COLARELLI CONSTRUCTION, INC. | B= | C | 02/24/2021 | | JOHN | JOHN | | B= | C | 6879849 |
COLARELLI CONSTRUCTION, INC. | B= | P | 08/21/2020 | County fire final on file / Complete MEP final inspections / Complete zoning final -- Schedule a new Building Final when above items are complete. | TIMOTHYS | TIMOTHYS | | B= | P | 6681215 |
COLARELLI CONSTRUCTION, INC. | B= | R | 08/20/2020 | Complete MEP final inspections / Complete zoning final inspection / Provide proof of county fire final inspection approval | TIMOTHYS | TIMOTHYS | | B= | R | 6679424 |
COLARELLI CONSTRUCTION, INC. | B= | R | 06/30/2020 | Complete MEP finals / Complete zoning final / Missing door hardware at vestibule, green room bathroom / Need landing outside new green room egress door. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, MORNING STAR ELEVATOR, LLC. Mechanical Final Inspection is not Completed yet, RYBA ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | R | 6622094 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 05/28/2020 | Rock and rock attachment for green room and bathroom vestibule drop ceiling ok | TIMOTHYS | TIMOTHYS | | BFR | P | 6585485 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 05/26/2020 | Green room ceiling framing ok / Vestibule ceiling framing ok | TIMOTHYS | TIMOTHYS | | BFR | P | 6582698 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/29/2020 | Above ceiling fireblocking at restrooms ok / Grid ceiling backstage ok / Received stamped RFI approving as built framing conditions for Damper opening North wall | TIMOTHYS | TIMOTHYS | | BFR | P | 6555416 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/23/2020 | Screw pattern at metal stage decking ok prior to concrete | TIMOTHYS | TIMOTHYS | | BFR | P | 6549685 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/20/2020 | Rock and rock attachment at stage support walls ok | TIMOTHYS | TIMOTHYS | | BFR | P | 6545123 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/17/2020 | Rock and rock attachment ok WP1072 stage walls and locker rooms / Grab bar backing for back stage restroom ok / Will need to inspect firestopping of through penetrations of WP1072 locker room walls | TIMOTHYS | TIMOTHYS | | BFR | P | 6543697 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 04/13/2020 | Locker room GA WP 1072 walls not screwed per listing / Stage GA WP 1072 wall screw pattern not ready for reinspection | TIMOTHYS | TIMOTHYS | | BSP | P | 6538660 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/13/2020 | Light gauge steel framing ok backstage / Light gauge steel framing ok under stage 1hr fire resistance rated walls / Still need grab bar backing in backstage restroom | TIMOTHYS | TIMOTHYS | | BFR | P | 6538651 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 04/10/2020 | GA WP 1072 walls not screwed per listing / Framing for exterior HVAC opening per RFI / RFI not accepted in field without engineers stamp, pending, can be covered | TIMOTHYS | TIMOTHYS | | BSP | P | 6537601 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/03/2020 | Partial frame inspection / Provide grab bar backing at backstage restroom / Stairs and lift not installed at this time / Light gauge steel framing and Rock and rock attachment ok 1 side fire barrier at stage / Light gauge steel framing and Rock and rock attachment ok 1 side at fire partition at common hall / Sanctuary sound booth pony wall light gauge steel framing ok / Discussed accessible elements | TIMOTHYS | TIMOTHYS | | BFR | P | 6530845 |
RYBA ELECTRIC, INC. | E= | C | 08/25/2020 | | JOHNN | JOHNN | | E= | C | 6684087 |
