STANTON CONSTRUCTION, INC. | B= | C | 10/26/2021 | | NATHAN | NATHAN | | B= | C | 7154156 |
STANTON CONSTRUCTION, INC. | BSP | C | 10/20/2021 | | BOBF | BOBF | | BSP | C | 7147612 |
STANTON CONSTRUCTION, INC. | BE | C | 01/29/2021 | | NELIDA | NELIDA | | BE | C | 6852570 |
STANTON CONSTRUCTION, INC. | B= | P | 06/04/2020 | pending competion of other required inspections, building okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), MECH ONE, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6593211 |
STANTON CONSTRUCTION, INC. | BSP | P | 05/01/2020 | penetration protection at rated wall okay / need plans revised for as built conditions for doors, reverse swing on one and moved from original location on wall on another, also orientation of sinks have been turned 90 degrees | BOBF | BOBF | | BSP | P | 6559066 |
STANTON CONSTRUCTION, INC. | BSP | P | 04/17/2020 | images of penetration showing at less than 45 degree angle on file / will need to observe fire stop fix after completed per the assembly on file | DANE | DANE | | BSP | P | 6543525 |
STANTON CONSTRUCTION, INC. | BSP | P | 04/15/2020 | firestop detail on file / inspector notes state that the penetrating item is at a 30 degree angle and the firestop detail will only work on items at an angle from 90 to 45 degrees. W-L-1054 | DANE | DANE | | BSP | P | 6540831 |
STANTON CONSTRUCTION, INC. | BSP | P | 02/25/2020 | pending completion and approval of splice, separation wall framing with core board per U 415 okay,/ 1st layer drywall install per AER 09038 at horizontal shaft okay | BOBF | BOBF | | BSP | P | 6492147 |
STANTON CONSTRUCTION, INC. | BSP | P | 02/14/2020 | framing and core board per AER 09038 at horizontal assembly okay | BOBF | BOBF | | BSP | P | 6482721 |
STANTON CONSTRUCTION, INC. | BSP | P | 02/07/2020 | drywall install on corridor side of rated wall per U 465 okay / will need listed system for angle brace penetrating through wall / also need listed system for pipe penetration to verify max allowable annular space around pipe | BOBF | BOBF | | BSP | P | 6476762 |
STANTON CONSTRUCTION, INC. | BSP | P | 01/28/2020 | headwall protection at office side of corridor wall okay | BOBF | BOBF | | BSP | P | 6467089 |
STANTON CONSTRUCTION, INC. | BFR | P | 01/24/2020 | pending completion of other required inspections / drywall install at office side of corridor per U 465 okay / will need listed system for membrane penetration of 1 1/2" cast iron at a 30 degree angle | BOBF | BOBF | | BFR | P | 6463818 |
STANTON CONSTRUCTION, INC. | BSP | P | 01/15/2020 | this is a IEBC level 2 project - met with contractor to review Shaft wall and rated corridor wall construction | BOBF | BOBF | | BSP | P | 6454463 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 03/27/2020 | panel PP ---- above ceiling --- hot checked OK | CRAIGS | CRAIGS | | E= | C | 6523670 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/20/2020 | panel wall ----- OK | CRAIGS | CRAIGS | | ER | P | 6487520 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | EP | P | 02/20/2020 | panel pp-a OK ---- no loads @ this time | CRAIGS | CRAIGS | | EP | P | 6487513 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/04/2020 | rough in for hallway side of wall okay | CHIPO | CHIPO | | ER | P | 6473608 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 07/15/2021 | INSPECTION PERFORMED WITH MATT M. Final Connections Complete. | MARKB | MARKB | | H= | C | 7037911 |
MECHONE, INC. | H= | C | 08/05/2020 | ENGINEER LETTER APPROVING TAB REPORT AND PICTURES OF DAMPER ACCESS LABELS | JERRYF | JERRYF | | H= | C | 6661210 |
MECHONE, INC. | H= | P | 06/05/2020 | PARTIAL PENDING THE FOLLOWING - REVISED TAB REPORT OR ENGINEER PER PREVIOUS NOTES - LABEL CEILING GRID AT TRANSFER DAMPERS AND FIRE DAMPER ACCESS DOOR IN CLOSET | JERRYF | JERRYF | | H= | P | 6595903 |
MECHONE, INC. | H= | P | 06/05/2020 | TAB REPORT RECEIVED - VAV #4 READINGS ARE OUTSIDE +/- 10% NEED CORRECTED TAB REPORT OR LETTER FROM ENGINEER APPROVING READINGS | JERRYF | JERRYF | | H= | P | 6594485 |
