BRAD HORSLEY CONSTRUCTION, INC | B= | C | 09/30/2020 | Air leakage test and installers cert for blown in insulation on file | TRENTP | TRENTP | | B= | C | 6724006 |
BRAD HORSLEY CONSTRUCTION, INC | B= | P | 09/29/2020 | Still need to upload blown in insulation cert, inspector observed adeded insulation in attic, 18 inches / Need to upload results for air leakage test / Rest okay -- Schedule a new Building Final when above items are complete. | TRENTP | TRENTP | | B= | P | 6723084 |
BRAD HORSLEY CONSTRUCTION, INC | B= | P | 09/24/2020 | Missing code compliant address numbers on house / Need to seal penetrations in garage/dwelling common wall and ceiling / Please provide installers cert for blown in insulation in attic space, no rulers found, inspector measured 16 inches / Hole in stucco on side wall at rear deck between two electrical outlets / Finished basement, rear deck w/stairs, AC -- Schedule a new Building Final when above items are complete. UPDATE: TP 9/24/20 Need results from blower door/air leakage test | TRENTP | TRENTP | | B= | P | 6718591 |
BRAD HORSLEY CONSTRUCTION, INC | BLA | C | 04/23/2020 | | TRENTP | TRENTP | | BLA | C | 6549437 |
BRAD HORSLEY CONSTRUCTION, INC | BFR | C | 04/13/2020 | BFR corrections completed at time of insulation inspection. | CHUCK | CHUCK | | BFR | C | 6538361 |
BRAD HORSLEY CONSTRUCTION, INC | BIN | C | 04/10/2020 | | CHUCK | CHUCK | | BIN | C | 6537816 |
BRAD HORSLEY CONSTRUCTION, INC | BFR | P | 04/08/2020 | Still missing fireblocking at plate penetrations in basement bedroom and drop ceilings in basement - can verify at insulation inspection // Rest of frame corrections OK - corrected H11 truss paperwork on file. | CHUCK | CHUCK | | BFR | P | 6535079 |
BRAD HORSLEY CONSTRUCTION, INC | BFR | R | 04/07/2020 | Missing sill anchor bolts - rear garage, front left garage wall anchor to be installed at middle 1/3rd of plate, left garage wall at plate splice and basement bedroom rear wall / Missing shear nails at THJA hanger - CJ01 truss in Master Sitting Rm. / Missing fireblocking at low volt in Master Bedroom, top plate in basement bedroom and for Master tub drain / Clear combustibles from top of fireplace boxes / Missing 3rd 2x8 header and 2nd/3rd T at basement bathroom window / Tie basement walls together where interrupted by steel beam and glulam beams, room left of SGD / Missing 3-14 brace at H01 truss / Missing 4-11 braces at H08/H09 trusses / H11 truss profile doesn't match details on file // Rest of frame OK - finished basement. | CHUCK | CHUCK | | BFR | R | 6534136 |
BRAD HORSLEY CONSTRUCTION, INC | BSP | P | 01/09/2020 | All porch, deck and cover post connections OK. | CHUCK | CHUCK | | BSP | P | 6447873 |
BRAD HORSLEY CONSTRUCTION, INC | BSP | R | 01/08/2020 | One LPC and CS16 strap installed in lieu of pair of plan spec'd LPCs at front porch post / BC6 caps with CS16 straps and BC60 bases with CS16 straps installed in lieu of plan spec'd 2-ST18 straps at each post-beam/post-post connection, rear deck and cover / Missing 2-ST18 or 2-HTS16 straps, rear deck cover beams at exterior walls / Missing ledgerloks at right side of rear deck ledger / Front/rear porch lids, deck platform frame and garage portal frame OK. | CHUCK | CHUCK | | BSP | R | 6446809 |