RYBA ELECTRIC, INC. | E= | P | 08/21/2020 | incorrect owner name on permit as stated in previous notes/ | JOHNN | JOHNN | | E= | P | 6680833 |
RYBA ELECTRIC, INC. | E= | P | 06/12/2020 | still need to splice plan, rest is ok, | JOHNN | JOHNN | | E= | P | 6603545 |
RYBA ELECTRIC, INC. | E= | P | 06/09/2020 | remove all unused outlets on RTU'S, install WR blank plates/ wrench tight all connections to RTU'S/ splice plan: panel E moved to back, lighting change, see notes from 3/17/20, existing sanctuary lights remain/ label RTU'S per plan with UV labels/ units are 60 amp/ | JOHNN | JOHNN | | E= | P | 6598772 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 05/26/2020 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 6583388 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 05/26/2020 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | ER | C | 6583386 |
RYBA ELECTRIC, INC. | ER | C | 05/26/2020 | hard lids in vestibule and green rm/ CHECK HWH in above green rm lid on final/ | JOHNN | JOHNN | | ER | C | 6583385 |
RYBA ELECTRIC, INC. | ER | P | 04/16/2020 | under stage,ok | JOHNN | JOHNN | | ER | P | 6543256 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 04/03/2020 | FIRE ALARM INSPECTION: walls,ok | JOHNN | JOHNN | | ER | P | 6531203 |
RYBA ELECTRIC, INC. | ER | P | 04/02/2020 | need correct owner on permit/ need FA permit/ Electrical wall rough ok, FA not complete,-------- do not close walls-------------- / stage floor not wired yet/ Discussed accessibility requirements with contractor / | JOHNN | JOHNN | | ER | P | 6530230 |
RYBA ELECTRIC, INC. | ESL | C | 03/24/2020 | rest of the slab inside --ok per pic / | BRIAN | BRIAN | | ESL | C | 6518964 |
RYBA ELECTRIC, INC. | ER | P | 03/17/2020 | walls marked in yellow see plans / NOTE need to verify the owner provided lights are ul listed and electrician is installing and wiring the owner provided lights // | BRIAN | BRIAN | | ER | P | 6513048 |
RYBA ELECTRIC, INC. | EUG | P | 03/17/2020 | outside panel feeders --ok / inside partial panel feeder --see plans / | BRIAN | BRIAN | | EUG | P | 6513047 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 09/15/2020 | | JERRYF | JERRYF | | H= | C | 6706086 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 09/15/2020 | OK TO RELEASE 2# METER | JERRYF | JERRYF | | HC | C | 6706085 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 09/15/2020 | ALL REGULATORS / VENTS AND LABELS ARE COMPLETE - REVISED PLAN SPLICE IS COMPLETE | JERRYF | JERRYF | | HI | C | 6706084 |
HVAC SOLUTIONS, INC. | H= | C | 09/14/2020 | ALL CORRECTIONS MADE | JERRYF | JERRYF | | H= | C | 6704738 |
HVAC SOLUTIONS, INC. | H= | P | 08/24/2020 | NEED CONTRACTOR TO VERIFY ACCESS TO SMOKE SHUTDOWN - NEED TO WEATHER PROTECT SMOKE SHUTDOWN - NEED TO PROPERLY COUNTER FLASH AND SEAL EXTERIOR DUCT PENETRATIONS AT WALL - COMPLETE ALL CONDENSATE DRAINS PER INSTALL MANUAL DETAIL - ALL WORK WILL REQUIRE ONSITE INSPECTION NOTES: FLUE EXTENSIONS AND CLEARANCES BETWEEN RTU'S OK | JERRYF | JERRYF | | H= | P | 6682340 |
HVAC SOLUTIONS, INC. | H= | P | 08/21/2020 | NEED FURTHER RESEARCH ON SMOKE SHUTDOWN SERVICE ACCESS IF OK SMOKE SHUT DOWN WILL NEED TO BE WEATHER PROTECTED - SERVICE ACCESS AT ALL RTU'S - FLUE EXHAUST LOCATION CLEARANCE TO ECONOMIZERS - COMPLETE ALL CONDENSATE DRAINS PER INSTALL MANUAL - SEAL DUCT OPENINGS IN EXTERIOR WALL | JERRYF | JERRYF | | H= | P | 6681481 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 08/21/2020 | SEE HI NOTES | JERRYF | JERRYF | | H= | P | 6681480 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 08/21/2020 | PARTIAL PENDING 2# APPROVAL LETTER FOR BLACK HILLS NOTES: ALL PIPING / REGULATORS / VENTS AND LABELS ARE COMPLETE | JERRYF | JERRYF | | HI | P | 6681479 |
