COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | C | 10/14/2021 | | BERTW | BERTW | | B= | C | 7142159 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | P | 09/23/2021 | interior structure is complete and strucural components are covered, need 3ng letter approving all strucural components and connections, also need eng letter for RTU support in roof / ttraining with Christine K -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. UPDATE 9/23/2021 by Bert W -- Upon Further Review engineering for RTU structure needed. | BOBF | BOBF | | B= | P | 7117825 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | P | 09/23/2021 | Training with Bob F / Reviewed requirements for premanufactured structures within existing building / Reviewed RTU requirements | CHRISTINEH | CHRISTINEH | | BSP | P | 7117650 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BE | C | 09/24/2020 | | SAVANNAHT | SAVANNAHT | | BE | C | 6718390 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BE | C | 04/10/2020 | | LONNYS | LONNYS | | BE | C | 6537504 |
FOSTER ELECTRIC CORPORATION | E= | C | 12/16/2020 | Fault current for two RTUs listed on approved plans - complete | CHIPO | CHIPO | | E= | C | 6810255 |
FOSTER ELECTRIC CORPORATION | EP | P | 12/04/2020 | panel 2A4 400 amp 4/w 480 v ok Delta panel 2B1 400 amp 4/w ok 2B1 150 kva xfmr ok | CRAIG | CRAIG | | EP | P | 6796731 |
FOSTER ELECTRIC CORPORATION | E= | P | 12/04/2020 | clean room 2 ok | CRAIG | CRAIG | | E= | P | 6796720 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/02/2020 | 2 - 3" emt to new panels and xfmr ok | CRAIG | CRAIG | | ER | P | 6794501 |
FOSTER ELECTRIC CORPORATION | E= | P | 12/02/2020 | clean room 1 ok | CRAIG | CRAIG | | E= | P | 6794494 |
FOSTER ELECTRIC CORPORATION | E= | P | 12/01/2020 | RTU 1 at 30 amps, RTU 2 at 50 amps, all else okay - need SCCR letter to complete | CHIPO | CHIPO | | E= | P | 6792328 |
FOSTER ELECTRIC CORPORATION | ER | C | 12/01/2020 | FIRE ALARM INSPECTION: rough in complete | CHIPO | CHIPO | | ER | C | 6792311 |
FOSTER ELECTRIC CORPORATION | EE | L | 09/24/2020 | Renewed online for 1/2 Fee at 9/24/2020 2:59:39 PM (RECEIPT #: 1715994) | WEBSITE | WEBSITE | | EE | L | 6718589 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/19/2020 | FIRE ALARM INSPECTION: 14/2 fplp cable for clean room 2 ok | CRAIG | CRAIG | | ER | P | 6485993 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/19/2020 | clean room 2 above ceiling ok | CRAIG | CRAIG | | ER | P | 6485992 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/11/2020 | Clean room #1 okay except RTUs | CHIPO | CHIPO | | E= | P | 6479365 |
FOSTER ELECTRIC CORPORATION | E= | C | 02/11/2020 | FIRE ALARM INSPECTION: Fire alarm rough in complete | CHIPO | CHIPO | | E= | C | 6479361 |
FOSTER ELECTRIC CORPORATION | ER | C | 02/11/2020 | FIRE ALARM INSPECTION: Fire alarm rough in complete | CHIPO | CHIPO | | ER | C | 6479360 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/09/2020 | clean room 1 for above ceiling ok Electrical Rough ok, FA not complete --------------- do not drop tiles in ceiling --------------- / | CRAIG | CRAIG | | ER | P | 6447828 |
FOSTER ELECTRIC CORPORATION | ER | R | 01/03/2020 | all switches in all 10 clean rooms were done by third party and not inspected ------------ Discussed accessibility requirements with contractor / | CRAIG | CRAIG | | ER | R | 6442683 |
AIRTECH MECHANICAL, INC. | H= | C | 10/06/2021 | NOTE / TAB REPORT RECEIVED / | JERRYF | JERRYF | | H= | C | 7131339 |
AIRTECH MECHANICAL, INC. | H= | P | 09/23/2021 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 7118084 |
AIRTECH MECHANICAL, INC. | HE | L | 09/22/2021 | Renewed for $100.00 at 9/22/2021 10:58:46 AM (Receipt#1808871) | SIERRAC | SIERRAC | | HE | L | 7115842 |