BRAD HORSLEY CONSTRUCTION, INC | BFN | C | 12/05/2019 | Foundation design and foundation reinforcement with UFER observation received. | CHUCK | CHUCK | | BFN | C | 6418289 |
BRAD HORSLEY CONSTRUCTION, INC | BFT | C | 12/05/2019 | Soils report, open ex. and footing (including interior pads/piers and 3 of 5 deck pads/piers) observation received - 4000# basement/3000# garage (3000# design) / 5% / usable drain required. | CHUCK | CHUCK | | BFT | C | 6418288 |
BRAD HORSLEY CONSTRUCTION, INC | BFD | C | 12/05/2019 | Usable drain to sump pit and damp proofing OK / Engineer letter received for installation of EZ Drain system. | CHUCK | CHUCK | | BFD | C | 6418287 |
BRAD HORSLEY CONSTRUCTION, INC | BFI | C | 12/05/2019 | | CHUCK | CHUCK | | BFI | C | 6418284 |
BRAD HORSLEY CONSTRUCTION, INC | BFT | P | 11/11/2019 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFT | P | 6394542 |
BRAD HORSLEY CONSTRUCTION, INC | BFN | P | 11/11/2019 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFN | P | 6394541 |
SOUTHERN COLORADO ELECTRIC INC. | E= | C | 09/21/2020 | | TOMC | TOMC | | E= | C | 6712805 |
SOUTHERN COLORADO ELECTRIC INC. | E= | R | 09/17/2020 | NEED INTERSYSTEM BOND AT SERVICE ---- FIREPLACE AT MST BATH NEEDS GFCI --- NEED TO SEE JET TUB BONDING --- WALL OVEN NEEDS BREAKER LOCKS -- LOWER LEVEL HALL NEEDS SMOKE DETECTOR INSTALLED --- OUTLETS FOR GARAGE DOOR OPENERS NEEDS GFCI PROTECTION ALSO NEED TEST LIGHTS --- REST OK -- A/C #1- 20 AMP --- A/C #2 - 30 AMP ----- | GREGM | GREGM | | E= | R | 6709765 |
SOUTHERN COLORADO ELECTRIC INC. | ES | C | 03/27/2020 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 6524141 |
SOUTHERN COLORADO ELECTRIC INC. | ER | C | 03/25/2020 | ER OK ----- SUB PANEL IN BASEMENT 4/O ----- | GREGM | GREGM | | ER | C | 6521174 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | C | 09/17/2020 | | MICHAELM | MICHAELM | | H= | C | 6709994 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | P | 09/11/2020 | INSTALL EXHAUST FAN IN MAIN FLOOR BATHROOM ABOVE TOILET / PROVIDE FIRE PLACE INSTALLATION INSTRUCTIONS / SEAL INSULATION ON LINE SET IN MAIN MECHANICAL ROOM WHERE LINE SET ENTERS CEILING / INSTALL CONCENTRIC CAP ON / UNABLE TO LOCATE WHOLE HOUSE VENTILATION SWITCH / NOTE: FINISHED BASEMENT / OUTSIDE AIR WITH DAMPER TO FURNACE RETURN X2 / A/C COMPLETE X2 / 1 DIRECT VENT FURNACE / HIGH/LOW GRILLS INTO MECHANICAL ROOM / | MICHAELM | MICHAELM | | H= | P | 6703076 |
MILLER HEATING & AIR CONDITIONING, INC. | HRR | C | 03/30/2020 | Correction to previous HRR, there is a mechanical air and damper installed on the 60K furnace as well as the 80 K furnace. | MARK | MARK | | HRR | C | 6524641 |
MILLER HEATING & AIR CONDITIONING, INC. | HC | C | 03/27/2020 | RELEASE METER | MARK | MARK | | HC | C | 6524476 |
MILLER HEATING & AIR CONDITIONING, INC. | HRR | C | 03/27/2020 | All corrections made. Verify kitchen exhaust at final to match 400 cfm as stated at rough. There is no outside air for 60K furnace, not required with 400cfm hood. Damper is locater at the return for the 80K mechanical air, needs to be identified at final | MARK | MARK | | HRR | C | 6524469 |
MILLER HEATING & AIR CONDITIONING, INC. | HSP | C | 03/27/2020 | WATER HEATER VENT IS OK PER THE 2015 IRC SECTION 2427.6.8.2 / RANGE HOOD IS GOING TO BE 500CFM, BUILDER IS GOING TO LEAVE PAPERWORK ONSITE FOR INSPECTOR / MAKE-UP AIR ONLY REQUIRED IF RANGE HOOD EXCEEDS 800CFM / | MATTM | MATTM | | HSP | C | 6523340 |
