CMG CORP | B= | C | 04/23/2020 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6549194 |
CMG CORP | B= | P | 04/14/2020 | with all completed required inspections B= okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, COOLING CUBED Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6539968 |
CMG CORP | BFR | P | 01/27/2020 | All new light gage framing OK per approved plans / Reviewed accessible elements / Need all MEP's complete / | NICK | NICK | | BFR | P | 6464744 |
EL PASO ELECTRIC, LLC. | E= | C | 04/22/2020 | roof top pics accepted. | JOHNN | JOHNN | | E= | C | 6547427 |
EL PASO ELECTRIC, LLC. | E= | P | 04/16/2020 | need to get ono roof/ rest,ok/ Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | JOHNN | JOHNN | | E= | P | 6542552 |
EL PASO ELECTRIC, LLC. | EP | P | 03/16/2020 | Corrections Made | BRETC | BRETC | | EP | P | 6511153 |
EL PASO ELECTRIC, LLC. | ER | C | 03/16/2020 | | BRETC | BRETC | | ER | C | 6511152 |
EL PASO ELECTRIC, LLC. | EP | R | 01/24/2020 | need to ground the j box outside / | BRIAN | BRIAN | | EP | R | 6463261 |
EL PASO ELECTRIC, LLC. | ES | P | 01/24/2020 | Commercial Service: 200 amp 4-w ----ok to set meter in 229 service # 2 ( tagged as unit c ) / ----ok up to main | BRIAN | BRIAN | | ES | P | 6463258 |
EL PASO ELECTRIC, LLC. | ER | P | 01/24/2020 | walls and bath hard lids---ok | BRIAN | BRIAN | | ER | P | 6463254 |
ALNOR INC. | H= | C | 04/17/2020 | SAFETY RAILING IS COMPLETE | JERRYF | JERRYF | | H= | C | 6544066 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 04/16/2020 | ALL FINAL CONNECTIONS / TIE DOWNS / REGULATORS AND LABELS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6542574 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 04/13/2020 | TAB REPORT RECEIVED AND PLAN REVISION IS COMPLETE | JERRYF | JERRYF | | H= | C | 6538326 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 04/10/2020 | NEED TAB REPORT AND PLAN REVISION DELETING DISH HOOD NOTES: ALL INTERLOCKS AND THERMOSTATS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6537737 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | L | 04/08/2020 | STOPPED INSPECTION INTERLOCKS ARE NOT COMPLETE - NEED TO DELETE DISH HOOD FROM PLANS IF NOT BEING INSTALLED - NEED TAB REPORT - VERIFY THERMOSTATS | JERRYF | JERRYF | | H= | L | 6534921 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 03/31/2020 | STILL NEED CLEARANCE TO ECONOMIZERS FROM PLUMBING VENTS AND OTHER ITEMS ADDRESSED | JERRYF | JERRYF | | HSP | P | 6526874 |
ALNOR INC. | H= | P | 03/31/2020 | PARTIAL PENDING SAFETY RAILING AT CONDENSERS NOTES: DRAINS ARE COMPLETE AND NO ALARMS REQUIRED | JERRYF | JERRYF | | H= | P | 6526864 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/26/2020 | PARTIAL PENDING THE FOLLOWING - INTERLOCKS / THERMOSTATS / SAFETY RAILING AT RTU AND EXHAUST FAN / TAB REPORT / EXTEND PLUMBING VENT TO 3' ABOVE MUA INTAKE | JERRYF | JERRYF | | H= | P | 6522628 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/26/2020 | GREASE DUCT LIGHT TEST OK ON ALL DUCT - WRAP OK | JERRYF | JERRYF | | HD | P | 6522593 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | L | 03/25/2020 | STOPPED INSPECTION UNABLE TO ACHIEVE DARK CONDITION ON ROOF - ALREADY RESCHEDULED FOR 3/26 WITH CALL AHEAD | JERRYF | JERRYF | | HD | L | 6520898 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 03/24/2020 | OK TO RELEASE 2# METER | JERRYF | JERRYF | | HC | C | 6519211 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 03/23/2020 | PRESSURE TEST OK AT MAIN AND COOK LINE AND PIPING PER PLAN - AT FUTURE INSPECTION VERIFY ALL FINAL CONNECTIONS AT ALL EQUIPMENT AND ROOF | JERRYF | JERRYF | | HI | P | 6518437 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/23/2020 | GREASE DUCT LIGHT TEST OK ON SECTION OF DUCT FOR FAN CONNECTION AND 2 ELBOWS - AT NEXT INSPECTION VERIFY WELDS AT ALL FINAL CONNECTIONS ON ROOF | JERRYF | JERRYF | | HD | P | 6518436 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/13/2020 | ABOVE CEILING SA / RA / MUA DUCT MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6510181 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 03/12/2020 | NOTIFIED DAVE WITH RIAL ON