HAMMERS CONSTRUCTION, INC | B= | C | 07/24/2020 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 6649217 |
HAMMERS CONSTRUCTION, INC | B= | P | 07/09/2020 | Building final complete pending other finals // No return trip needed. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), ELECTRIC SERVICE OF COLORADO, LLC Electrical Final Inspection is not Completed yet, MARTINSON MECHANICAL, LLC Plumbing Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6631678 |
HAMMERS CONSTRUCTION, INC | BFI | C | 06/30/2020 | observation on file | NATHAN | NATHAN | | BFI | C | 6621690 |
HAMMERS CONSTRUCTION, INC | BFN | C | 06/30/2020 | | NATHAN | NATHAN | | BFN | C | 6621686 |
HAMMERS CONSTRUCTION, INC | BFT | C | 06/30/2020 | 3rd party observation letter for footer, foundation, open ex and compaction on file. | NATHAN | NATHAN | | BFT | C | 6621684 |
HAMMERS CONSTRUCTION, INC | BFR | P | 06/25/2020 | Framing of room 109, and walls for existing wall fur out with steel lintels per detail at CMU walls | NATHAN | NATHAN | | BFR | P | 6617435 |
HAMMERS CONSTRUCTION, INC | BFR | P | 06/22/2020 | attic reinforcement framing per approved splice | NATHAN | NATHAN | | BFR | P | 6612777 |
HAMMERS CONSTRUCTION, INC | BLA | C | 06/09/2020 | | NATHAN | NATHAN | | BLA | C | 6598679 |
HAMMERS CONSTRUCTION, INC | BLA | R | 06/08/2020 | not ready | NATHAN | NATHAN | | BLA | R | 6597371 |
HAMMERS CONSTRUCTION, INC | BSP | T | 06/05/2020 | PAID (REC#1686097): ADDITIONAL PLAN REVIEW TIME: $50 From: BPHILLIPS Revised areas, common path. | BPHILLIPS | BPHILLIPS | | BSP | T | 6595342 |
HAMMERS CONSTRUCTION, INC | BFR | P | 05/27/2020 | still need plan splice for interior non bearing layout, and existing roof frame reinforcement. | NATHAN | NATHAN | | BFR | P | 6585048 |
HAMMERS CONSTRUCTION, INC | BIN | C | 05/27/2020 | walls and roof okay, attic insulation corrected | NATHAN | NATHAN | | BIN | C | 6585046 |
HAMMERS CONSTRUCTION, INC | BFR | R | 05/22/2020 | Need all foundation paperwork and completed splice for interior non bearing wall configuration, add anchor bolts at plate breaks, discussed attic platforms not built high enough for insulation to be installed underneath, existing roof framing reinforcement not completed. complete all required inspections, Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | R | 6581211 |
HAMMERS CONSTRUCTION, INC | BFT | R | 01/07/2020 | need open hole report verify bearing capacity of soils, east foundation footer does not match plan and splice is approved foundation plan and splice is needed for stair change proposed. reinforcement and footer size on footer in place | NATHAN | NATHAN | | BFT | R | 6445775 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 07/24/2020 | #1 AL conductors installed to match one-line and 50A receptacle removed / | MIGUEL | MIGUEL | | E= | C | 6649216 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 07/23/2020 | plan splice needs to include #1 AL feeders replaced w/ #3 CU feeders at feeder #2 to Panel A and 14-50R receptacle if still installed / | MIGUEL | MIGUEL | | E= | P | 6647190 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 07/09/2020 | GFCI protect receptacle at water cooler / 30A WH ok / 40A A/C ok / add 14-50R with #8 MC cable feeders to splice / | MIGUEL | MIGUEL | | E= | P | 6631877 |