MILLER HEATING & AIR CONDITIONING, INC. | HRR | P | 03/26/2020 | PLANS CALL FOR 1200CFM RANGE HOOD, BUILDER SAYS HOOD WILL BE 800CFM, WHERE IS THE MAKE-UP AIR? / 80K FURNACE 3 INCH VENT EXCEEDS LENGTH LIMITS, MANUFACTURE ALLOWS 70 FEET MAXIMUM, CURRENTLY AT 77 FEET / MISSING SECOND OUTSIDE AIR TO FURNACE RETURN FOR 60K FURNACE / OUTSIDE AIR TO FURNACE RETURN FOR 80K FURNACE CANNOT TERMINATE WITHIN 10 FEET OF FIREPLACE VENT AND NEEDS TO HAVE BACKDRAFT DAMPER INSTALLED / WATER HEATER 5 INCH COMMON VENT CANNOT EXCEED A HORIZONTAL LENGTH 7 1/2 FEET PER THE 2015 IRC SECTION G2428.3.5 / BATHROOM #4 EXHAUST IS INCOMPLETE / BATHROOM #2 AND #3 EXHAUST DUCTS EXCEED LENGTH LIMITS PER THE 2015 IRC TABLE M1506.2 / SEAL SUPPLY PLENUM BEHIND 80K FURNACE / WHOLE HOUSE VENTILATION ACHIEVED VIA DAMPERED OUTSIDE AIR TO EACH FURNACE RETURN / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL / NOTE / FINISHED BASEMENT / OUTSIDE AIR WITH DAMPER TO FURNACE RETURN / DIRECT VENT FURNACE / 2X A/C ROUGH, COIL AND LINESET / | MATTM | MATTM | | HRR | P | 6522780 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 03/09/2020 | 2 MAIN LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / BASEMENT FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / | CHADP | CHADP | | HV | C | 6504436 |
O.M.A.G.M., INC. | HI | C | 03/05/2020 | WILL NEED LETTER FROM GAS PURVEYOR FOR MEDIUM PRESSURE/ 10LB GOOD/3/4" MAIN/ 1 COOKTOP / 2 FURNACE / 3 FIREPLACE / 2 WATER HEATER / 1 BBQ / TOTAL BUT LOAD 421K MEDIUM PRESSURE/ | CHADP | CHADP | | HI | C | 6501571 |
WESTERN FIREPLACE SUPPLY, INC. | HV | P | 03/02/2020 | FRAMING IS NOT COMPLETE AROUND THE VENT IN THE MASTER BEDROOM/NO CORRECTIONS MADE/
| CHADP | CHADP | | HV | P | 6497197 |
WESTERN FIREPLACE SUPPLY, INC. | HV | P | 01/27/2020 | UPPER LEVEL FIREPLACE VENT IS NOT FRAMED IN/ BASEMENT FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / | CHADP | CHADP | | HV | P | 6465093 |
HOGAN MECHANICAL, INC. | P= | C | 09/16/2020 | Corrections made | MALYNDA | MALYNDA | | P= | C | 6708248 |
HOGAN MECHANICAL, INC. | P= | P | 09/11/2020 | Whirlpool pump access panel must be a minimum of 12x12", need to see high loop for dishwasher, rest ok (attach or send photos of corrections to 719-308-0509) Note: no irrigation | MALYNDA | MALYNDA | | P= | P | 6702843 |
HOGAN MECHANICAL, INC. | PWO | C | 03/27/2020 | Note: check water connection inside well pit at final | MALYNDA | MALYNDA | | PWO | C | 6523969 |
HOGAN MECHANICAL, INC. | PTO | C | 03/04/2020 | Corrections made | MALYNDA | MALYNDA | | PTO | C | 6499731 |
HOGAN MECHANICAL, INC. | PTO | P | 03/03/2020 | Hall lav lacks proper grade, need to see master tub p-trap installed, missing bocca plates on basement bar and lav water lines, rest ok Note: Finished basement (3 bathrooms), aav's at both master lavs and bar sink, tempering with access in hallway, no irrigation | MALYNDA | MALYNDA | | PTO | P | 6498617 |
HOGAN MECHANICAL, INC. | PB | C | 12/12/2019 | Correction made | MALYNDA | MALYNDA | | PB | C | 6425273 |
HOGAN MECHANICAL, INC. | PB | P | 12/11/2019 | Low test, rest ok, | MALYNDA | MALYNDA | | PB | P | 6424132 |