HVAC SOLUTIONS, INC. | H= | P | 08/21/2020 | TAB REPORT WAS ATTACHED TO THIS INSPECTION REQUEST / TAB REPORT HAS ALREADY BEEN ENTERED INTO SYSTEM - NEED TO ADDRESS OTHER ITEMS / WILL NEED SITE VISIT / ALREADY RESCHEDULED FOR TODAY 8 / 21 | JERRYF | JERRYF | | H= | P | 6680700 |
MORNING STAR ELEVATOR, LLC. | HE= | C | 08/19/2020 | GARAVENTA VPL -- SREW DRIVE -- 10 FPM -- 750 LBS | RANDYB | RANDYB | | HE= | C | 6678799 |
HVAC SOLUTIONS, INC. | H= | P | 06/29/2020 | NEED RTU INSTALLATION INSTRUCTIONS TO VERIFY RTU SPACING AND VENTING, NOTICED RTU EXHAUST IS NOT 3 FEET HIGHER THAN ECONOMISER, TALKED JERRY HE SAID THERE IS SUPPOSED SPLICE IN AND COULD NOT THAT | BENH | BENH | | H= | P | 6620566 |
HVAC SOLUTIONS, INC. | H= | P | 06/26/2020 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 6618446 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 05/21/2020 | PLANS SHOW LOW PRESSURE ON EXISTING GAS LINE TO RTU's-- CONTRACTOR TO SUBMIT PLAN SPLICE FOR A MEDIUM PRESSURE SYSTEM AND 2# LETTER FROM GAS PURVEYOR, MEDIUM PRESSURE STICKERS AT ALL VISIBLE LOCATIONS ON GAS LINES PRIOR TO EXISTING MAIN INLET INTO STRUCTURE. (10 lb.test ok Note / all outside gas line supports and regulators to RTU's ok. | PAULO | PAULO | | HI | P | 6579787 |
LANDMARK PLUMBING AND HEATING, INC. | HI | R | 05/20/2020 | NOT READY | DAVIDH | DAVIDH | | HI | R | 6577988 |
HVAC SOLUTIONS, INC. | HD | R | 04/27/2020 | ENGINEER / ARCHITECT NEEDS TO SUPPLY DESIGN DETAIL FOR SUPPORTING BOTH LARGE DAMPERS INDIVIDUALLY - DAMPER INSTALL MANUAL DESIGN REQUIRES DOUBLE KING STUDS WHEN DAMPERS ARE OVER 36" WIDE - AT THIS TIME THERE IS 1 LARGE OPENING FOR BOTH DAMPERS TO STACK ONE ON TOP OF THE OTHER AND NO DOUBLE KING STUDS - STOPPED INSPECTION NOTES: OTHER 2 DAMPERS AND RETAINAGE ARE OK AT STAGE AREA | JERRYF | JERRYF | | HD | R | 6552427 |
HVAC SOLUTIONS, INC. | HSP | P | 04/23/2020 | HAD CONSULT WITH LUKE FROM HVAC ON STACKED FIRE DAMPER FRAMING AT EXTERIOR WALL NEED SHEET ROCK | JERRYF | JERRYF | | HSP | P | 6549364 |
HVAC SOLUTIONS, INC. | HD | P | 03/17/2020 | NEED THE FOLLOWING - PLAN REVISION FOR SA / RA FIRE SMOKE DAMPERS AT EXTERIOR WHERE PLAN SHOWS SIDE BY SIDE MOUNTING AND INSTALLED WILL BE STACKED 9(NEED ENGINEER TO ADDRESS DAMPER SUPPORT BETWEEN DAMPERS / NEED DAMPER OPENINGS FRAMED CORRECTLY AND SHEET ROCK REMOVED TO VERIFY AT EXTERIOR DAMPER OPENINGS - SA DAMPER LINKAGE IS PINCHED AT STORAGE ROOM OPENING (NEED TO CORRECT) STILL NEED SA AND TRANSFER DAMPER FRAMING AT GREEN ROOM AREA - STOPPED INSPECTION NOTES: TRANSFER DAMPER OPENING OK AT STORAGE | JERRYF | JERRYF | | HD | P | 6513094 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/26/2020 | | SAMH | SAMH | | P= | C | 6618778 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 04/02/2020 | Verify insulation and Water heater at final. | SAMH | SAMH | | PTO | C | 6529623 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 03/19/2020 | | SAMH | SAMH | | PB | C | 6515788 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 07/02/2020 | PAID (REC#1693365): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 6625535 |
RYBA ELECTRIC, INC. | XES | P | 06/30/2020 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revise lighting | SHELBY | SHELBY | | XES | P | 6621520 |
COLARELLI CONSTRUCTION, INC. | XBS | P | 06/05/2020 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Clarify location of column and accessibility to door | MICHAELA | MICHAELA | | XBS | P | 6594955 |