SHARP GENERAL CONTRACTORS, INC | B= | C | 04/28/2020 | | BRIANB | BRIANB | | B= | C | 6553758 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 03/11/2020 | missing ANSI counter top per detail 2 on sheet A3.1 of the approved design / need to complete other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6507067 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 01/23/2020 | pending completion of other required inspections, interior wall framing okay | BOBF | BOBF | | BFR | P | 6462113 |
ELECTRIC TECH INC. | E= | C | 03/10/2020 | Electrical complete / | ROB | ROB | | E= | C | 6505732 |
ELECTRIC TECH INC. | E= | P | 03/09/2020 | Need Panel Schedules / Dish room and pizza kitchen area complete / | ROB | ROB | | E= | P | 6504520 |
ELECTRIC TECH INC. | ER | P | 03/06/2020 | Rough ok for grid ceilings / | ROB | ROB | | ER | P | 6502680 |
ELECTRIC TECH INC. | ER | P | 03/05/2020 | Cancelled by contractor upon arrival, not ready / | ROB | ROB | | ER | P | 6501270 |
ELECTRIC TECH INC. | ER | P | 02/03/2020 | Recess cans over soda fountain counter ok / | ROB | ROB | | ER | P | 6472267 |
ELECTRIC TECH INC. | ER | P | 01/30/2020 | Rough ok for rest of walls / | ROB | ROB | | ER | P | 6469118 |
ELECTRIC TECH INC. | ER | P | 01/23/2020 | Need to complete PVC's up to ceiling in stub wall for bar ckts. / Need to re-route cable to B-17 recpt. near stub wall / Need to complete demo and additional recpts. for north existing bar wall / | ROB | ROB | | ER | P | 6461428 |
ELECTRIC TECH INC. | ESL | C | 01/06/2020 | ESL for 5-3/4" PVC from wing wall to bar ok / | ROB | ROB | | ESL | C | 6443996 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 04/20/2020 | SPLICE COMPLETED | MARKB | MARKB | | H= | C | 6545916 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 03/18/2020 | FOR FINAL - Need plan splice for branch piping at pizza oven. | MARKB | MARKB | | H= | P | 6515255 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 03/18/2020 | OK TO CHANGE METER FROM 7" W.C TO 2 PSI. | MARKB | MARKB | | HC | C | 6515254 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 03/18/2020 | ALL PIPING PRESSURE TEST COMPLETE. MAIN LINES PER PLAN SPLICE. | MARKB | MARKB | | HI | C | 6515251 |
AIRTECH MECHANICAL, INC. | H= | C | 03/18/2020 | PLAN SPLICE COMPLETE. | MARKB | MARKB | | H= | C | 6515248 |
AIRTECH MECHANICAL, INC. | HD | P | 03/17/2020 | GASKET ON GREASE FAN COMPLETE. Still waiting on splice. | MARKB | MARKB | | HD | P | 6512493 |
LANDMARK PLUMBING AND HEATING, INC. | H= | R | 03/16/2020 | NOT READY FOR FINAL. | LIDO | LIDO | | H= | R | 6511764 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 03/16/2020 | NEED THE FOLLOWING SPLICE BEFORE THE METER CAN BE RELEASED. REVISED STAMPED PLANS ON SITE DATED 3/13/20 DO NOT SHOW GAS INSTALL FOR THE 3 STACK PIZZA OVEN. GAS INSTALLED IS 1" BRANCHED OFF THE 1-1/2" AND 3 - 3/4" OUTLETS OFF THE 1" FOR EACH PIZZA OVEN STACK . NEED REVISED AND APPROVED GAS PLAN/ GAS REGULATOR TO THE 3 STACK PIZZA OVEN IS INSTALLED VERTICAL. NEED REGULATOR INSTALL INSTRUCTIONS TO VERIFY THIS INSTALL IS APPROVED BY THE MANUFACTURER / WEST COOK LINE FLEXIBLE QUICK DISCONNECTS AND RESTRAINTS OK / ANSUL CONNECTION VERIFIED/ MEDIUM PRESSURE LABELS OK / ROOF OK/ | LIDO | LIDO | | HI | P | 6511763 |
