THOMAS GENERAL CONTRACTORS, INC. | B= | C | 08/26/2020 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6686108 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 08/21/2020 | all items corrected. Additional Inspections Required (computer generated): GRANT DRUMMOND II Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6682159 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 08/21/2020 | letter of correspondence between Plan review and design professional on file for acceptance of upstairs restroom configuration. Additional Inspections Required (computer generated): GRANT DRUMMOND II Mechanical Final Inspection is not Completed yet, GRANT DRUMMOND II Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6680706 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 08/18/2020 | upstairs restrooms now gender neutral accessible and non instead of both being accessible need coat hook at accessible toilet compartments per required reach ranges at main floor. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): GRANT DRUMMOND II Mechanical Final Inspection is not Completed yet, GRANT DRUMMOND II Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6676646 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 07/13/2020 | need restrooms completed for grab bars, mirrors, and coat hooks, ambulatory toilet need horizontal bars and no more than 19" to center of toilet, complete installation of doors at exterior rear and approval for egress door behind bar. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): DILLER ELECTRIC Electrical Final Inspection is not Completed yet, ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet, GRANT DRUMMOND II Mechanical Final Inspection is not Completed yet, GRANT DRUMMOND II Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6634846 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | C | 06/25/2020 | Structural steel and weld observation on file | NATHAN | NATHAN | | BFR | C | 6616965 |
THOMAS GENERAL CONTRACTORS, INC. | BFT | C | 06/25/2020 | openex and compaction summary with 2500 psf soils specified. footer and pad observation on file | NATHAN | NATHAN | | BFT | C | 6616951 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 06/16/2020 | Headroom corrected at landing to 2nd floor | NATHAN | NATHAN | | BFR | P | 6606408 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 06/11/2020 | mechanical room wall okay with completed required inspections | NATHAN | NATHAN | | BFR | P | 6601026 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 06/04/2020 | 2nd layer drywall at stairs okay. | NATHAN | NATHAN | | BFR | P | 6593547 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 06/02/2020 | 2nd floor 1st layer drywall at fire wall rear stair penthouse and door frame in fill by restrooms. | NATHAN | NATHAN | | BFR | P | 6590564 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/29/2020 | Mezzanine frame of bathrooms only with approved required inspections / Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6587641 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/18/2020 | West stair penthouse insulation okay 2nd layer drywall at 2nd floor completed . | NATHAN | NATHAN | | BFR | P | 6575467 |
THOMAS GENERAL CONTRACTORS, INC. | BIN | C | 05/15/2020 | | NATHAN | NATHAN | | BIN | C | 6573086 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/15/2020 | Firewall infill at 2 window openings south side of south wall okay, Headroom issue at stairs from mezzanine/landing to 2nd floor steel. | NATHAN | NATHAN | | BFR | P | 6573078 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/14/2020 | drywall 1st layer interior 2nd floor okay, rear stair tower not ready. | NATHAN | NATHAN | | BFR | P | 6571649 |
