THOMAS GENERAL CONTRACTORS, INC. | B= | C | 09/04/2020 | | NATHAN | NATHAN | | B= | C | 6697929 |
THOMAS GENERAL CONTRACTORS, INC. | B= | T | 07/28/2020 | PAID (REC#1699909): TCO. Additional Inspections Required (computer generated): ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet. | GITA | GITA | | B= | T | 6652832 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 07/28/2020 | Temp CO: all final inspections are complete B= and H= are partialed ( Expires: 8/27/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6652829 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 07/24/2020 | With completed required inspections and completed core shell permit B= okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6649439 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 07/07/2020 | final was for brewery side only / still need fire and plumb to perform first time final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, DILLER ELECTRIC Electrical Final Inspection is not Completed yet, ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet, PRESTIGE MECHANICAL CONTRACTORS,INC Mechanical Final Inspection is not Completed yet, PRESTIGE MECHANICAL CONTRACTORS,INC Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6628553 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/20/2020 | interior frame okay with completed required inspections | NATHAN | NATHAN | | BFR | P | 6578277 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 04/29/2020 | Reviewed Accessible Elements, with completed required inspections and structural observation letters frame okay, | NATHAN | NATHAN | | BFR | P | 6555844 |
DILLER ELECTRIC LLC | E= | C | 07/16/2020 | | BRIAN | BRIAN | | E= | C | 6639375 |
DILLER ELECTRIC LLC | E= | P | 07/13/2020 | still need two screws on the devices in the industrial covers / need label on mua stating where the fuse is located / panel filler / testing of gfci breakers / 15 amp an dishwasher / | BRIAN | BRIAN | | E= | P | 6634746 |
DILLER ELECTRIC LLC | E= | P | 06/30/2020 | still need the gfci protection and rk-5 fuses on mua / | BRIAN | BRIAN | | E= | P | 6622055 |
DILLER ELECTRIC LLC | E= | P | 06/25/2020 | need service outlet at mua / need fused disconnect with rk-5 fuses for MUA and maybe the chiller / need gfci protection for the outlets in the batch area per the plans / need 15 amp breaker for the dishwasher / need 2 mounting screws for the devices in industrial covers / need the plans spliced to show the bar lights as future not the house keeping lights / need gfci on outlets 6' from sink / need WR rated outlets outside / | BRIAN | BRIAN | | E= | P | 6617341 |
DILLER ELECTRIC LLC | E= | R | 06/12/2020 | can not use non listed light over the bar/ need label manufactures label on the dishwasher to verify amps / wire size / ---need 2 screws installed to hold the device on industrial covers / need gfci on any outlet with in 6' of sink at bar /need the exit , em lights up and working / | BRIAN | BRIAN | | E= | R | 6603313 |
DILLER ELECTRIC LLC | ER | P | 06/09/2020 | panel wall upstairs--ok / | BRIAN | BRIAN | | ER | P | 6598164 |
DILLER ELECTRIC LLC | ER | P | 05/05/2020 | stair way wall and exterior wall to patio---ok / | BRIAN | BRIAN | | ER | P | 6560795 |
DILLER ELECTRIC LLC | ER | P | 04/28/2020 | both bars--ok / | BRIAN | BRIAN | | ER | P | 6553693 |
DILLER ELECTRIC LLC | ER | P | 04/21/2020 | kitchen /prep area --ok / walls and hard lid | BRIAN | BRIAN | | ER | P | 6546233 |
DILLER ELECTRIC LLC | EUG | C | 04/01/2020 | front half of suit 100 / | BRIAN | BRIAN | | EUG | C | 6527770 |
DILLER ELECTRIC LLC | ESL | P | 03/26/2020 | back half of suit 100---ok | BRIAN | BRIAN | | ESL | P | 6522140 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 09/03/2020 | PERMIT CORRECTION MADE NOTES: SMOKE SHUTDOWN MONITORED BY FIRE PANEL | JERRYF | JERRYF | | H= | C | 6695687 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 08/31/2020 | PARTIAL PENDING SOMEONE CLAIMING 2 TUBE HEATERS ON ROOF PER SEVERAL PREVIOUS NOTES NOTES: NO ALARMS REQUIRED - WALK I N COOLER DRAIN IS COMPLETE | JERRYF | JERRYF | | H= | P | 6691293 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 08/12/2020 | UNABLE TO VIEW PLAN REFRIGERATION FOR WALK IN COOLER - NEED DRAIN COMPLETED AT WALK IN - SOMEONE TO CLAIM TUBE HEATERS ON ROOF NOTES: INTERLOCKS VERIFIED AT DISH HOOD AND ALL OTHER CORRECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6670121 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | C | 07/24/2020 | SPLICE FOR GAS AND RADIANT HEATERS IN | BENH | BENH | | HI | C | 6649192 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | C | 07/24/2020 | GAS FINAL OK | BENH | BENH | | H= | C | 6649127 