LANDMARK PLUMBING AND HEATING, INC. | HI | R | 03/12/2020 | 2 PSI LETTER APPROVAL LETTER FROM CSU RECEIVED. Still need item from previous inspection. Plan splice will need corrected rating for 3 stack pizza oven instead a 2 stack oven as plans reflect. | MARKB | MARKB | | HI | R | 6509776 |
AIRTECH MECHANICAL, INC. | HD | P | 03/12/2020 | FOR FINAL - Need plan splice for moved makeup air unit on roof, removed supply by kitchen and return in kitchen. Left side of pizza ovens lack proper hood over hang. EF-1 grease fan high temp gasket installed in correct location. 2 LAYERS OF GREASE WRAP AND BANDS COMPLETE ON BOTH HOODS. WALK IN COOLER IS SELF-CONTAINED. HOOD INTER LOCKS HAVE BEEN CONFIRMED | MARKB | MARKB | | HD | P | 6509775 |
AIRTECH MECHANICAL, INC. | HSP | P | 03/12/2020 | NOTE ADDED: TEST AND BALANCE REPORT PROVIDED SHOWS #19 SUPPLY FOR 560 CFM deleted on plan with balance report - will need a plan splice showing deleted supply. TEST AND BALANCE REPORT OK PENDING SPLICE. Test and balance report does not match current plan with missing supply by kitchen doors - Diffuser on plans list 560 CFM and TAB report list 560 CFM was gotton but supply duct and diffuser are not installed. | MARKB | MARKB | | HSP | P | 6508888 |
LANDMARK PLUMBING AND HEATING, INC. | HI | R | 03/11/2020 | Need 2 psi approval letter from CSU. Makeup air unit not installed in location on plan. Gas piping does not match plan splice (pipe sizes or branch tee in point to mains). Cannot confirm ANSUL or regulator locations. | MARKB | MARKB | | HI | R | 6508138 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 03/10/2020 | NEED TO REVIEW PLAN WITH PREVIOUS INSPECTOR MORE NOTES TO FOLLOW ON 3 / 11 - CANNOT USE BRASS LIMITERS OUTSIDE BUILDING - COULD NOT LOCATE REGULATOR FOR COOK LINE TO VERIFY INSTALLATION AND LABELS NOTES: PRESSURE TEST OK | JERRYF | JERRYF | | HI | P | 6506487 |
AIRTECH MECHANICAL, INC. | HD | P | 03/06/2020 | GREASE DUCT LIGHT TEST COMPLETE | MARKB | MARKB | | HD | P | 6503631 |
AIRTECH MECHANICAL, INC. | HD | P | 03/05/2020 | ABOVE CEILING DUCT - ALL NEW/EXISTING, MAINS/BRANCHES/FLEX DIFFUSERS/MAKEUP AIR DUCT PER PLAN EXCEPT: Need to remove return in kitchen not shown on plans and install supply outside kitchen doors shown on plan. GREASE DUCT LIGHT TEST - SMALL HOOD EXTENSION LIGHT TEST OK. Still need curb flange. Repair insulation. | MARKB | MARKB | | HD | P | 6502126 |
AIRTECH MECHANICAL, INC. | HD | P | 03/04/2020 | CONTRACTOR HAD TO CUT CURB OFF EXISTING GREASE DUCT AND EXTEND UP: GREASE DUCT LIGHT TEST - Found 3 holes on extended duct above roof. Will need metal removed from roof opening holding duct in place to see if existing grease wrap has been damaged. | MARKB | MARKB | | HD | P | 6500488 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 02/28/2020 | ----PLAN SPLICE REQUIRED - Need plans to show new 2 psi system not existing. Plans need to reflect correct sizes and piping configuration of existing piping. Fireplace not being installed. New piping does not match plans---- 10 PSI PRESSURE TEST OK, IF PIPING IS CHANGED A NEW TEST WILL BE REQUIRED. | MARKB | MARKB | | HI | P | 6496553 |
