JDBUILTHOMESLLC | B= | C | 06/12/2020 | All other required Final inspections are complete. (This is a computer generated result) | TRENTP | TRENTP | | B= | C | 6602381 |
JDBUILTHOMESLLC | B= | P | 06/11/2020 | . Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TRENTP | TRENTP | | B= | P | 6601464 |
JDBUILTHOMESLLC | B= | R | 06/09/2020 | Stairs at side of house has more than 2 riser and needs a minimum 18 inch landing / Bottom riser measures 9 inches from walking surface to top of riser / Max riser height is 7 3/4 inches and can only vary 3/8 of an inch / Rest okay / Crawl space / No deck installed. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TRENTP | TRENTP | | B= | R | 6598802 |
JDBUILTHOMESLLC | BSP | P | 06/09/2020 | Upload of 3rd party insulation cert / Air leakage test / Blown in/spray foam insulation cert / DC315 evaluation report / Spray foam insulation evaluation report | TRENTP | TRENTP | | BSP | P | 6597569 |
JDBUILTHOMESLLC | BIN | P | 04/16/2020 | BIN OK pending blown in insulation installers cert for walls and attic - will check crawl space insulation and vapor barrier at final inspection. | CHUCK | CHUCK | | BIN | P | 6542937 |
JDBUILTHOMESLLC | BFR | C | 04/16/2020 | BFR corrections complete. | CHUCK | CHUCK | | BFR | C | 6542934 |
JDBUILTHOMESLLC | BFR | P | 04/16/2020 | Wood stove installation manual and engineering letters for steel beam/wood post and ledgerboard support of floor joists in crawl space on file. | CHUCK | CHUCK | | BFR | P | 6542111 |
JDBUILTHOMESLLC | BFR | R | 04/14/2020 | Missing fire blocking at top plate by water heater closet and return air duct at Master Bedroom / Missing all MTS12s at rear wall - H2.5Ts installed instead / Missing H2.5Ts at front exterior porch wall / Steel beam too short for splice connection in crawl space - one floor joist bearing on temp wood post to pad in this area / Need wood burning stove/fireplace instruction manual to determine clearance to combustibles from chimney and stove/fireplace / Need to upload engineering letter for ledger support of floor joists under Master Bedroom // Rest of frame OK - crawl space. | CHUCK | CHUCK | | BFR | R | 6540471 |
JDBUILTHOMESLLC | BSP | P | 03/13/2020 | Front and rear porch lid per plan | CHAD | CHAD | | BSP | P | 6510854 |
JDBUILTHOMESLLC | BFD | C | 02/19/2020 | Drain is installed usable -- Damp proofing OK / Drain ok / Contractor to backfill per requirements of Soils Report / Drains to pit | TIMOTHYS | TIMOTHYS | | BFD | C | 6486615 |
JDBUILTHOMESLLC | BFN | C | 02/19/2020 | Foundation design and foundation reinforcement with UFER observation on file. | CHUCK | CHUCK | | BFN | C | 6485344 |
JDBUILTHOMESLLC | BFT | C | 02/19/2020 | Soils report, open ex. and footing observations on file - 2000# (design verified) / 10% / usable drain required. | CHUCK | CHUCK | | BFT | C | 6485342 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | C | 06/02/2020 | no a/c | TOMC | TOMC | | E= | C | 6590661 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | C | 04/07/2020 | will have access per contractor | TOMC | TOMC | | ER | C | 6533081 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | C | 04/06/2020 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 6532372 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | R | 04/06/2020 | cannot have receptacle buried in wall (hood ) ---- 1 - 4/0 SER , 2 - #6 SER , 3 - #10 , irreversible ufer , crawl space , sub-panel in house | TOMC | TOMC | | ER | R | 6532364 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 06/05/2020 | | CHADP | CHADP | | H= | C | 6595149 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/01/2020 | INSTALL WATER HEATER/ UNABLE TO LOCATE RETURN AIR IN CRAWL SPACE/ WILL NEED TO ADDRESS 50/1 FOR THE WATER HEATER/ RE INSPECT ALL/ | CHADP | CHADP | | H= | P | 6589156 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 04/13/2020 | RELEASE METER | DUSTINS | DUSTINS | | HC | C | 6538629 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 04/13/2020 | COMPLETE RETURN AIR DUCTING FOR CONDITIONED CRAWLSPACE BY FINAL. WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN LAUNDRY ROOM / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL / NOTE / DIRECT VENT FURNACE / OUTSIDE AIR WITH DAMPER TO FURNACE RETURN / NO A/C / | DUSTINS | DUSTINS | | HRR | C | 6538618 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 04/08/2020 | CONTRACTOR NEEDS TO WALK JOB BEFORE CALLING FOR INSPECTION/ TOO MANY ITEMS TOO LIST/ | CHADP | CHADP | | HRR | P | 6534721 |
L & L GAS SHOP, LLC. | HI | C | 04/02/2020 | 10 lb test ok / 1 1/4 inch main / 1 furnace / 1 water heater / 1 range / | MARK | MARK | | HI | C | 6530232 |
JOLLY PLUMBING & HEATING INC. | P= | C | 06/08/2020 | Correction made, image viewed | MALYNDA | MALYNDA | | P= | C | 6596442 |
JOLLY PLUMBING & HEATING INC. | P= | P | 06/05/2020 | Seal water heater floor drain (text photo of correction to 719-338-0509), rest ok Note: existing well and yard hydrant | MALYNDA | MALYNDA | | P= | P | 6595156 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 04/01/2020 | Corrections made | MALYNDA | MALYNDA | | PTO | C | 6527829 |
JOLLY PLUMBING & HEATING INC. | PTO | R | 03/26/2020 | Per P2708.4-"In-line thermostatic valves shall not be used for compliance with this section." | MALYNDA | MALYNDA | | PTO | R | 6521866 |
JOLLY PLUMBING & HEATING INC. | PTO | P | 03/25/2020 | Need to install correct single handle valves at tub and shower, rest ok Note: kc trap in crawler, vtr, no irrigation, check water connections to water heater at final | MALYNDA | MALYNDA | | PTO | P | 6521022 |
JOLLY PLUMBING & HEATING INC. | PWO | C | 03/04/2020 | Note: water under footer, not yet connected inside well pit, check connections at future inspection | MALYNDA | MALYNDA | | PWO | C | 6499718 |