CRADDOCK DEVELOPMENT COMPANY, INC. | B= | C | 10/20/2020 | | JANE | JANE | | B= | C | 6746884 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 10/19/2020 | . Additional Inspections Required (computer generated): GOLD RUSH PLUMBING Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6746505 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BE | L | 10/05/2020 | Renewed online for 1/2 Fee at 10/5/2020 10:35:13 AM (RECEIPT #: 1718615) | WEBSITE | WEBSITE | | BE | L | 6729319 |
MAIN ELECTRIC LTD | E= | C | 04/16/2020 | corrections made | CRAIG | CRAIG | | E= | C | 6543170 |
MAIN ELECTRIC LTD | E= | P | 04/15/2020 | see er notes | BRIAN | BRIAN | | E= | P | 6541405 |
MAIN ELECTRIC LTD | ER | P | 04/15/2020 | rtu--ok / just need sunlight rated labels / need to remove or lower the bathroom gfci's , the rest of the outltes and switches ore ok for accessibility / ok to upload pic/vedio | BRIAN | BRIAN | | ER | P | 6541398 |
MAIN ELECTRIC LTD | E= | R | 04/03/2020 | Need to see unit labeled and circuits feeding it / Change of use ADA change of occupancy not complete / | LOGANP | LOGANP | | E= | R | 6530905 |
MAIN ELECTRIC LTD | E= | P | 04/02/2020 | heater unit with blower motor ok | CRAIG | CRAIG | | E= | P | 6529977 |
HOMELAND MECHANICAL LLC | H= | C | 05/21/2020 | DUCT INSTALLED PER PLAN SPLICE, CO2 SHOWN ON PLAN SPLICE AND INTERLOCKS CONFIRMED. | MARKB | MARKB | | H= | C | 6579578 |
HOMELAND MECHANICAL LLC | HD | R | 04/15/2020 | ----STILL NEED APPROVED PLAN SPLICE----- BEER KEG REFRIGERATOR IS SELF -CONTAINED WITH 2 X 20 POUND CO2 CYLINDERS. | MARKB | MARKB | | HD | R | 6541635 |
HOMELAND MECHANICAL LLC | HSP | P | 04/08/2020 | ENGINEER APPROVED TEST AND BALANCE REPORT RECEIVED | MARKB | MARKB | | HSP | P | 6534383 |
HOMELAND MECHANICAL LLC | HD | R | 04/03/2020 | ----PLAN SPLICE REQUIRED AND ENGINEER TO ADDRESS - Existing duct does not match plans. Makeup air unit installed is different make and model than shown on equipment schedule and does not provide cooling. Need plans to show thermostat and CO2 sensor location. Need smoke duct detector installed. This remodel had beer taps installed, need beer storage and CO2 tank shown on plans. ---- ----NEED PLUMBING CONTRACTOR ATTACHED TO PERMIT---- ----NEED ACCESS TO LOCKED ROOMS---- ----NEED TO CONFIRM INTERLOCKS---- ROOF OK, LOUVER AND EXHAUST FAN INSTALLED PER PLAN. | MARKB | MARKB | | HD | R | 6530740 |
TEAM PLUMBING, INC. | P= | C | 10/16/2020 | to include PB and PTO | JOHNS | JOHNS | | P= | C | 6744338 |
TEAM PLUMBING, INC. | PTO | P | 10/08/2020 | PTO COMPLETED BY PREVIOUS PLBG CONTRACTOR
pending PB revisions, rest ok. NOTE: vtr (existing) | JOHNS | JOHNS | | PTO | P | 6734347 |
TEAM PLUMBING, INC. | PB | P | 10/08/2020 | NEED to revise plans to show 3" waste from G.I. to existing 4" (in lieu of 2" G.I. drain to 2" existing drain), rest ok | JOHNS | JOHNS | | PB | P | 6734341 |
TEAM PLUMBING, INC. | PGI | C | 10/08/2020 | | JOHNS | JOHNS | | PGI | C | 6734338 |
GOLD RUSH PLUMBING | P= | P | 04/17/2020 | not per plan, need engineers approval and plan review for current above floor grease trap and design, need vtr for grease trap (per plans), cant aav grease trap, missing 3" floor sink (per plans), grease trap is double trapped (trap installed down stream for grease trap), need install sheet for grease trap, drain outlet for grease trap not gravity fed (grease trap below drain into wall), re inspect all | JOHNS | JOHNS | | P= | P | 6543719 |
GOLD RUSH PLUMBING | P= | P | 04/15/2020 | not installed per plan, interceptor not sized per plan, need interceptor install sheet, need contractor on site, re inspect all | JOHNS | JOHNS | | P= | P | 6541352 |
TEAM PLUMBING, INC. | XPS | T | 10/14/2020 | PAID (REC#1721622): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: new splice re route drains and vents, | TCRIPPEN | TCRIPPEN | | XPS | T | 6740610 |
HOMELAND MECHANICAL LLC | XMS | T | 05/20/2020 | PAID (REC#1681775): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Changed duct sizes, t-stat, added CO2, No cooling, | TCRIPPEN | TCRIPPEN | | XMS | T | 6577744 |