GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | C | 01/20/2021 | Electrical complete, per building inspector B= is OK | GITA | GITA | | B= | C | 6842747 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | P | 12/23/2020 | Temp CO: TCO extension, waiting for electric and mechanical finals ( Expires: 1/22/2021 12:00:00 AM) | RITA | RITA | | B= | P | 6818737 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | P | 11/30/2020 | . Additional Inspections Required (computer generated): B & M CONSTRUCTION, INC. Electrical Final Inspection is not Completed yet, REEVES SPECIALTY SERVICES, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6789913 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BE | T | 11/25/2020 | PAID (REC#1732603) TCo | JANE | JANE | | BE | T | 6789174 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | P | 11/25/2020 | Temp CO: tco ( Expires: 12/25/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6789165 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | P | 11/24/2020 | need to complete mech and elec finals, provide ANSI compliant signs showing wheelchair accessible at rest rooms, rest of building okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): B & M CONSTRUCTION, INC. Electrical Final Inspection is not Completed yet, REEVES SPECIALTY SERVICES, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6787172 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | P | 11/09/2020 | eng letter for open hole, footing, steel, bond beams and structural steel connections on file -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), B & M CONSTRUCTION, INC. Electrical Final Inspection is not Completed yet, REEVES SPECIALTY SERVICES, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6768923 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | P | 09/24/2020 | pending completion of other required inspections, frame okay / reviewed the need for required letters for foundation and structural components | BOBF | BOBF | | BFR | P | 6717711 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | P | 09/03/2020 | observed fastening for exterior sheathing at walls - upper roof area / pending other rough inspections | BRIANB | BRIANB | | BSP | P | 6696216 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BIN | P | 07/20/2020 | wall insulation complete | BOBF | BOBF | | BIN | P | 6642491 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BIN | P | 07/17/2020 | insulation on west half of building starting from south end going north and stopping at vacuum room okay | BOBF | BOBF | | BIN | P | 6641245 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | P | 07/14/2020 | interior non bearing walls on north side of building okay pending completion of other required inspections | BOBF | BOBF | | BFR | P | 6636754 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BIN | P | 07/14/2020 | R-5 foil backed rigid at CMU walls per splice okay | BOBF | BOBF | | BIN | P | 6636752 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | P | 06/08/2020 | HEAD OF WALL INSPECTION / 1hr fire barrier wall / observed head of wall at 1hr fire barrier at office to wash tunnel and office to equipment room - see sheet A1.1 detail D3 / spoke with site superintendent about completing foundation - bond beam - structural steel - soils paper work / summary letter from RMG to follow | BRIANB | BRIANB | | BSP | P | 6597152 |
B & M CONSTRUCTION, INC. | E= | C | 01/20/2021 | | CRAIGS | CRAIGS | | E= | C | 6842484 |
B & M CONSTRUCTION, INC. | E= | P | 01/06/2021 | still need -- lock out tag out procedure and a letter from the engineer about the location of the disconnects in the tank ---- also need a plan splice for updated aic ratings of the roof top units | CRAIGS | CRAIGS | | E= | P | 6827534 |