MECHONE, INC. | HD | P | 04/09/2020 | ABOVE CEILING SA / RA FINAL CONNECTIONS AND GRILLES ARE COMPLETE IN PHASE 1 - STILL NEED THE FOLLOWING - ALL EXHAUST HOODS CLAIMED ON PERMIT WORK SCOPE AND VENTING INSPECTED - SMOKE SHUTDOWN AND REMOTE INDICATORS - DUCT ACCESS DOOR AT FIRE DAMPER - TAB REPORT | JERRYF | JERRYF | | HD | P | 6536776 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 03/27/2020 | 10 PSI PRESSURE TEST ON NEW 11/2" LINE FROM BOILER ROOM TO MAKEUP AIR UNIT AND PIPING PER PLAN OK. Still need tie into existing line in boiler room and final equipment connections. | MARKB | MARKB | | HI | P | 6524591 |
MECHONE, INC. | HD | P | 03/16/2020 | MUA AND OUTSIDE AIR DUCT MAINS OK ON ROOF - STILL NEED ALL EXHAUST | JERRYF | JERRYF | | HD | P | 6512292 |
MECHONE, INC. | HD | P | 02/25/2020 | FIRE DAMPER FRAMING AT 12" ROUND OK - AT FUTURE INSPECTION VERIFY DAMPER GAP / RETAINAGE AND BREAK AWAY CONNECTION | JERRYF | JERRYF | | HD | P | 6492380 |
MECHONE, INC. | HD | P | 02/21/2020 | NEED PLAN REVISION SHOWING SHAFT LINER INSTALLED AT 12" RD. FIRE DAMPER - NEED FRAMING CORRECTED AT SHAFT LINER | JERRYF | JERRYF | | HD | P | 6489197 |
MECHONE, INC. | HD | P | 02/06/2020 | NEED PLAN REVISION SEPARATED SUPPLY DUCT IN SHAFT AND DELETING FIRE DAMPERS AT BOTTOM OF SHAFT NOTES: ABOVE CEILING SA / RA / EXHAUST MAINS / RUN OUTS / VAV BOXES AND FIRE DAMPER GAP AT CORRIDOR WALL OK | JERRYF | JERRYF | | HD | P | 6476159 |
MECHONE, INC. | HD | L | 01/30/2020 | CANCELED AT CALL AHEAD BY CONTRACTOR | JERRYF | JERRYF | | HD | L | 6470104 |
MECHONE, INC. | HD | P | 01/15/2020 | FIRE DAMPER OPENING OK AT CORRIDOR WALL AND HAD CONSULT WITH MARK K. FROM MECH ONE ON SHAFT DUCT | JERRYF | JERRYF | | HD | P | 6454193 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 10/04/2021 | | JOHNS | JOHNS | | P= | C | 7128685 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/15/2021 | just need to revise plans noted on 1/23/20, rest ok | JOHNS | JOHNS | | P= | P | 7037646 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 07/15/2021 | ok for vent pushed and under floor water piping, MINUS revisions need per 1/23/20 PTO, NOTE: vtr (1 new) | JOHNS | JOHNS | | PTO | C | 7037633 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/23/2020 | Need VTR penetration, under floor domestic water piped, plan splice for moving hot water line to new location being fed from different water heater. Notre: at final check under floor domestic water and DWV tie ins - overhead insulation, . | DANR | DANR | | PTO | P | 6461650 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 09/17/2021 | PAID (REC#1811033): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 9 revisions: Adjusted sheet P113. | SHANEN | SHANEN | | XPS | T | 7110596 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 06/09/2021 | PAID (REC#1789923): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Added sheet PD113 and adjusted sheet P123. | SHANEN | SHANEN | | XPS | T | 6995952 |
STANTON CONSTRUCTION, INC. | XBS | P | 06/09/2021 | PLAN SPLICE: (No Fee) by: DANM for Construction: Minor plumbing revision reflected on floor plan | DANM | DANM | | XBS | P | 6995578 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 06/03/2020 | PAID (REC#1685712): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: P113 adjusted plumbing plan third floor, P123 adjusted plumbing sanitary plan third floor, added sink with dishwasher detail | SHANEN | SHANEN | | XPS | T | 6591802 |
STANTON CONSTRUCTION, INC. | XBS | T | 06/03/2020 | PAID (REC#1685277): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions to architectural | DANM | DANM | | XBS | T | 6591750 |
STANTON CONSTRUCTION, INC. | XBS | T | 03/23/2020 | PAID (REC#1669722): PLAN SPLICE FEE: $50 by: DANM for Construction: Addition of shaft wall at Workroom | DANM | DANM | | XBS | T | 6518563 |
STANTON CONSTRUCTION, INC. | XBS | T | 02/19/2020 | PAID (REC#1663008) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Duct enclosure details. | SHELLEY | SHELLEY | | XBS | T | 6485546 |