CRAIG MASER | B= | C | 06/11/2020 | address posted | NATHAN | NATHAN | | B= | C | 6600651 |
CRAIG MASER | B= | P | 06/10/2020 | need 5" tall address # installed on home, image will work for reinspection. -- Schedule a new Building Final when above items are complete. | NATHAN | NATHAN | | B= | P | 6599532 |
CRAIG MASER | B= | P | 01/29/2020 | post address, need siding at end walls installed, front and side deck first step rise over 3/8" difference from remaining, side deck handrail top and bottom must be between 34" -38" above nosing of stairs, over 4" gap at pickets and on side of stairs next to home also at side stairs. -- Schedule a new Building Final when above items are complete. | NATHAN | NATHAN | | B= | P | 6467651 |
CRAIG MASER | BTD | C | 01/15/2020 | marriage line completed at roof . serial #233-000-H-A001295AB, STATE INSIGNIA 2019-3132 | NATHAN | NATHAN | | BTD | C | 6453777 |
CRAIG MASER | BTD | R | 01/14/2020 | still cannot verify marriage line connection at roof, end wall, floor and pier blocking connections completed, stair handrail guardrail and rise do not work for code and must be corrected by final. | NATHAN | NATHAN | | BTD | R | 6452434 |
CRAIG MASER | BTD | R | 01/08/2020 | Training with Nathan | ASHLEYB | ASHLEYB | | BTD | R | 6447320 |
CRAIG MASER | BTD | R | 01/08/2020 | training with Ashley B, need shims opposing each other and tight under beam at all piers, remove skirting until tie down is completed, Marriage line piers not in contact with frame, end wall, roof and interior marriage line connections not completed or covered without inspection, 16" oc at walls 4" wood screws and 24" 3/8" lags at roof connection, post address, | NATHAN | NATHAN | | BTD | R | 6447313 |
CRAIG MASER | BVM | C | 01/08/2020 | Serial number - 233-000-H-A010295AB - Training with Nathan - Reviewed elements of BTD including piers, marriage line connections and required verifications | ASHLEYB | ASHLEYB | | BVM | C | 6447312 |
BLUE MULE ELECTRIC | E= | C | 01/06/2020 | no ac / | BRIAN | BRIAN | | E= | C | 6444690 |
BLUE MULE ELECTRIC | EUG | C | 12/30/2019 | 2" PVC from pedestal to home ok / | MIGUEL | MIGUEL | | EUG | C | 6439453 |
BLUE MULE ELECTRIC | E= | R | 12/30/2019 | need access to home to inspect sub panel / | MIGUEL | MIGUEL | | E= | R | 6439444 |
BLUE MULE ELECTRIC | ES | C | 12/30/2019 | Mobile Home Meter Set: 200A 3w pedestal ok to set meter / | MIGUEL | MIGUEL | | ES | C | 6439442 |
BLUE MULE ELECTRIC | ES | R | 12/09/2019 | not ready / must be ready on next inspection or pay trip fee / home not set / | BRIAN | BRIAN | | ES | R | 6421523 |
CRAIG MASER | HO= | C | 01/07/2020 | 10LB TEST OK 3/4 INCH MAIN 1 FURNACE 1 WATER HEATER NOTES: 4" OUTSIDE AIR TO FURNACE RETURN, MANUFACTURED HOME DIRECT VENT FURNACE, MANUFACTURED HOME DIRECT VENT WATER HEATER, NO A/C | MATTM | MATTM | | HO= | C | 6445851 |
CRAIG MASER | PO= | C | 01/28/2020 | | JOHNS | JOHNS | | PO= | C | 6465980 |
CRAIG MASER | PO= | P | 01/27/2020 | need wye combo @ 3" tie in out side of skirting, rest ok | JOHNS | JOHNS | | PO= | P | 6465152 |
CRAIG MASER | PO= | L | 01/22/2020 | Field cancel by Craig. | DANR | DANR | | PO= | L | 6459827 |
CRAIG MASER | PO= | P | 01/21/2020 | leaks under trailer, cant use threaded plug for drain tie in @ east side 3",need wye combo @ 3x1 1/"2 under trailer, need slope @ 3" drain under trailer, need slope @ water htr pan drain piping under trailer, rest ok. NOTE: heat trace installed, manufactured home water htr | JOHNS | JOHNS | | PO= | P | 6457935 |
CRAIG MASER | XBS | P | 01/07/2020 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: revised pier design | SHELLEY | SHELLEY | | XBS | P | 6445239 |
CRAIG MASER | XBS | T | 12/19/2019 | PAID (REC#1651469) PLAN SPLICE FEE: $50 by: DANM for Construction: Revise steel piers to cmu block and change some pad sizes and materials | DANM | DANM | | XBS | T | 6432262 |