ELECTRIC SERVICE OF COLORADO, LLC | EP | C | 07/07/2020 | 100A sub panel A ok / #3 CU feeders / | MIGUEL | MIGUEL | | EP | C | 6628378 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 07/07/2020 | hook up WH / hook up exhaust fan in IT room / need thermostats with off position or breakers locks / hook up A/C, min 29, max 50 / panel sch in panel A / 3 way switches in main level / splice one-line to show change in feeders from plans to what was installed / | MIGUEL | MIGUEL | | E= | P | 6628371 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 07/06/2020 | 1st floor offices only / | MIGUEL | MIGUEL | | E= | P | 6626811 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 06/29/2020 | 2nd floor only / still need final connection of WH, 4500W #10s on 2nd floor / | MIGUEL | MIGUEL | | E= | P | 6620596 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | C | 06/29/2020 | remaining walls ok / | MIGUEL | MIGUEL | | ER | C | 6620591 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 05/22/2020 | 2nd floor complete / 1st floor new walls and lids ok / will need inspection on existing joining wall / | MIGUEL | MIGUEL | | ER | P | 6581479 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 05/15/2020 | upper level walls and hard lids except restroom lid , waiting on exhaust fan / | MIGUEL | MIGUEL | | ER | P | 6573962 |
ELECTRIC SERVICE OF COLORADO, LLC | ESL | C | 03/18/2020 | 1 1/2 PVC to exterior sub ok / 2 3/4 pvc to exterior ok / floor box and stub for interior wall ok / | MIGUEL | MIGUEL | | ESL | C | 6514171 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 07/16/2020 | PICTURE OF SERVICE PLATFORM RECEIVED | JERRYF | JERRYF | | H= | C | 6638968 |
PEAK HEATING & AIR CONDITIONING, INC. | HSP | P | 07/15/2020 | PICTURE OF EXHAUST FAN RECEIVED - STILL NEED TAB REPORT AND PICTURES OF COMPLETED SERVICE PLATFORM AT FURNACE PER PREVIOUS NOTES AND EXHAUST TERMINATION AT FAN | JERRYF | JERRYF | | HSP | P | 6637516 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 07/15/2020 | PICTURES OF TRANSFER GRILLES RECEIVED | JERRYF | JERRYF | | H= | P | 6637515 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 07/14/2020 | TAB REPORT RECEIVED - STILL NEED OTHER ITEMS ADDRESSED FROM PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 6635781 |
MARTINSON MECHANICAL, INC | H= | C | 07/08/2020 | | JERRYF | JERRYF | | H= | C | 6631107 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 07/08/2020 | PARTIAL FINAL PENDING THE FOLLOWING - TAB REPORT - COMPLETE ACCESS PLATFORM FROM ACCESS HATCH TO FURNACE IN ATTIC - NEED TRANSFER AIR PATH AT ALL 2ND FLOOR OFFICES PER PLAN - EXHAUST FAN IN 1ST FLOOR IT ROOM | JERRYF | JERRYF | | H= | P | 6631037 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/02/2020 | PLAN SPLICE FOR BEETLE ROOM OK AT FUTURE INSPECTION NEED TO INSPECT ATTIC WHEN READY | JERRYF | JERRYF | | HD | P | 6590036 |
MARTINSON MECHANICAL, INC | HC | C | 06/01/2020 | RELEASE METER | JERRYF | JERRYF | | HC | C | 6589139 |
MARTINSON MECHANICAL, INC | HI | C | 06/01/2020 | TIFF TEST OK - ALL PIPING OK - BY FINAL NEED REVISED PLAN TO MATCH INSTALLED | JERRYF | JERRYF | | HI | C | 6589111 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 05/28/2020 | NEED THE FOLLOWING - PLAN REVISION TO MATCH INSTALLED CONTRACTOR PROCEEDING AT OWN RISK - REMOVE PTAC FROM PERMIT AND PLANS - ADD EXHAUST FAN AND INTAKE AIR TO PERMIT IN PLACE OF PTAC UNIT - ALL ATTIC WORK NOTES: 1ST AND 2ND FLOOR FLOOR SA / RA MAINS / RUN OUTS AND EXHAUST OK | JERRYF | JERRYF | | HD | P | 6585680 |
MARTINSON MECHANICAL, INC | HI | P | 05/26/2020 | NEED PLAN REVISION TO MATCH RELOCATED METER LOCATION AND PIPING - NEED TIFF TEST ON PIPING AT OLD METER LOCATION NOTES: PRESSURE TEST OK AND PIPING OK FROM NEW FURNACE TO NEW METER LOCATION | JERRYF | JERRYF | | HI | P | 6583024 |