THOMAS GENERAL CONTRACTORS, INC. | BIN | P | 05/04/2020 | east side 2nd floor insulation okay | NATHAN | NATHAN | | BIN | P | 6560464 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 04/30/2020 | provide documentation for 2 upper windows in filled with 1 layer of brick for the 2 hr requirement. | NATHAN | NATHAN | | BFR | P | 6556927 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 01/31/2020 | Restroom framing 1st floor okay with completed required inspections, Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6470992 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 01/21/2020 | rooftop bar walls only inspected ok/need decks-stairs etc. | BERTW | BERTW | | BFR | P | 6458345 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 12/16/2019 | 2nd layer drywall at upper inside parapet walls okay | NATHAN | NATHAN | | BFR | P | 6428780 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 12/13/2019 | frame of upper roof top walls with completed required inspections okay. Firestop at roof line okay and interior side of exterior walls prerock in roof line 1st layer okay | NATHAN | NATHAN | | BFR | P | 6426931 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 12/10/2019 | exterior walls need plans to match for 2 hr rated wall on north side of east stairs, 2nd layer on all exterior sides attached per U301 | NATHAN | NATHAN | | BFR | P | 6422842 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 12/06/2019 | 2nd floor 1st layer drywall per U301 at exterior side stair walls and 10' south wall, NEED further review of rated walls at 2nd floor for property line issue, EDIT 12-9-2019 on further review exterior 2nd floor north wall property line issue needs addressed correctly on plans for 2 hr wall. | NATHAN | NATHAN | | BSP | P | 6419054 |
DILLER ELECTRIC LLC | E= | C | 08/25/2020 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6684715 |
DILLER ELECTRIC LLC | E= | C | 08/13/2020 | | BRIAN | BRIAN | | E= | C | 6671458 |
DILLER ELECTRIC LLC | E= | C | 08/04/2020 | | BRIAN | BRIAN | | E= | C | 6660191 |
DILLER ELECTRIC LLC | E= | P | 07/31/2020 | gfci cb in womens bath rm,up high/ did not look at elevator/ | JOHNN | JOHNN | | E= | P | 6657462 |
DILLER ELECTRIC LLC | E= | P | 07/07/2020 | em lighting up and going/ | BRIAN | BRIAN | | E= | P | 6628425 |
DILLER ELECTRIC LLC | ER | P | 06/12/2020 | panel wall ok/ | BRIAN | BRIAN | | ER | P | 6603315 |
DILLER ELECTRIC LLC | ER | P | 06/10/2020 | elect room wall ---ok 9 | BRIAN | BRIAN | | ER | P | 6599361 |
DILLER ELECTRIC LLC | E= | R | 06/09/2020 | need lights in elect room / need exits and em ligjhts / | BRIAN | BRIAN | | E= | R | 6598169 |
DILLER ELECTRIC LLC | ER | C | 05/19/2020 | demising wall -- | BRIAN | BRIAN | | ER | C | 6576414 |
DILLER ELECTRIC LLC | ER | P | 04/28/2020 | upstairs bath rooms on east side /--ok | BRIAN | BRIAN | | ER | P | 6553748 |
DILLER ELECTRIC LLC | EUG | C | 04/13/2020 | rest of slab--ok | BRIAN | BRIAN | | EUG | C | 6538558 |
DILLER ELECTRIC LLC | ES | P | 04/10/2020 | Commercial Service: prerelease for suit 100 and 110---ok for contractor so schedule with csu / 110=1200 amp 4-w suit 100=400 amp 4-w --ok / | BRIAN | BRIAN | | ES | P | 6537306 |
DILLER ELECTRIC LLC | ER | R | 03/25/2020 | this permit is for the core and shell need to attach to the TI permit for this work / ---under ground ok when the correct permit is pulled and called for inspection / | BRIAN | BRIAN | | ER | R | 6520632 |
DILLER ELECTRIC LLC | ESL | P | 03/16/2020 | panel stubs and power to the columns ---ok / | BRIAN | BRIAN | | ESL | P | 6511378 |
DILLER ELECTRIC LLC | ER | P | 03/16/2020 | bathrooms upstairs--ok ---note need to comply with accessible heights on final / | BRIAN | BRIAN | | ER | P | 6511375 |
DILLER ELECTRIC LLC | ES | P | 02/12/2020 | Commercial Service: 1600 amp 4-w --ok up to mdp / ------- need to coordinate with csu to mount the ct meter cans / | BRIAN | BRIAN | | ES | P | 6480052 |
