HAMMERS CONSTRUCTION, INC | B= | C | 12/12/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6425037 |
HAMMERS CONSTRUCTION, INC | B= | P | 12/11/2019 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DANE | DANE | | B= | P | 6424333 |
HAMMERS CONSTRUCTION, INC | BSP | T | 11/20/2019 | PAID (REC#1645929) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Revised walls at restrooms for posts and added door at reception | SHELLEY | SHELLEY | | BSP | T | 6405929 |
HAMMERS CONSTRUCTION, INC | BFR | P | 11/08/2019 | need to splice in added wall and door between reception area and hall to exam rooms / all interior light gauge framing OK pending other roughs and splice / discussed accessible elements | DANE | DANE | | BFR | P | 6392951 |
SYSTEMS ELECTRIC, INC. | E= | C | 12/06/2019 | | BRET | BRET | | E= | C | 6418610 |
SYSTEMS ELECTRIC, INC. | E= | P | 11/27/2019 | Contractor to recall final / | ROB | ROB | | E= | P | 6411919 |
SYSTEMS ELECTRIC, INC. | ER | P | 11/27/2019 | Rough ok for electrical in ceiling / Low voltage needs to be removed, or all cables need to be tagged / | ROB | ROB | | ER | P | 6411913 |
SYSTEMS ELECTRIC, INC. | ER | P | 11/08/2019 | walls only,,, NOTE! all switch legs going to lights are in hosp/mc | GARYL | GARYL | | ER | P | 6393400 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 12/09/2019 | Corrections made and test and balance report received see (images) | LIDO | LIDO | | H= | C | 6420055 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 12/02/2019 | PARTIAL PENDING : LABEL THERMOSTATS. MISSING MANUAL VOLUME DAMPERS FOR THE TWO 8" OUTSIDE AIR IN MECHANICAL ROOM. INSULATE OUTSIDE AIR IN MECHANICAL ROOM AND BY TERMINATION INSIDE BUILDING. LABEL CEILING IDENTIFYING LOCATION OF THE TWO OUTSIDE AIR BACK DRAFT DAMPERS BY THE TERMINATIONS. OK TO ATTACH PICTURES TO THE NEXT INSPECTION REQUEST. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6413623 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 11/12/2019 | ALL ABOVE CEILING DUCT ROUGH OK / OK TO WRAP. ALL SUPPLY GRILLS INSTALLED. STILL NEED TO INSPECT OUTSIDE AIR TO EXISTING FURNACE F-2 AND F-3. | LIDO | LIDO | | HD | P | 6396898 |
MARTINSON MECHANICAL, INC | P= | C | 11/25/2019 | revised plans ok. | TAYLOR | TAYLOR | | P= | C | 6409343 |
MARTINSON MECHANICAL, INC | PTO | C | 11/08/2019 | By final need engineers letter for AAV at sinks. | SAMH | SAMH | | PTO | C | 6392696 |
SYSTEMS ELECTRIC, INC. | XES | P | 11/20/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised for background change. | BERTHA | BERTHA | | XES | P | 6406107 |
NIELSEN MECHANICAL CONTRACTORS, INC. | XMS | T | 11/20/2019 | PAID (REC#1645928) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to change O.S.A. ducts to flex | DALEH | DALEH | | XMS | T | 6406052 |
MARTINSON MECHANICAL, INC | XPS | P | 11/20/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 11/20/19: Delta 1 revisions P2.1 revised plumbing plan | SHANEN | SHANEN | | XPS | P | 6405893 |