WELDED CONNECTION AT UTILITY SET FAN | JERRYF | JERRYF | | HSP | P | 6508274 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/11/2020 | NEED FURTHER RESEARCH ON DUCT TO GREASE FAN CONNECTION MORE NOTES TO FOLLOW ON 3 / 12 ABOVE CEILING MUA / SA / RA AND EXHAUST GRILLES AND CONNECTIONS OK AT DINING / RESTROOM AND MUA TIE INS AT HOOD - HAD CONSULT WITH DAVE FROM RIAL ON GREASE FAN AND DUCT CONSTRUCTION ON ROOF UTILITY FAN WILL NEED TO BE SECURED TO ROOF AND DUCT CONSTRUCTED TO MAINTAIN PROPER GRADE | JERRYF | JERRYF | | HD | P | 6507474 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/03/2020 | GREASE WRAP OK FROM HOOD TO BOTTOM OF CURB | JERRYF | JERRYF | | HD | P | 6498126 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | R | 03/02/2020 | CANNOT USE 2 DIFFERENT TYPES OF GREASE WRAP - STOPPED INSPECTION - ALREADY RESCHEDULED FOR 3/3 1ST INSPECTION WITH CALL AHEAD TO DAVE | JERRYF | JERRYF | | HD | R | 6497127 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/28/2020 | GREASE DUCT LIGHT TEST OK ON BOTH DROPS - OK FOR 1ST AND 2ND LAYER / CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER - STILL NEED TOP PLATES AT BOTH CURBS | JERRYF | JERRYF | | HD | P | 6496148 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/12/2020 | NOTES CHANGED ON 2 / 28 /20 TO HD INSPECTION INSPECTOR ENTERED HEATING FINAL BY ACCIDENT NOTES ; ABOVE CEILING SA / RA / EXHAUST MAINS AND RUN OUTS OK IN DINING / BAR / RESTROOMS OK ONLY STILL NEED ALL OTHER | JERRYF | JERRYF | | HD | P | 6479876 |
ALNOR INC. | HRP | P | 01/03/2020 | 2 PRESSURE TESTS OK ONLY - STILL NEED CONDENSERS INSTALLED - COULD NOT LOCATE REFRIGERATION CALCS ON PLANS | JERRYF | JERRYF | | HRP | P | 6442516 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 04/21/2020 | | JOHNS | JOHNS | | P= | C | 6546507 |
LANDMARK PLUMBING AND HEATING, INC. | P= | L | 04/20/2020 | field cancelled @ call ahead (Tom plbr), please provide correct call ahead toTom for next inspection, please have Tom meet inspector on site | JOHNS | JOHNS | | P= | L | 6545392 |
LANDMARK PLUMBING AND HEATING, INC. | P= | L | 04/17/2020 | doors locked, please have plbr (Tom) on site for next inspection | JOHNS | JOHNS | | P= | L | 6543997 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 04/16/2020 | | JOHNS | JOHNS | | PTO | C | 6542540 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 04/16/2020 | | JOHNS | JOHNS | | PB | C | 6542539 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 04/16/2020 | t&p to high, water htr drain pan as no drain outlet?, need to discuss splice (please have contractor on site for next inspection), rest ok | JOHNS | JOHNS | | P= | P | 6542530 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/22/2020 | need to revise plans to show all added fixtures
scope of work to show all plbg related items installed
rest ok. NOTE: vtr (existing), aav @ bar area (in wall w/ louvered panel), check water tie ins to water htr @ final, check water htr if new installed @ final, verify fill and drain kit @ final, need pics of flanges secured @ final | JOHNS | JOHNS | | PTO | P | 6459857 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 12/31/2019 | need to revise plans to show all added fixtures and to show all floor drain and floor sinks MINUS floor drain in front of cooler to be CWV, cover at your own risk | JOHNS | JOHNS | | PB | P | 6440228 |
LANDMARK PLUMBING AND HEATING, INC. | PB | L | 12/30/2019 | field cancelled | JOHNS | JOHNS | | PB | L | 6439018 |
EL PASO ELECTRIC, LLC. | XES | P | 01/28/2020 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts - see new sheets. | SHELBY | SHELBY | | XES | P | 6466235 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 01/28/2020 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: remove RTU , gas line and ducts , to install new grease exhaust, relocate RTU gas pipe and ducts | TCRIPPEN | TCRIPPEN | | XMS | P | 6466168 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 01/28/2020 | PAID (REC#1658677) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 1/28/20: Delta 1 revisions: revised fixture schedule, revised waste and vent plan | SHANEN | SHANEN | | XPS | T | 6466089 |