DILLER ELECTRIC LLC | ER | P | 01/22/2020 | bathroom walls --ok | BRIAN | BRIAN | | ER | P | 6460002 |
DILLER ELECTRIC LLC | EUG | C | 01/09/2020 | rest of the panel feeders --ok | BRIAN | BRIAN | | EUG | C | 6447676 |
DILLER ELECTRIC LLC | EUG | P | 12/19/2019 | from elect room out to mdp / --ok | BRIAN | BRIAN | | EUG | P | 6432319 |
DILLER ELECTRIC LLC | ESL | P | 12/06/2019 | panel feeder conduits ---see plans -/ | BRIAN | BRIAN | | ESL | P | 6418683 |
DRUMMOND PLUMBING LLC | H= | C | 08/21/2020 | | JERRYF | JERRYF | | H= | C | 6681658 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 07/31/2020 | SHELL COMPLETE PATIO HEATERS ARE UNDER PERMITM76583 | BENH | BENH | | H= | C | 6657200 |
DRUMMOND PLUMBING LLC | HSP | P | 07/13/2020 | NEED SOMEONE TO CLAIM PATIO HEATERS ON ROOF AND CALL INSPECTIONS - WILL NEED INSTALL MANUAL FOR HEATERS AT TIME OF INSPECTION - APPEARS GAS FLEX CONNECTORS ARE INSTALLED INCORRECTLY | JERRYF | JERRYF | | HSP | P | 6634980 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 07/08/2020 | PARTIAL PENDING THERMOSTATS NOTES: ALL OTHER WORK OK | JERRYF | JERRYF | | H= | P | 6630844 |
DRUMMOND PLUMBING LLC | HC | C | 06/17/2020 | OK TO RELEASE #2 METER | JERRYF | JERRYF | | HC | C | 6607035 |
DRUMMOND PLUMBING LLC | HI | C | 06/17/2020 | BY FINAL NEED 2# APPROVAL LETTER - NEED TO VERIFY REGULATORS AND LABELS - CORRECT PERMIT WORK SCOPE | JERRYF | JERRYF | | HI | C | 6607032 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 05/27/2020 | SECOND FLOOR RESTROOM EXHAUST AT HARD LID OK | JERRYF | JERRYF | | HD | P | 6584607 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 05/07/2020 | DAMPER GAP OK - VERIFY RETAINAGE AT FUTURE INSPECTION | JERRYF | JERRYF | | HD | P | 6564497 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | R | 05/05/2020 | NEED PROPER GAP AT F/SD OPENING PER INSTALL MANUAL - STOPPED INSPECTION | JERRYF | JERRYF | | HD | R | 6561013 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 05/04/2020 | NEED STAMPED APPROVED REVISED PLAN DELETING RTU2B - NEED PLAN REVISED FOR HOOD WALL FOR 18" CLEARANCE HOOD / PLAN SHOWS PLYWOOD INSIDE WALL NOTES: FRAMED OPENING IN MASONRY WALL OK - INSPECTION IS CALLED FOR 5 / 5 TO VERIFY DAMPER GAP | JERRYF | JERRYF | | HD | P | 6559623 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HSP | P | 04/23/2020 | HAD CONSULT ON HOOD WALL CONSTRUCTION FOR FUTURE SPACE AT 516 TEJON (CONTRACTOR WANTED TO VERIFY WALL CONSTRUCTION) - HOOD WALL OK FOR ZERO CLEARANCE HOOD PENDING APPROVED PLANS - CONTRACTOR PROCEEDING AT OWN RISK PENDING APPROVED PLANS THIS MAY CHANGE HOOD WALL REQUIREMENTS | JERRYF | JERRYF | | HSP | P | 6549750 |
DRUMMOND PLUMBING LLC | HI | P | 04/10/2020 | NEED MECHANICAL CONTRACTOR ATTACHED ASAP - NEED TO ADD ALL STUBS TO PERMIT WORK SCOPE CURRENTLY SHOWS 11 STUBS - NEED ALL OPEN LINES CAPPED OR CONNECTED BEFORE METER RELEASE NOTES: PRESSURE TEST OK AND PIPING PER PLAN | JERRYF | JERRYF | | HI | P | 6537818 |
DRUMMOND PLUMBING LLC | P= | C | 08/26/2020 | | SAMH | SAMH | | P= | C | 6686107 |
DRUMMOND PLUMBING LLC | PTO | C | 08/26/2020 | Splice approved. | SAMH | SAMH | | PTO | C | 6686093 |
DRUMMOND PLUMBING LLC | PB | C | 08/26/2020 | Splice approved. | SAMH | SAMH | | PB | C | 6686092 |
DRUMMOND PLUMBING LLC | P= | P | 08/04/2020 | Need plan splices from previous inspections. Lacking Wheelchair clearance at upper level left side Accessible Restroom. | SAMH | SAMH | | P= | P | 6660416 |
DRUMMOND PLUMBING LLC | P= | P | 07/10/2020 | Lower level Public Restrooms complete. | SAMH | SAMH | | P= | P | 6633915 |
DRUMMOND PLUMBING LLC | PTO | P | 06/18/2020 | Need plan splice for floor sink at walk in cooler. | SAMH | SAMH | | PTO | P | 6609144 |
DRUMMOND PLUMBING LLC | PTO | P | 03/17/2020 | Upper level restrooms complete. Verify insulation at final. | SAMH | SAMH | | PTO | P | 6513116 |