MARTINSON MECHANICAL, INC | P= | C | 07/16/2020 | alternate method and materials in images, enclosed 2 truss bays and combined w/ furnace (conditioned space) | JOHNS | JOHNS | | P= | C | 6639416 |
MARTINSON MECHANICAL, INC | P= | P | 07/08/2020 | Need Alternate Method and Material for Low drinking fountain with bottle filler. Need conditioned space in attic for Water heater and piping. | SAMH | SAMH | | P= | P | 6630528 |
MARTINSON MECHANICAL, INC | PTO | C | 05/26/2020 | Check Water heater at final. | SAMH | SAMH | | PTO | C | 6583447 |
MARTINSON MECHANICAL, INC | PB | C | 03/13/2020 | | SAMH | SAMH | | PB | C | 6510548 |
MARTINSON MECHANICAL, INC | PB | P | 03/04/2020 | Tie in and stub out to addition ok. | SAMH | SAMH | | PB | P | 6499936 |
ELECTRIC SERVICE OF COLORADO, LLC | XES | T | 07/21/2020 | PAID (REC#1697851): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Removed generator from scope. | BERTHA | BERTHA | | XES | T | 6645226 |
ELECTRIC SERVICE OF COLORADO, LLC | XES | T | 07/15/2020 | PAID (REC#1695938): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised light fixture WP. | BERTHA | BERTHA | | XES | T | 6637719 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 07/13/2020 | PAID (REC#1695570): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: okay new splice added TGs | TCRIPPEN | TCRIPPEN | | XMS | T | 6635550 |
HAMMERS CONSTRUCTION, INC | XBS | T | 06/11/2020 | PAID (REC#1687505): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided framing details. | BPHILLIPS | BPHILLIPS | | XBS | T | 6600510 |
MARTINSON MECHANICAL, INC | XMS | T | 06/04/2020 | PAID (REC#1687506): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Revise gas piping and relocate gas meter. | TCRIPPEN | TCRIPPEN | | XMS | T | 6593496 |
ELECTRIC SERVICE OF COLORADO, LLC | XES | P | 06/01/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised for background change. | BERTHA | BERTHA | | XES | P | 6588351 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 05/29/2020 | PAID (REC#1684501): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: okay new splice redesign and reroute ducts added exhaust fan, adjusted schedules only clouded changes are reviewed and approved | TCRIPPEN | TCRIPPEN | | XMS | T | 6587942 |
MARTINSON MECHANICAL, INC | XPS | T | 04/09/2020 | PAID (REC#1672768): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 4/9/20: Delta 4 revisions: P0.1 adjusted fixture schedule and water pipe size analysis, P1.1 revised first and second floor plumbing plan | SHANEN | SHANEN | | XPS | T | 6535732 |
ELECTRIC SERVICE OF COLORADO, LLC | XES | T | 04/08/2020 | PAID (REC#1672770): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised IT room lighting | BERTHA | BERTHA | | XES | T | 6535549 |
HAMMERS CONSTRUCTION, INC | XBS | T | 04/08/2020 | PAID (REC#1672766): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor layout and structural revisions | MICHAELA | MICHAELA | | XBS | T | 6534794 |
HAMMERS CONSTRUCTION, INC | XPS | P | 02/25/2020 | PLAN SPLICE FEE: $0 by: SHANEN for Plumbing: 2/25/20: Delta 3 revisions: P0.1 adjusted fixture schedule and analysis, P1.1 adjusted plumbing floor plan | SHANEN | SHANEN | | XPS | P | 6491969 |
HAMMERS CONSTRUCTION, INC | XBS | T | 02/24/2020 | PAID (REC#1664391) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise layout - add features | MICHAELA | MICHAELA | | XBS | T | 6490910 |