LANDMARK PLUMBING AND HEATING, INC. | HI | R | 02/24/2020 | Low test. Cannot verify piping above hood (need ladder set up). Will need a 2 PSI approval letter from CSU. Will need all existing gas piping back to meter pressure test (going from 7" to 2 psi system). Gas line to fireplace not ran. Cannot get on roof to verify piping with drywall stacked up against access ladder. Piping saw from ground does not match plans. | MARKB | MARKB | | HI | R | 6490788 |
AIRTECH MECHANICAL, INC. | HD | P | 02/12/2020 | GREASE DUCT LIGHT TEST - LIGHT TEST COMPLETE FOR LARGE HOOD. OK TO INSTALL 2 LAYERS OF WRAP. GREASE DUCT WRAP - SMALL HOOD EXISTING WRAP HAS BEEN CUT BACK AND ENDS TAPPED WITH OFFSET - OK TO FINISH 2 LAYERS OF WRAP USING SAME BRAND AS EXISTING. | MARKB | MARKB | | HD | P | 6479884 |
AIRTECH MECHANICAL, INC. | HD | P | 02/11/2020 | -----Plan splice required - need new makeup air unit shown in equipment schedule. Engineer to address makeup air unit shows 3000 cfm on M1.0 sheet but says 2000cfm in air balance schedule---- Need refrigeration contractor attached to permit. GREASE DUCT LIGHT TEST - LIGHT TEST COMPLETE ON SMALL HOOD, Need to cut back outside wrap layer on existing duct 3" and tape ends of both 1st layer and second layer. LIGHT TEST ON BIG HOOD found 2 holes at hood collar. WILL NEED METAL BEHIND HOODS TO EXTEND 18" ABOVE BOTH HOODS. | MARKB | MARKB | | HD | P | 6479695 |
AIRTECH MECHANICAL, INC. | HD | P | 02/03/2020 | GREASE DUCT LIGHT TEST DONE AT CONTRACTORS SHOP - LIGHT TEST OK FOR 3 SECTIONS AND CURB FLANGE OF 14" ROUND. OK TO WRAP CURB END WITH 2 LAYERS | MARKB | MARKB | | HD | P | 6472165 |
AIRTECH MECHANICAL, INC. | HD | P | 01/30/2020 | HOOD WALLS: NEED TO REMOVE PVC PIPING OUT OF WALL FOR HOOD 2. WALL BEHIND HOOD 1 HAS NO COMBUSTIBLES. | MARKB | MARKB | | HD | P | 6470053 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 03/11/2020 | | JOHNS | JOHNS | | P= | C | 6507254 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 03/09/2020 | need trap guard @ floor drain, need back flow @ soft serve machine and tea maker, rest ok | JOHNS | JOHNS | | P= | P | 6504830 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 01/15/2020 | pony wall and floor drains | TED | TED | | PTO | C | 6453783 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 12/31/2019 | | DANR | DANR | | PB | C | 6440518 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 04/15/2020 | PAID (REC#1674311): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Removed fireplace , Relocate MUA unit , Reroute gas lines ,Gas meter 2 psi. | TCRIPPEN | TCRIPPEN | | XMS | T | 6541294 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 03/13/2020 | PAID (REC#1668382) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice relocate MAU 1, reroute ducts remove duct, added gas pipe relocate gas piping, | TCRIPPEN | TCRIPPEN | | XMS | T | 6510263 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 02/14/2020 | PAID (REC#1662381) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice relocate MAU and ducts. revised gas system | TCRIPPEN | TCRIPPEN | | XMS | T | 6483195 |