DRUMMOND PLUMBING LLC | PB | P | 02/20/2020 | GW at Center south wall area. Need Plan splice, or Engineers letter for Floor sinks in lieu of Trench drains. Cover at own risk. Pending all underground Plan splices. | SAMH | SAMH | | PB | P | 6487542 |
DRUMMOND PLUMBING LLC | PTO | P | 02/18/2020 | ok for in wall dwv only @ uppr baths | JOHNS | JOHNS | | PTO | P | 6484447 |
DRUMMOND PLUMBING LLC | PB | P | 02/18/2020 | ok for g.w. @ main level north east side and g.w @ center kitchen
ok for s.s. for uppr baths | JOHNS | JOHNS | | PB | P | 6484446 |
DRUMMOND PLUMBING LLC | PB | P | 02/12/2020 | revise plans to show cwv @ all floor drains and floor sinks in bars
NEED to update scope of work by final
ok for west side (splice) only. NOTE: waters looped underground
still need remainder of PB | JOHNS | JOHNS | | PB | P | 6479967 |
DRUMMOND PLUMBING LLC | PTO | P | 01/24/2020 | ok for in wall dwv and h20 @ main bath rooms core walls only, @ next inspection show inspector flanges secured | JOHNS | JOHNS | | PTO | P | 6463097 |
DRUMMOND PLUMBING LLC | PTO | P | 12/11/2019 | ok for urinal vents, urinal waters, and water closet water in block walls | JOHNS | JOHNS | | PTO | P | 6423544 |
DRUMMOND PLUMBING LLC | PTO | P | 12/10/2019 | for dwv only 4 urinal and 1 toilet vent in block wall bottom 4' ok | JOSEPHD | JOSEPHD | | PTO | P | 6421953 |
DRUMMOND PLUMBING LLC | PB | P | 11/20/2019 | dwv and grease does not match plans will need plan splice for changes cover at own risk, dwv and grease tested, still need to see water lines under floor, connection for grease from streetcar's old grease waste, still need to see stub for upstairs bathroom near streetcar's door | JOSEPHD | JOSEPHD | | PB | P | 6405077 |
DRUMMOND PLUMBING LLC | XPS | T | 08/20/2020 | PAID (REC#1706525): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: P1.1 adjusted main floor plumbing plan | SHANEN | SHANEN | | XPS | T | 6680641 |
THOMAS GENERAL CONTRACTORS, INC. | XBS | T | 05/11/2020 | PAID (REC#1680304): PLAN SPLICE FEE: $50 by: DANM for Construction: Various structural revisions including addition of canopies on front of building | DANM | DANM | | XBS | T | 6566823 |
DILLER ELECTRIC LLC | XES | T | 04/04/2020 | PAID (REC#1672729): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line | SHELBY | SHELBY | | XES | T | 6531482 |
DILLER ELECTRIC LLC | XES | P | 04/02/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Re-approved for return to shell. | BERTHA | BERTHA | | XES | P | 6530363 |
DRUMMOND PLUMBING LLC | XMS | T | 04/02/2020 | PAID (REC#1672949): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Gas and schedule revisions | JUSTINC | JUSTINC | | XMS | T | 6530092 |
DRUMMOND PLUMBING LLC | XPS | T | 04/02/2020 | PAID (REC#1672950): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 4/2/20: Delta 1 revisions P0.1 added back-flow preventer schedule, P1.1 revised page for main floor plumbing plan, P1.2 revised second floor plumbing plan, P1.3 revised roof plumbing plan | SHANEN | SHANEN | | XPS | T | 6530063 |
DILLER ELECTRIC LLC | XES | T | 01/22/2020 | PAID (REC#1657913): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Return to shell | BERTHA | BERTHA | | XES | T | 6460186 |
DRUMMOND PLUMBING LLC | XMS | T | 01/16/2020 | PAID (REC#1657915): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: New splice pages removed isometrics added isometrics, changed gas pipe sizes added gas pipe see plans for rest, | TCRIPPEN | TCRIPPEN | | XMS | T | 6455916 |
DRUMMOND PLUMBING LLC | XPS | T | 12/19/2019 | PAID (REC#1657916): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 12/19/19: Delta 1 revisions P0.1 added back-flow preventer schedule, P1.1 revised page for main floor plumbing plan, P1.2 revised second floor plumbing plan, P1.3 revised roof plumbing plan | SHANEN | SHANEN | | XPS | T | 6432996 |