B & M CONSTRUCTION, INC. | E= | P | 11/24/2020 | need lock out tag out procedures , corrected aic ratings for the roof tops and letter from engineer for disconnect location in the tanks uploaded to the permit | CRAIGS | CRAIGS | | E= | P | 6787630 |
B & M CONSTRUCTION, INC. | E= | P | 11/20/2020 | vac room OK---- vac stalls outside OK---- mech room still need to see roof drain heat trace --- outside light poles OK---- point of sales outside OK---
| CRAIGS | CRAIGS | | E= | P | 6784342 |
B & M CONSTRUCTION, INC. | E= | P | 11/18/2020 | equipment room ---need working clearance for a disconnect ---- k/o seal --- 4 sq blanks --- out side --- terminate equipment ground with the pole ground --- ground vac structure ---- mat wash OK---- pay canopy lighting OK--- tunnel --- partial list | CRAIGS | CRAIGS | | E= | P | 6781025 |
B & M CONSTRUCTION, INC. | ES | C | 09/18/2020 | Commercial Service: 1600 amp 4/w 480 volt --- OK to wire CT's and energize | CRAIGS | CRAIGS | | ES | C | 6711298 |
B & M CONSTRUCTION, INC. | ER | P | 09/14/2020 | office area above ceiling OK | CRAIGS | CRAIGS | | ER | P | 6704731 |
B & M CONSTRUCTION, INC. | ER | P | 09/04/2020 | south canopy ceiling lighting OK | CRAIGS | CRAIGS | | ER | P | 6697282 |
B & M CONSTRUCTION, INC. | ER | P | 08/14/2020 | stubs up out of the panels to be covered with osb ---OK | CRAIGS | CRAIGS | | ER | P | 6673493 |
B & M CONSTRUCTION, INC. | EUG | C | 08/14/2020 | south and west site lighting | CRAIGS | CRAIGS | | EUG | C | 6673487 |
B & M CONSTRUCTION, INC. | EUG | P | 08/12/2020 | 2 --- 1" pvc -- site lights OK | CRAIGS | CRAIGS | | EUG | P | 6670105 |
B & M CONSTRUCTION, INC. | ER | P | 08/06/2020 | west restroom hard lid OK | CRAIGS | CRAIGS | | ER | P | 6663345 |
B & M CONSTRUCTION, INC. | EUG | P | 07/29/2020 | North west side - 5-1" pvc for 25 vac lights and 2 pole lights / 2 - 1 1/2" for monument sign | BRETC | BRETC | | EUG | P | 6654345 |
B & M CONSTRUCTION, INC. | EUG | P | 07/23/2020 | secondaries from transformer to main disconnect at the building ---- told the contractor that CSU'S to look at , not mine . I was told CSU already passed it --- | CRAIGS | CRAIGS | | EUG | P | 6647756 |
B & M CONSTRUCTION, INC. | ER | P | 07/13/2020 | walls except north end --- went over plaques for conveyor motors in the pit | CRAIGS | CRAIGS | | ER | P | 6634932 |
B & M CONSTRUCTION, INC. | EUG | P | 06/05/2020 | Monument sign 3-1"pvc / The tunnel VFD - 15-1"pvc / POS Drive up canopy - 10-1"pvc | BRETC | BRETC | | EUG | P | 6595858 |
B & M CONSTRUCTION, INC. | ESL | P | 05/22/2020 | All pvc in managers office, Equipment room & lower section feeders in electrical rm / marked on plans 5/22 / | BRETC | BRETC | | ESL | P | 6580869 |
REEVES SPECIALTY SERVICES, INC. | H= | C | 01/06/2021 | MUA-1 AND EF-3 INTERLOCK CONFIRMED | MARKB | MARKB | | H= | C | 6827352 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 01/04/2021 | FINAL PENDING - Need to confirm interlock between MUA-1 and EF-3 TEST AND BALANCE REPORT AND ENGINEER LETTER FOR TUNNEL RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | P | 6823901 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 11/25/2020 | FINAL PENDING - Need to confirm interlock between MUA-1 & EF-3. Provide test and balance report. OTHER ITEMS ADDRESSED. INTERLOCKS CONFIRMED FOR EF-4 & EF-5 | MARKB | MARKB | | H= | P | 6789785 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 11/23/2020 | FINAL PENDING - Add second makeup air unit to permit scope. Need to confirm transfer fan and louver interlocks. Label all equipment. Install secondary condensate switch in RTU. Build RTU condensate trap per manufacturer instructions. Provide test and balance report. | MARKB | MARKB | | H= | P | 6786758 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 11/23/2020 | MAKEUP AIR UNIT 2 AND DUCT COMPLETE. | MARKB | MARKB | | HD | P | 6786757 |
