DANIEL-BARRY CONSTRUCTION INC | B= | C | 12/21/2020 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6814350 |
DANIEL-BARRY CONSTRUCTION INC | B= | P | 10/15/2020 | pending completion of other required inspections, building okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6742590 |
DANIEL-BARRY CONSTRUCTION INC | BSP | P | 09/25/2020 | letter approving as built conditions of roof assembly on file | BOBF | BOBF | | BSP | P | 6718996 |
DANIEL-BARRY CONSTRUCTION INC | BSP | P | 09/22/2020 | eng letter for open hole footing and steel on file | BOBF | BOBF | | BSP | P | 6713688 |
DANIEL-BARRY CONSTRUCTION INC | BIN | C | 09/11/2020 | ESR for closed cell foam on file / okay for use in Type III construction | BOBF | BOBF | | BIN | C | 6702252 |
DANIEL-BARRY CONSTRUCTION INC | BIN | P | 07/24/2020 | Received ES Report for Carlisle SealTite Pro OCX Spray Foam Insulation and Installers certificate for application on roof deck and over frame area / Per ES Report Section 3 Product Use and Section 4.5.3, the applied product can only be used in exterior walls for type 3 construction / Please clarify application for roof decks and over frame areas is allowed for type 3 construction / Note- Please submit engineer letter for alternative hangers to complete frame | ADAML | ADAML | | BIN | P | 6649058 |
DANIEL-BARRY CONSTRUCTION INC | BSP | P | 07/20/2020 | Training with Adam L - reviewed metal stud framing and support for non bearing/ non rated walls | BOBF | BOBF | | BSP | P | 6642796 |
DANIEL-BARRY CONSTRUCTION INC | BSP | P | 07/20/2020 | Interior framing OK on addition pending engineer letter for previous inspection regarding head outs and hanger substitutions /Training with Bob F / Reviewed interior framing / Elements of accessibility | ADAML | ADAML | | BSP | P | 6642794 |
DANIEL-BARRY CONSTRUCTION INC | BFI | P | 07/02/2020 | r 7.5 behind brick okay | BOBF | BOBF | | BFI | P | 6625624 |
DANIEL-BARRY CONSTRUCTION INC | BSP | P | 05/28/2020 | Changes in roof framing questions need design professional letter for head outs and hanger substitutions. | NATHAN | NATHAN | | BSP | P | 6585443 |
DANIEL-BARRY CONSTRUCTION INC | BSP | P | 05/20/2020 | training with Adam L - reviewed code study / plan review comments / interior wall framing including of type of wall framing required per plan / reviewed accessible elements including components of a transfer shower | BOBF | BOBF | | BSP | P | 6578359 |
DANIEL-BARRY CONSTRUCTION INC | BFR | C | 05/20/2020 | First floor framing OK pending all other required inspections / Training with Bob F / Reviewed elements of accessibility, including transfer showers as well as metal stud framing and separation of occupancies | ADAML | ADAML | | BFR | C | 6578347 |
DANIEL-BARRY CONSTRUCTION INC | BIN | P | 05/20/2020 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6577507 |
DANIEL-BARRY CONSTRUCTION INC | BFT | R | 04/03/2020 | footing and pads okay, need open hole / Authorized 3rd party engineer inspection with all observation paperwork to follow / | BOBF | BOBF | | BFT | R | 6530706 |
FOSTER ELECTRIC CORPORATION | E= | C | 10/08/2020 | | LOGANP | LOGANP | | E= | C | 6734969 |
FOSTER ELECTRIC CORPORATION | E= | P | 10/07/2020 | need to unbond neutrals in panels A and B disconnects / disconnect for furnace / need labels on sub panels stating where they are fed from / need arc flash labels on panels A and B / need label at service disconnect stating alternate power source generator and location | TIMA | TIMA | | E= | P | 6733379 |
