DUSTON CONSTRUCTION INC | B= | C | 10/14/2020 | | BERTW | BERTW | | B= | C | 6740835 |
DUSTON CONSTRUCTION INC | BE | T | 09/22/2020 | PAID (REC#1715476) tco | JANE | JANE | | BE | T | 6715133 |
DUSTON CONSTRUCTION INC | B= | P | 09/22/2020 | Temp CO: TCO extension ( Expires: 10/22/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6715124 |
DUSTON CONSTRUCTION INC | BE | T | 08/25/2020 | PAID (REC#1707340) tco | JANE | JANE | | BE | T | 6684266 |
DUSTON CONSTRUCTION INC | B= | P | 08/25/2020 | Temp CO: extension ( Expires: 9/24/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6684265 |
DUSTON CONSTRUCTION INC | B= | P | 06/15/2020 | Temp CO: Pending building final ( Expires: 7/15/2020 12:00:00 AM) | RITA | RITA | | B= | P | 6604916 |
DUSTON CONSTRUCTION INC | B= | P | 06/05/2020 | pending approved plan splice for wall layout modifications at rear exit and deletion of overhead door - see BSP inspection dated 9MAR20 / need to complete other final inspections / building okay - no return trip required -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, GRINGO DAVE'S ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6595590 |
DUSTON CONSTRUCTION INC | BSP | P | 03/09/2020 | letter for framing modifications received at office / still need to revise design to match as built condition - to reflect deletion and modification of demising wall at rear of building - deletion of walls at future door location and installation of 3070 doors in lieu of the glass overhead door | BRIANB | BRIANB | | BSP | P | 6503759 |
DUSTON CONSTRUCTION INC | BFR | P | 03/05/2020 | need to revise design to match as built condition - to reflect deletion and modification of demising wall at rear of building - deletion of walls at future door location / still need to inspect low walls at service and dining area / wall type B at rear service area, rest rooms and at wall door 107 do not extend to roof deck as shown on the approved design / missing hard lid framing details on design - still need to inspect hard lid framing / reviewed accessible elements with site rep / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6502149 |
GRINGO DAVE'S ELECTRIC, INC. | E= | C | 06/15/2020 | Correction complete / | ROB | ROB | | E= | C | 6603835 |
GRINGO DAVE'S ELECTRIC, INC. | E= | P | 06/02/2020 | Need to verify panel AIC rating / All else complete / | ROB | ROB | | E= | P | 6590558 |
GRINGO DAVE'S ELECTRIC, INC. | E= | P | 06/01/2020 | Need lockouts for oven breakers / Need GFCI protection for audio recpt. / Need to check cooler and roof equipment /need to check panel / | ROB | ROB | | E= | P | 6588922 |
GRINGO DAVE'S ELECTRIC, INC. | ER | P | 04/23/2020 | Rough for grid ceiling ok / | ROB | ROB | | ER | P | 6550070 |
GRINGO DAVE'S ELECTRIC, INC. | ER | P | 03/04/2020 | Rough ok for hard lids, walls, dining area open area ceiling / Need listed ceiling fan box in dining area / | ROB | ROB | | ER | P | 6499779 |
GRINGO DAVE'S ELECTRIC, INC. | ER | P | 01/08/2020 | Rough ok for 3 exterior walls / Discussed accessibility requirements with contractor / Discussed GFCI protection in kitchen area with contracor / | ROB | ROB | | ER | P | 6446734 |
MICK HEATING & SHEET METAL CO. | H= | C | 05/13/2020 | Mechanical final ok. Test and balance report received, see images. / | MARKB | MARKB | | H= | C | 6569700 |
MICK HEATING & SHEET METAL CO. | H= | P | 05/12/2020 | Mechanical final ok pending receipt of test and balance report / OTHER ITEMS ADDRESSED | MARKB | MARKB | | H= | P | 6569175 |
MICK HEATING & SHEET METAL CO. | HD | P | 04/28/2020 | FOR FINAL - Need KEF-1 and RTU-2 inter locked. Install back draft damper for KEF-1. Fasten KEF-1 fan to curb. Install thermostat lock boxes and CO2 sensor for RTU-1. Complete condensate drain for type 2 hood. Provide test and balance report. ABOVE CEILING DUCT - GREASE DUCT, FLEX & DIFFUSERS COMPLETE. sMOKE DUCT DETECTOR INSTALLED INSIDE RTU-1 WITH REMOTE TEST STATION. | MARKB | MARKB | | HD | P | 6554369 |
J. VERNON PLUMBING LLC | H= | C | 04/28/2020 | GAS REGULATOR AND FINAL CONNECTION COMPLETE | MARKB | MARKB | | H= | C | 6554343 |
J. VERNON PLUMBING LLC | HV | C | 04/28/2020 | WATER HEATER VENT COMPLETE | MARKB | MARKB | | HV | C | 6554339 |
MICK HEATING & SHEET METAL CO. | HD | P | 03/26/2020 | GREASE DUCT - MANUFACTURED GREASE DUCT INSTALLED/SEALED, SUPPORTED AND TERMINATED PER MANUFACTURER INSTRUCTIONS. Still need connection to hood and outside covers/insulation installed over couplings. WALKIN COOLER WILL BE SELF CONTAINED. | MARKB | MARKB | | HD | P | 6523271 |
MICK HEATING & SHEET METAL CO. | HD | P | 03/05/2020 | ABOVE CEILING DUCT - SUPPLY/RETURN, MAINS/BRANCHES INSTALLED PER PLAN OK TO WRAP. No flex, diffusers, exhaust, type 1 or type 2 hoods. No roof | MARKB | MARKB | | HD | P | 6502029 |
J. VERNON PLUMBING LLC | HC | C | 12/30/2019 | COMBINING SUITE 100 INTO SUITE 108 METER | MARKB | MARKB | | HC | C | 6439863 |
J. VERNON PLUMBING LLC | HI | C | 12/30/2019 | 2 PSI letter from CSU on file AT FINAL - Regulator and final connections. 10 PSI PRESSURE TEST OK, PIPING PER PLAN. | MARKB | MARKB | | HI | C | 6439862 |
J. VERNON PLUMBING LLC | P= | C | 05/22/2020 | | JOHNS | JOHNS | | P= | C | 6581366 |
J. VERNON PLUMBING LLC | P= | P | 05/21/2020 | need 60" side clearance from water closet wall to edge of lav @ both baths, mens flush handle to be on open side, need dome strainers @ back of house floor sinks (x3), rest ok | JOHNS | JOHNS | | P= | P | 6580138 |
J. VERNON PLUMBING LLC | PTO | C | 02/11/2020 | Ok. Note: Check VTR penetration and water heater at final. | DANR | DANR | | PTO | C | 6479226 |
J. VERNON PLUMBING LLC | PTO | P | 12/30/2019 | Exterior in wall DWV and domestic water ok. | DANR | DANR | | PTO | P | 6439569 |
J. VERNON PLUMBING LLC | PB | C | 12/09/2019 | | JOEL | JOEL | | PB | C | 6420735 |
GRINGO DAVE'S ELECTRIC, INC. | XES | P | 06/11/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised Existing Panel A to series rated. | BERTHA | BERTHA | | XES | P | 6601789 |
DUSTON CONSTRUCTION INC | XBS | T | 06/11/2020 | PAID (REC#1687667) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Minor floor plan revision, updated door schedule. | BPHILLIPS | BPHILLIPS | | XBS | T | 6600525 |
J. VERNON PLUMBING LLC | XMS | T | 12/18/2019 | PAID (REC#1651130) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised Return air grills | JUSTINC | JUSTINC | | XMS | T | 6430783 |