REEVES SPECIALTY SERVICES, INC. | HV | C | 11/23/2020 | UNIT HEATERS AND VENTS COMPLETE | MARKB | MARKB | | HV | C | 6786756 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 10/30/2020 | CONTRACTORS MECHANICAL SCOPE COMPLETE. | MARKB | MARKB | | H= | C | 6759360 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | C | 10/30/2020 | INSPECTION ENTERED TO NOTIFY STATE INSPECTOR OF 3 NEW 400K BOILERS | MARKB | MARKB | | HWP | C | 6759359 |
FRONTIER MECHANICAL SYSTEMS INC | HV | C | 10/30/2020 | 3 BOILERS AND 3 BOILER VENTS COMPLETE PER MANUFACTURER INSTRUCTIONS. | MARKB | MARKB | | HV | C | 6759356 |
FRONTIER MECHANICAL SYSTEMS INC | H= | R | 10/09/2020 | CANNOT FINAL ANY MECHANICAL CONTRACTORS UNTIL ALL 3 BOILERS & ALL 3 BOILER VENTS ARE CLAIMED ON A MECHANICAL CONTRACTORS PERMIT SCOPE - will need to perform inspections on all boilers and boiler vents. Cannot bring plans up for this inspection. GAS PIPING COMPLETE. | MARKB | MARKB | | H= | R | 6735893 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 10/05/2020 | 3 PSI APPROVAL LETTER FROM CSU RECEIVED. 60 PSI PRESSURE TEST ON 3" PIPING ON ROOF AND PIPING PER PLAN SPLICE OK. MEDIUM PRESSURE STICKERS AND REGULATORS IN PLACE. STILL NEED - Test ports installed before and after regulators per plan. | MARKB | MARKB | | HI | C | 6729200 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 09/15/2020 | NEED TO LOWER THERMOSTAT TO 48" TO TOP OR INSTALL LOCK BOX NOTES: THIS INSPECTION WAS FOR THE FOLLOWING - ABOVE CEILING SA / RA / EXHAUST GRILLES AND FINAL CONNECTIONS OK IN THE FOLLOWING ROOMS - OFFICE - BREAK ROOM - RESTROOM - EXTERIOR REST ROOM | JERRYF | JERRYF | | HD | P | 6706804 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 08/06/2020 | ABOVE CEILING DUCT - SUPPLY/RETURN, MAINS/BRANCHES FOR RTU-1 INSTALLED PER PLAN OK TO WRAP. No flex or diffusers | MARKB | MARKB | | HD | P | 6664447 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 07/31/2020 | RELEASE 2 PSI METER | MARKB | MARKB | | HC | C | 6657490 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 07/29/2020 | CANNOT RELEASE METER UNTIL MECHANICAL "A" CONTRACTOR IS ATTACHED TO PERMIT 10 PSI PRESSURE TEST ON ALL MEDIUM PRESSURE PIPING FROM METER IN BUILDING CONNECTED TO POINT OF LAST INSPECTION OK. Still need piping on roof, labels, regulators and final equipment connections. | MARKB | MARKB | | HI | P | 6655051 |
FRONTIER MECHANICAL SYSTEMS INC | HI | L | 07/29/2020 | 30 min call ahead. Site locked at 5:40 | MARKB | MARKB | | HI | L | 6655049 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 07/23/2020 | ----NEED MECHANICAL CONTRACTORS ATTACHED TO PERMIT TO CLAIM: UNIT HEATERS, VENTS, MAKEUP AIR UNITS, RTU'S, DUCT AND EXHAUST---- 10 PSI PRESSURE TEST ON 1" LOW PRESSURE GAS PIPE BY BOILER LOCATION TO RH-1. PIPING PER PLAN | MARKB | MARKB | | HI | P | 6648578 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 10/21/2020 | corrections made | JOSEPHD | JOSEPHD | | P= | C | 6749344 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | C | 10/21/2020 | | JOSEPHD | JOSEPHD | | PRD | C | 6749325 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 10/21/2020 | | JOSEPHD | JOSEPHD | | PB | C | 6749320 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 10/02/2020 | need air gap at water heater t&p, breakroom sink to high, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6727523 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 10/01/2020 | plan splice for water heater, drinking fountain, and water entry done, note: 3" rp for domestic water, 3" rp for irrigation and process water installed | JOSEPHD | JOSEPHD | | PTO | C | 6726044 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 08/18/2020 | consultation, need plan splice for changes at backflow preventer layout | JOSEPHD | JOSEPHD | | PTO | P | 6676051 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 07/16/2020 | pressure test on water pipe ok, still need to see water entry completed | JOSEPHD | JOSEPHD | | PTO | P | 6639249 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 07/15/2020 | need to see water lines on test, need plan splice for relocation of water heater, type of water heater, and relocation of drinking fountain, need to see water entry area completed, and over head hot water insulation | JOSEPHD | JOSEPHD | | PTO | P | 6637741 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 07/09/2020 | roof drains ok, note: check over flow scuppers at final | JOSEPHD | JOSEPHD | | PRD | P | 6631751 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 07/09/2020 | dwv ok, still need to see water piping, | JOSEPHD | JOSEPHD | | PTO | P | 6631747 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 04/22/2020 | need sand & oil piping spliced into plumbing pages, looked at 2- 3" vent pipes run under foundation for sand & oil cover at own risk they were tested | JOSEPHD | JOSEPHD | | PB | P | 6547753 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 03/18/2020 | under ground ok | JOSEPHD | JOSEPHD | | PRD | P | 6514144 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 03/18/2020 | dwv ok, still need to see sand and oil installed and water entry | JOSEPHD | JOSEPHD | | PB | P | 6514142 |
B & M CONSTRUCTION, INC. | XES | T | 01/15/2021 | PAID (REC#1743210): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised per inspector's comments. | BERTHA | BERTHA | | XES | T | 6837440 |
B & M CONSTRUCTION, INC. | XES | T | 09/18/2020 | PAID (REC#1717434) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power, lighting and panels. | BERTHA | BERTHA | | XES | T | 6711344 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | T | 09/16/2020 | PAID (REC#1717432) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 8 revisions: Five sheets provided - PA1.1a adjusted slab, trench, and pit grading plan, P1.0 adjusted plumbing cover sheet, P1.1 adjusted plumbing details, P2.0 adjusted waste and vent plan, P3.0 adjusted plumbing plan | SHANEN | SHANEN | | XPS | T | 6707137 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 09/16/2020 | PAID (REC#1717432) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 1 | DALEH | DALEH | | XMS | T | 6706973 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XBS | T | 09/08/2020 | PAID (REC#1713069): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Adding mechanical platform; other minor revisions | LBENNETT | LBENNETT | | XBS | T | 6699549 |
B & M CONSTRUCTION, INC. | XES | T | 06/30/2020 | PAID (REC#1694347): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised supply conductors.( Belden cabel) | SHELBY | SHELBY | | XES | T | 6621521 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | T | 05/14/2020 | PAID (REC#1694350): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3, 4, 5, 6, 7 revisions: Adjusted car wash plans PA1.0a, PA1.0b, PA1.2a, PA1.4, PA1.5, PA5.4, PA7.1 | SHANEN | SHANEN | | XPS | T | 6571983 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XBS | T | 05/12/2020 | PAID (REC#1680265): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Moved drinking fountain, removed sump pit | LBENNETT | LBENNETT | | XBS | T | 6569072 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | T | 04/24/2020 | PAID (REC#1694351): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Pages added to plumbing plan for car wash equipment and reclaim system | SHANEN | SHANEN | | XPS | T | 6550626 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XBS | T | 12/09/2019 | PAID (REC#1675861): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised roof type and other minor changes | LBENNETT | LBENNETT | | XBS | T | 6420337 |