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 07/20/2020 | NEED THE FOLLOWING - CORRECT WORK SCOPE TO SHOW ALL EQUIPMENT ON PLANS PER PREVIOUS NOTES - SOMEONE TO CLAIM WALK IN COOLERS AND RADIANT HEATERS ON ROOF AND CALL INSPECTIONS - INTERLOCKS VERIFIED AT DISH HOOD - SEAL DISH HOOD DUCT WORK - TAB REPORT | JERRYF | JERRYF | | H= | P | 6643302 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 07/15/2020 | NEED TO VERIFY WITH FIRE DEPARTMENT FOR POSSIBLE VENTILATION REQUIREMENTS FOR CO 2 STORAGE - NEED OTHER ITEMS ADDRESSED PER PREVIOUS NOTES NOTES: TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 6637664 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 06/25/2020 | NEED THE FOLLOWING - SOMEONE TO CLAIM WALK IN COOLER AND CALL INSPECTIONS - DUCT ACCESS DOOR AT 2ND FLOOR F/SD - ALL CONTROLS AND INTERLOCKS - COULD NOT LOCATE REFRIGERATION CALCS ON PLAN - TAB REPORT | JERRYF | JERRYF | | H= | P | 6617714 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HV | C | 06/22/2020 | 1 WATER HEATER VENT OK | JERRYF | JERRYF | | HV | C | 6612580 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | P | 06/22/2020 | PRESSURE TESTS OK - NEED PLAN BEFORE METER RELEASE FOR PIPING ON ROOF WHERE PLAN SHOWS 4 HEATERS - WHERE 2 ARE BEING INSTALLED -STILL NEED FINAL CONNECTIONS / REGULATORS AND VENTS - 2# APPROVAL LETTER FROM CSU - NEED VENT INSTALLED AT MUA GAS REGULATOR | JERRYF | JERRYF | | HI | P | 6612573 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 06/11/2020 | NEED PLAN REVISION FOR THE FOLLOWING - 2ND B VENT AT KETTLE - STANDARD METAL SPIRAL SUPPLY DUCT WHERE PLAN SHOWS 16 GAUGE AT FRONT OF BUILDING (CONTRACTOR PROCEEDING AT OWN RISK) - NEED 1" CLEARANCE TO B VENT AT KETTLE - CORRECT PERMIT WORK SCOPE TO SHOW ALL WORK BEING INSTALLED - STOPPED INSPECTION NOTES: MUA DUCT IN PRODUCTION AREA OK | JERRYF | JERRYF | | HD | P | 6601161 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 05/27/2020 | SECOND FLOOR FIRE SMOKE DAMPER GAP / RETAINAGE OK - STILL NEED DUCT ACCESS DOOR | JERRYF | JERRYF | | HD | P | 6584606 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 05/20/2020 | 2ND FLOOR FIRE SMOKE DAMPER SLEEVE OK PER INSTALL MANUAL SUPPLEMENT - AT FUTURE INSPECTION VERIFY SLEEVE EXTENSION IS PROPERLY SEALED | JERRYF | JERRYF | | HD | P | 6578091 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 05/19/2020 | THIS INSPECTION WAS FOR SECOND FLOOR FIRE DAMPER AT RESTROOM - COULD NOT FIND IN MANUAL WHERE IT IS APPROVED TO EXTEND SLEEVE - IF ALLOWED WILL NEED TO VERIFY EXTENSION CONNECTION | JERRYF | JERRYF | | HD | P | 6576722 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | C | 07/24/2020 | Image of RP before brewing equipment uploaded from contractor. | DANR | DANR | | P= | C | 6648635 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 07/17/2020 | Need backflow protection before brew equipment / rest of corrections. | DANR | DANR | | P= | P | 6640844 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 07/14/2020 | Need to expose all AAV's / need backflow protection per drawing / need backflow for MAU water supply or show backflow protection at unit / need to RFI backflow protection before brewing equipment / rest ok. | DANR | DANR | | P= | P | 6636244 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | C | 07/14/2020 | Ok. | DANR | DANR | | PTO | C | 6636240 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | P | 05/06/2020 | Upper level Bar and Restrooms. Still need to inspect Sanitary tie in below restrooms, and Mechanical room. | SAMH | SAMH | | PTO | P | 6563336 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | P | 04/28/2020 | Kitchen and bar area ok to above kitchen ceiling. Overhead Water mains ok to mechanical room. Still need upper level inspection, Mechanical room, Vent penetration. and Insulation. Note: AAV at bar sinks. | SAMH | SAMH | | PTO | P | 6554577 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB | P | 03/23/2020 | Complete pending plan splice to delete 1 floor sink, and 2 HS1. Cover at own risk. | SAMH | SAMH | | PB | P | 6518748 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | XMS | T | 08/12/2020 | PAID (REC#1707617): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Added refrigeration calculations | JUSTINC | JUSTINC | | XMS | T | 6669886 |
DILLER ELECTRIC LLC | XES | P | 06/24/2020 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revised lighting | SHELBY | SHELBY | | XES | P | 6615128 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | XMS | T | 06/19/2020 | PAID (REC#1691103): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Relocated water heater, revised gas, revised layout | JUSTINC | JUSTINC | | XMS | T | 6611463 |