AIRTECH MECHANICAL, INC. | HD | P | 07/31/2020 | STILL NEED - EF-2 and duct installed, Missing 2 supplies for RTU-2 above gowning 2-04, Missing 1 transfer for HPCR 1-04 and 1 transfer in WSP 1-01. Need to inspect new equipment on roof. ABOVE CEILING DUCT - BESIDES LISTED ABOVE, ALL DUCT, GRILLS & TRANSFERS FOR RTU-1 & 2 COMPLETE. | MARKB | MARKB | | HD | P | 6657667 |
AIRTECH MECHANICAL, INC. | HE | L | 07/30/2020 | Renewed for No Fee at 7/30/2020 1:33:15 PM | VERONIKAP | VERONIKAP | | HE | L | 6656005 |
AIRTECH MECHANICAL, INC. | HD | P | 01/13/2020 | ----NEED PLUMBING CONTRACTOR ATTACHED TO PERMIT---- ABOVE CEILING DUCT - SUPPLY/EXHAUST FOR HPCR AREA RTU-1 INSTALLED PER PLAN | MARKB | MARKB | | HD | P | 6451135 |
DRUMMOND PLUMBING LLC | P= | C | 05/21/2021 | see images for AMM form for bottle filling station and revisions complete | JOHNS | JOHNS | | P= | C | 6976646 |
DRUMMOND PLUMBING LLC | P= | P | 04/09/2021 | to complete plbg permit just NEED to revise plans to show drum wash drain and waters to be future use only (not installing @ this time) AND to show future stub out for special process piping BUT will install bfp to lines serving special processing piping
NEED alternate method and materials form uploaded to permit for low drinking fountain w/ bottlr filler station
rest ok | JOHNS | JOHNS | | P= | P | 6929043 |
DRUMMOND PLUMBING LLC | P= | P | 12/03/2020 | STILL NEED to revise plans to show drum wash drain and waters to be future use only (not installing @ this time) AND to show future stub out for special process piping BUT will install bfp to lines serving special processing piping
NEED alternate method and materials form uploaded to permit for low drinking fountain w/ bottlr filler station
hard cap drain and waters @ drum wash station, complete hot insulation @ hand sink, install bfp @ special process piping area and run drain to floor sink, rest ok | JOHNS | JOHNS | | P= | P | 6795196 |
DRUMMOND PLUMBING LLC | PTO | P | 11/30/2020 | NEED to revise plans to show drum wash drain and waters to be future use only AND to show future stub out for special process piping (not installing @ this time) BUT will install bfp to lines serving special processing piping
NEED alternate method and materials form uploaded to permit
rest ok PENDING revisions. NOTE: vtr (existing), check water tie ins @ hand sink / d.f., verify slope @ deionizer floor sinks tie in | JOHNS | JOHNS | | PTO | P | 6791529 |
DRUMMOND PLUMBING LLC | PE | L | 10/22/2020 | Renewed online for 1/2 Fee at 10/22/2020 2:48:04 PM (RECEIPT #: 1723885) | WEBSITE | WEBSITE | | PE | L | 6751535 |
DRUMMOND PLUMBING LLC | XPS | T | 05/19/2021 | PAID (REC#1774607): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 5 revisions: adjusted sheets P001, P111, P121, P301 and P601 | SHANEN | SHANEN | | XPS | T | 6973474 |
AIRTECH MECHANICAL, INC. | XMS | P | 01/14/2020 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: new splice add return air path in plenum | TCRIPPEN | TCRIPPEN | | XMS | P | 6452954 |
FOSTER ELECTRIC CORPORATION | XES | T | 01/14/2020 | PAID (REC#1655757) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Feed RTU 2 fron different panel | SHELBY | SHELBY | | XES | T | 6452929 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | XES | T | 12/16/2019 | PAID (REC#1650721) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised one-line diagram - removed panels - revised panel schedules. | BERTHA | BERTHA | | XES | T | 6428994 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | XBS | P | 11/01/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Added 2 drinking fountains and 2 hand sinks - 1 handsink must be accessible | DANM | DANM | | XBS | P | 6385405 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | XPS | T | 10/31/2019 | PAID (REC#1641500) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 10/31/19: Delta 2 revisions added plumbing pages | SHANEN | SHANEN | | XPS | T | 6384636 |