FOSTER ELECTRIC CORPORATION | EP | P | 09/16/2020 | need to install sealing locknut on water gec conduit at service disconnect / need aic rating for transfer switch to verify works with fuses installed or install type fuses on name plate / panel C ok still need to look at panels A and B also need to verify generator has prime mover disconnect | TIMA | TIMA | | EP | P | 6708138 |
FOSTER ELECTRIC CORPORATION | ES | C | 09/16/2020 | Commercial Service: 250 amp 4/w ok to energize | TIMA | TIMA | | ES | C | 6708129 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/04/2020 | above ceiling in hallway and living quarters -------- 2 plugs added ok | CRAIG | CRAIG | | ER | P | 6697426 |
FOSTER ELECTRIC CORPORATION | ER | P | 07/16/2020 | living quarters rooms and halls ok------CONTRACTOR TO ADD 2 RECEPTS IN LARGE LIVING QUARTER WILL HAVE PICS OF INSTALL--- | TIMA | TIMA | | ER | P | 6640192 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/12/2020 | ko plug and ring pic ok | TIMA | TIMA | | ER | P | 6567954 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/11/2020 | partial hard lid / see plans in office trailer / | BRIAN | BRIAN | | ER | P | 6567558 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/23/2020 | interior remodel area walls ok-----discussed ada requirements | TIMA | TIMA | | ER | P | 6549785 |
FOSTER ELECTRIC CORPORATION | EUG | P | 04/03/2020 | ufer ok | TIMA | TIMA | | EUG | P | 6531157 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 12/21/2020 | CORRECTIONS MADE. SEE IMAGES. | LIDO | LIDO | | H= | C | 6814349 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 12/08/2020 | No site visit - contractor will provide picture of correction per call ahead. | MARKB | MARKB | | H= | P | 6800968 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 12/07/2020 | Correction made, see images / | MARKB | MARKB | | H= | C | 6798097 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | L | 11/17/2020 | NO ladder set up. Contractor to attach picture of old furnace vent capped off to next inspection request. | MARKB | MARKB | | H= | L | 6778799 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 11/17/2020 | ENGINEER APPROVED TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | P | 6778484 |
LANDMARK PLUMBING AND HEATING, INC. | HV | C | 10/14/2020 | FOR FINAL - Complete condensate piping to floor sink - currently just has flex pipe on it pointed up in the air. WATER HEATER VENT COMPLETE | MARKB | MARKB | | HV | C | 6740663 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 10/08/2020 | FINAL PENDING - Cap off old unused furnace vent in attic and provide test and balance report. PER REFRIGERATION CALC'S PROVIDED IN PLAN SPLICE FOR SMALLEST ROOM, REFRIGERATION QUANTITIES ARE BELOW ALLOWABLE AMOUNTS. REFRIGERATION PIPING INSULATION AND CONDENSATE PIPING COMPLETE. ALL THERMOSTATS ARE COMPLETE. | MARKB | MARKB | | H= | P | 6734653 |
PEAK HEATING & AIR CONDITIONING, INC. | HRP | P | 10/02/2020 | ----Still need refrigeration calc's spliced into plans---- Need to complete insulation on refrigeration piping - will need ceiling tile removed next to each FCU for next inspection. Need condensate piping completed for F-1 & coil. Install all thermostats. Provide test and balance report. | MARKB | MARKB | | HRP | P | 6727668 |
PEAK HEATING & AIR CONDITIONING, INC. | HV | C | 10/02/2020 | Still need a contractor to claim water heater and water heater vent. FURNACE VENT COMPLETE | MARKB | MARKB | | HV | C | 6727667 |
LANDMARK PLUMBING AND HEATING, INC. | H= | R | 10/01/2020 | Need contractor to claim water heater and water heater vent. Will need vent inspection and manufacturer instructions with access to attic provided at time of inspection. Water heater was relocated. FINAL GAS CONNECTIONS TO EQUIPMENT COMPLETE. | MARKB | MARKB | | H= | R | 6726343 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 10/01/2020 | DIFFUSERS COMPLETE. | MARKB | MARKB | | HD | P | 6726327 |
