P | 11/21/2019 | All penetrations through rated walls OK | NICK | NICK | | BSP | P | 6406793 |
HITT CONTRACTING INC. | BFR | P | 11/15/2019 | Hard lid framing for vestibule OK / Still need to inspect all penetrations through rated walls throughout | NICK | NICK | | BFR | P | 6401567 |
HITT CONTRACTING INC. | BFR | P | 10/24/2019 | All framing OK other than hard lid framing for vestibule / Need all MEP's complete / Need to inspect all penetrations for rated walls / Interior layer of 5/8 rock per U419 OK at corridor walls / Reviewed accessible elements | NICK | NICK | | BFR | P | 6379429 |
HITT CONTRACTING INC. | BFR | P | 10/11/2019 | Frame for some interior remodel sections see plans on site / Need to splice plans to show new layout for some areas of interior remodel / 1st layer of 5/8 rock per U419 for 4D walls at corridor and OK at exterior new locations and on interior side / Reviewed accessible elements | NICK | NICK | | BFR | P | 6366356 |
HITT CONTRACTING INC. | BFR | P | 10/02/2019 | Partial frame inspection / Need to attach mechanical and plumbing permits / Reviewed accessible elements / Inspection for 4D fir walls at existing corridor locations / Frame for these walls OK, shown on approved plans as 1hr rated wall U419 / For sections of 4D walls where existing corridor being removed for door ways need to install to underside of deck / Need mechanical inspection for dampers to be installed in these walls / Still need to inspect all other framing / Need to splice plans for new layout | NICK | NICK | | BFR | P | 6355802 |
LUDVIK ELECTRIC CO. | E= | C | 12/19/2019 | | CRAIGS | CRAIGS | | E= | C | 6432044 |
LUDVIK ELECTRIC CO. | E= | P | 12/18/2019 | need panel schedule -- need tapered threads where the rigid coupling is on the secondary side of the transformer -- hang remainder of the lights --- everything else OK--- please up load the letter for the platform to your next inspection request | CRAIGS | CRAIGS | | E= | P | 6431349 |
LUDVIK ELECTRIC CO. | ER | P | 12/06/2019 | above ceiling main entry area ----- 480 volt transformer hug from the pre stress concrete needs 3 1/2 foot working clearance | CRAIGS | CRAIGS | | ER | P | 6419371 |
LUDVIK ELECTRIC CO. | ER | P | 11/27/2019 | ceilings only in secured area | GARYL | GARYL | | ER | P | 6411419 |
LUDVIK ELECTRIC CO. | ER | P | 11/25/2019 | ceilings only, marked/dated on prints | GARYL | GARYL | | ER | P | 6409893 |
LUDVIK ELECTRIC CO. | ER | P | 11/08/2019 | two lights and exit in vestibule | GARYL | GARYL | | ER | P | 6393095 |
LUDVIK ELECTRIC CO. | ER | P | 10/31/2019 | All walls, everything eles shown on walls will be surface mounted, check at final | GARYL | GARYL | | ER | P | 6384465 |
LUDVIK ELECTRIC CO. | ER | P | 10/23/2019 | All walls, EXCEPT north wall "clouded"-- not ready | GARYL | GARYL | | ER | P | 6378043 |
LUDVIK ELECTRIC CO. | ER | P | 10/17/2019 | conference room walls still need floor receptacle --- break room walls -- 2 -phone room walls -- OK | CRAIGS | CRAIGS | | ER | P | 6371952 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | C | 12/20/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6433244 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 12/18/2019 | TAB REPORT RECEIVED SEVERAL READINGS OUTSIDE +/- 10% - NEED ALL EQUIPMENT IN PROPER WORKING ORDER NOTES: DAMPER LABELS OK | JERRYF | JERRYF | | H= | P | 6430368 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 12/17/2019 | STILL NEED THE FOLLOWING - TAB REPORT - LABEL ALL ACCESS DOORS AND GRID AT FIRE DAMPERS NOTES: PICTURES OF RETAINING ANGLES / PRESSURE TEST AND CONDENSER TAGS RECEIVED | JERRYF | JERRYF | | H= | P | 6429165 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 12/12/2019 | CANCELED BY CONTRACTOR THROUGH PHONE CALL . NEED THE FOLLOWING TO COMPLETE FINAL- PRESSURE TESTS ON SOUTH CONDENSERS AND LABEL ALL CONDENSERS TO UNITS SERVED CONTRACTOR CAN SUPPLY PICTURES OF PRESSURE TESTS AND CONDENSER LABELS - LABEL ALL CEILING GRID AT FIRE DAMPERS CONTRACTOR CAN SUPPLY PICTURES OF GRID LABELS - INSTALL RETAINING ANGLE AT 80" DAMPER - TAB REPORT. | LIDO | LIDO | | H= | P | 6424992 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 12/11/2019 | NO DAMPER INSTALLATION INSTRUCTIONS ON SITE TO VERIFY PROPER INSTALLATION OF RETAINING ANGLE. NO ACCESS TO ROOF FOR PRESSURE TESTS ON SOUTH CONDENSERS AND LABELING FOR ALL CONDENSERS TO UNITS SERVED. NO ACCESS TO DEMO ROOM TO VERIFY DAMPER LABELING AND DAMPER LABELS NOT IN PLACE FOR DAMPER NEAR PANTRY/BAR. RE-INSPECT ALL FROM PRIOR INSPECTION. | DUSTINS | DUSTINS | | H= | P | 6424801 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 12/10/2019 | CHANGED INSPECTION TO HEAT FINAL - NEED THE FOLLOWING TO COMPLETE FINAL- PRESSURE TESTS ON SOUTH CONDENSERS AND LABEL ALL CONDENSERS TO UNITS SERVED CONTRACTOR CAN SUPPLY PICTURES OF PRESSURE TESTS AND CONDENSER LABELS - LABEL ALL CEILING GRID AT FIRE DAMPERS CONTRACTOR CAN SUPPLY PICTURES OF GRID LABELS - INSTALL RETAINING ANGLE AT 80" DAMPER - TAB REPORT NOTES: INSPECTION IS RECALLED FOR 12 / 11 PER CONTRACTORS REQUEST | JERRYF | JERRYF | | H= | P | 6423101 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | L | 12/06/2019 | CANCELED BY CONTRACTOR UPON ARRIVAL - NO ACCESS | JERRYF | JERRYF | | HD | L | 6419681 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 12/03/2019 | CHANGED INSPECTION HEAT FINAL - NEED THE FOLLOWING - PROPER GAP AT TOP OF 80 X 16 DAMPER BEFORE RETAIN AGE CAN BE INSTALLED - PLAN REVISION FOR NEW 48 X 18 TRANSFER HOLE IN DEMO ROOM - TAB REPORT - PROTECT ALL PLASTIC PIPING -REPLACE WOOD WATER HEATER PLATFORM AND PROTECT CONDENSATE DRAINS TO 25 / 50 FLAME SPREAD - REPLACE VINYL TUBING IN WALLS AT CRAC UNITS - PROTECT ALL WOOD IN WALL AT NEW TRANSFER OPENING - ROOF INSPECTION FOR ALL CONDENSERS AND EQUIPMENT LABELS - ALL DAMPER ACCESS LABELS NOTES: THE FOLLOWING ROOMS ARE OK - VESTIBULE - 275 - 276 - 274 - 273 - 288 - 287 | JERRYF | JERRYF | | H= | P | 6414915 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 11/27/2019 | NEED FIRE DAMPER INSTALL MANUAL TO VERIFY BREAKAWAY CONNECTIONS / WILL NEED ANGLES REMOVED ON 1 SIDE OF ALL DAMPERS TO VERIFY GAP - NEED ALL DAMPER ACCESS DOORS AT DUCTS AND CEILINGS COMPLETED AND ALL LABELS INSTALLED - NEED REFRIGERATION LINE SET INSPECTION - NEED TRANSFER DUCT OPENING AT DEMO ROOM AT THIS TIME WALL HAS NO OPENINGS FOR RETURN AIR PATH - CONTRACTOR TO SUPPLY PICTURES OF FLEX CONNECTIONS AT ALL GRILLES IN DEMO ROOM CEILING | JERRYF | JERRYF | | HD | P | 6412094 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 11/21/2019 | BEFORE CRAC UNITS ARE INSTALLED NEED TO ATTACH THEM TO PERMIT WORK SCOPE - AT TIME OF NEXT INSPECTION NEED THE FOLLOWING - VERIFY FIRE DAMPER ACCESS DOORS / LABELS AT DOORS AND CEILING GRID - ALL CONTROLS NOTES: THIS INSPECTION WAS FOR THE FOLLOWING ROOMS - 275 - 272 - 279 - 278 - 281 - 280 - 285 - 286 - SUPPLY AND RETURN GRILLES GRILLES ARE COMPLETE IN THESE ROOMS | JERRYF | JERRYF | | H= | P | 6407563 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HSP | P | 10/11/2019 | BY FINAL WILL NEED SPLICE FOR CHANGED DUCT, HAD A SPLICE ON SITE DATED 10/2/19 THAT G/C IS SUPPOSE TO SUBMIT BUT IS NOT IN OUR SYSTEM YET, LOOKED AT 24 X 16 DUCT AND 16" ROUND TO 12" ROUND MAINS IN SCIFF AREA, OK TO INSULATE, STILL NEED TO LOOK AT VAV-7 AND 9 AND ALL MEDIUM PRESSURE TIE INS | BENH | BENH | | HSP | P | 6366822 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 10/09/2019 | FIRE DAMPER FRAMING AT 4 HOLES OK | JERRYF | JERRYF | | HD | P | 6363022 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 10/04/2019 | NEED TO COVER OPEN HOLES IN ALL KING STUDS AT 3 DAMPER LOCATIONS - CONTRACTOR WILL CALL JACK ARRINGTON TO SCHEDULE AFTER HOURS INSPECTION | JERRYF | JERRYF | | HD | P | 6358925 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | P= | C | 12/20/2019 | Corrections made. | SAMH | SAMH | | P= | C | 6433409 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | P= | P | 12/17/2019 | Sink height exceeds 34", Need shock arrestor at dishwasher supply. Rest OK. | SAMH | SAMH | | P= | P | 6429674 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PTO | C | 12/17/2019 | Corrections made. | SAMH | SAMH | | PTO | C | 6429663 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PTO | P | 11/01/2019 | Need nail protection at 2" dwv down through floor, Complete vent, Need Vacuum relief and drain valve at water heater. Verify water heater pan termination, 2" waste POC, and Insulation. Support pan drain every 4'. | SAMH | SAMH | | PTO | P | 6385476 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | XMS | T | 12/06/2019 | PAID (REC#1649113) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 6418578 |
HITT CONTRACTING INC. | XBS | T | 10/16/2019 | PAID (REC#1639539): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise assembly locations | MICHAELA | MICHAELA | | XBS | T | 6369907 |
LUDVIK ELECTRIC CO. | XES | T | 10/09/2019 | PAID (REC#1637396): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised for background change. | BERTHA | BERTHA | | XES | T | 6363027 |