TRALON HOMES, LLC | B= | C | 01/24/2020 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 6463084 |
TRALON HOMES, LLC | B= | P | 01/21/2020 | Unfinished basement / AC / No decks. Additional Inspections Required (computer generated): External Agency Inspection UWS by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111). | ADAML | ADAML | | B= | P | 6458459 |
TRALON HOMES, LLC | BIN | C | 12/03/2019 | 3rd Party Insulation Certificate on file / Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file | ADAML | ADAML | | BIN | C | 6413665 |
TRALON HOMES, LLC | BFR | C | 12/02/2019 | Unfinished basement / AC pre wire only / No decks / Great job! | ADAML | ADAML | | BFR | C | 6413292 |
TRALON HOMES, LLC | BIN | P | 11/27/2019 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6411796 |
TRALON HOMES, LLC | BSP | P | 11/27/2019 | Site specific truss details on file | ADAML | ADAML | | BSP | P | 6410557 |
TRALON HOMES, LLC | BSP | P | 11/14/2019 | Porch and portal wall OK | ADAML | ADAML | | BSP | P | 6399495 |
TRALON HOMES, LLC | BFD | C | 11/07/2019 | | SHAUN | SHAUN | | BFD | C | 6390942 |
TRALON HOMES, LLC | BFD | P | 10/29/2019 | Drain not tied to street | SHAUN | SHAUN | | BFD | P | 6382829 |
TRALON HOMES, LLC | BFD | R | 10/25/2019 | Drain not tied-in at street / Not completed in areas / Damp proofing okay | SHAUN | SHAUN | | BFD | R | 6380812 |
TRALON HOMES, LLC | BSP | P | 10/24/2019 | Complete BFD / Test report for materials used in fire protection of floor per IRC 302.13 EX #4 on file / | SHAUN | SHAUN | | BSP | P | 6378800 |
TRALON HOMES, LLC | BFN | C | 10/24/2019 | Foundation observations with ufer noted on file | SHAUN | SHAUN | | BFN | C | 6378794 |
TRALON HOMES, LLC | BFT | C | 10/24/2019 | Open excavation report 2,400 psf / Drain around habitable space / 1 1/2" float and isolate / 10% grade / Drain design on file | SHAUN | SHAUN | | BFT | C | 6378788 |
TRALON HOMES, LLC | BSP | P | 10/24/2019 | Foundation design job# 168377 2,400 psf on file | SHAUN | SHAUN | | BSP | P | 6378777 |
TRALON HOMES, LLC | BFT | P | 10/07/2019 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFT | P | 6360416 |
TRALON HOMES, LLC | BFN | P | 10/07/2019 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFN | P | 6360415 |
J2D ELECTRIC, INC. | E= | C | 01/14/2020 | a/c installed--25 amp | TIMA | TIMA | | E= | C | 6452507 |
J2D ELECTRIC, INC. | E= | R | 01/13/2020 | recept. below 3 gang switch in kitchen has no power / strap flex at furnace----a/c installed--25 amp | TIMA | TIMA | | E= | R | 6451145 |
J2D ELECTRIC, INC. | ER | C | 11/27/2019 | #8 AL to oven/range / No Cent Vac / Irreversible UFER connection / Unfinished Basement / | TIMA | TIMA | | ER | C | 6411346 |
J2D ELECTRIC, INC. | ER | R | 11/25/2019 | need to complete wiring in master bath / open j-box on can light in kitchen | TIMA | TIMA | | ER | R | 6409695 |
J2D ELECTRIC, INC. | ES | C | 11/25/2019 | Residential Underground: 150 amp 3/w new res. needs meter seal | TIMA | TIMA | | ES | C | 6409689 |
J2D ELECTRIC, INC. | EUG | C | 11/12/2019 | 2/0 | TIMA | TIMA | | EUG | C | 6395947 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 01/14/2020 | | JEFFL | JEFFL | | H= | C | 6452406 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 01/13/2020 | HOME LOCKED, OK TO ATTACH PICTURE OF CORRECTION TO AN INSPECTION REQUEST / | MATTM | MATTM | | H= | P | 6451427 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 01/10/2020 | Approved grommets are needed for furnace penetrations on direct vent furnace.. low voltage, gas, and condensation. Whole house ventilation achieved with laundry exhaust fan. Notes-- Direct vent furnace. Unfinished basement. Outside air to return duct with damper. AC complete. | JEFFL | JEFFL | | H= | P | 6449972 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 01/10/2020 | Duct leakage report received. See images. | JEFFL | JEFFL | | H= | P | 6448928 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 11/25/2019 | RELEASE METER | DUSTINS | DUSTINS | | HC | C | 6410162 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 11/25/2019 | NEED DUCT LEAKAGE REPORT BY FINAL. WHOLE HOUSE VENTILATION IS BEING ACCOMPLISHED BY EXHAUST FAN IN LAUNDRY ROOM, MANUAL OVERRIDE SWITCH LOCATION TO BE DETERMINED BY FINAL. NOTE: UNFINISHED BASEMENT, DIRECT VENT FURNACE, DAMPERED OUTSIDE AIR TO FURNACE RETURN, A/C ROUGH COIL AND LINE SET ONLY. | DUSTINS | DUSTINS | | HRR | C | 6410159 |
CJ'S PLUMBING, HEATING & EXCAVATING, LLC | HI | C | 11/22/2019 | 10LB TEST OK. 1" MAIN, 1 FURNACE, 1 WATER HEATER | BILLS | BILLS | | HI | C | 6408669 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 01/09/2020 | Ok. Note: PVB installed. | DANR | DANR | | P= | C | 6448516 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 11/27/2019 | note: unfinished basement, irrigation stub, aav @ basement lav, tempering at water heater | JOSEPHD | JOSEPHD | | PTO | C | 6411679 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 11/04/2019 | | JOSEPHD | JOSEPHD | | PB | C | 6387454 |