PEAK HEATING & AIR CONDITIONING, INC. | HSP | P | 10/01/2020 | NOT READY FOR FINAL - Still need refrigeration calc's spliced into plan and supply removed off plans for fcu. Need furnace vent inspection with manufacturer instructions and access provided to attic at time of inspection. Need to complete refrigeration line insulation and label equipment. Will to provide test and balance report. | MARKB | MARKB | | HSP | P | 6726324 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 09/29/2020 | ADDING LOAD TO METER PER PLAN. | MARKB | MARKB | | HC | C | 6722800 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 09/29/2020 | 10 PSI PRESSURE TEST AND PIPING PER PLAN. Still need connection to new generator. | MARKB | MARKB | | HI | C | 6722799 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 09/28/2020 | LOW TEST. 11/4" PIPING NEEDS TO EXTEND TO WATER HEATER AS NOTED ON PLANS. PIPING COMPLETED TO GENERATOR IS PER PLAN. | MARKB | MARKB | | HI | P | 6721412 |
PEAK HEATING & AIR CONDITIONING, INC. | HRP | P | 09/23/2020 | 350 PSI PRESSURE TEST ON REFRIGERATION LINE FOR CU-1 CONNECTED TO COIL AT F-1 OK TO INSULATE. | MARKB | MARKB | | HRP | P | 6716095 |
PEAK HEATING & AIR CONDITIONING, INC. | HSP | P | 09/23/2020 | AFTER DISCUSSION WITH JON B. (SENIOR MECHANICAL INSPECTOR), JUSTIN C. & DALE H. (MECHANICAL PLAN REVIEW) - REFRIGERATION CALCULATIONS WILL BE REQUIRED FOR SINGLE ZONE VRF SYSTEM IN SLEEPING QUARTERS BASED ON SMALLEST ROOM TO DETERMINE IF REFRIGERATION ALARMS ARE REQUIRED. PER NOTE ON PLANS, ENGINEER SAYS REFRIGERATION CALC'S ARE ON PLAN SHEET M6.1 BUT CANNOT FIND CALC'S ON M6.1 OF APPROVED PLAN SET. SPOKE WITH SUPERINTENDENT FOR DANIEL-BARRY ON SITE. | MARKB | MARKB | | HSP | P | 6716093 |
PEAK HEATING & AIR CONDITIONING, INC. | HRP | P | 09/18/2020 | ----Further research required for weather or not refrigeration calc's will be required ---- 300 PSI PRESSURE TEST WITH HEAT PUMP AND FCU'S 1- 8 CONNECTED OK. Still need to complete insulation and outside air to FCU-6. | MARKB | MARKB | | HRP | P | 6710939 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/18/2020 | ----Who is claiming water heater vent, PEAK has 2 vents & a furnace replacement with vent on their scope but LANDMARK installed the water heater vent?---- SUPPLY/RETURN TRUNK LINES FOR F-1 IN ATTIC DOWN TO FURNACE NEW LOCATION IN MAIN FLOOR CLOSET COMPLETE. Still need outside air ducts installed. | MARKB | MARKB | | HD | P | 6710906 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 07/14/2020 | 10 PSI PRESSURE TEST ON NEW 2.5" GAS LINE FROM METER LOCATION TO EXTERIOR SOUTH WALL OK. Still need to pressure test from exterior wall to generator location, complete support and sleeves through concrete walls. | MARKB | MARKB | | HI | P | 6636362 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 10/02/2020 | | SAMH | SAMH | | P= | C | 6727627 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 04/08/2020 | Water main complete. | SAMH | SAMH | | PB | C | 6534940 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 04/08/2020 | Verify ceiling insulation and check Water heater at final. Note: Discussed Accessible elements with contractor. | SAMH | SAMH | | PTO | C | 6534933 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 10/02/2020 | PAID (REC#1718343): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Added refrigeration calculations | JUSTINC | JUSTINC | | XMS | T | 6728292 |