MARK YOUNG CONSTRUCTION, INC. | B= | C | 04/21/2021 | | JUSTINL | JUSTINL | | B= | C | 6941672 |
MARK YOUNG CONSTRUCTION, INC. | B= | P | 02/19/2021 | Rear mens restroom accessible stall < 60" turn radius (59 1/2") // Rest of building final OK. -- Schedule a new Building Final when above items are complete. | CHUCK | CHUCK | | B= | P | 6874905 |
MARK YOUNG CONSTRUCTION, INC. | BE | C | 01/13/2021 | | TERRI | TERRI | | BE | C | 6834003 |
MARK YOUNG CONSTRUCTION, INC. | BFR | P | 07/21/2020 | New light gauge framed wall at alcove 163 and in mothers rooms OK -- Reviewed accessible elements in mothers rooms -- New partition at mop sink not ready -- Pending other roughs | DAKOTAB | DAKOTAB | | BFR | P | 6644303 |
THOR'S HAMMER, INC. | E= | C | 12/18/2020 | | JOSEPH | JOSEPH | | E= | C | 6812900 |
THOR'S HAMMER, INC. | E= | P | 11/13/2020 | Bakery ceiling good / New lighting in N.E. corner over Meats and Vegetables good / Consultation for how to amend plans. ? Helpful Links for Plan Submittals Full link - https://www.pprbd.org/File/Resources/Downloads/ResidentialHandout/Helpful%20Plan%20Submittal%20Links%209-14-20.pdf ? How-To Tutorials for E-Plans Full link - https://www.pprbd.org/File/Resources/Downloads/ResidentialHandout/How%20To%20Tutorials%20for%20E-Plan%20Submittal.pdf ? E-Plan Terminology and Flow Chart Full link - https://www.pprbd.org/File/Resources/Downloads/ResidentialHandout/Electronic%20Plan%20Flow%20Chart.pdf ? Electronic Plan Submittal Tips Full Link - https://www.pprbd.org/File/Resources/Downloads/ResidentialHandout/Electronic%20Plan%20Submittal%20Tips%202.pdf ? Electronic Plan Review Process Full link - https://www.pprbd.org/Downloads/Other/ElectronicPlanReview.pdf VIDEOS ? How To Submit An Electronic Plan - VIDEO Full link https://youtu.be/-R4mAh8LBCM ? How To Submit a Splice - VIDEO Full link – https://youtu.be/dG3kHpgDP0w ? How to Upload Photos for an Inspection https://youtu.be/QS0hdGSBA6o ? PPRBD Updated Dashboard Tutorial Video https://youtu.be/Y1Zv_z7EzQw
| JOSEPH | JOSEPH | | E= | P | 6775943 |
THOR'S HAMMER, INC. | E= | P | 10/27/2020 | Inspected bakery ceiling, Lights need ceiling wires and 4 clips or 2 screws, also need to strap MC cables going to lights. / Inspected front bathrooms, need breaker locks for hand dryers. / I explained to electrician on site that plans need to be amended to reflect the work that was done only. | JOSEPH | JOSEPH | | E= | P | 6755352 |
THOR'S HAMMER, INC. | E= | P | 08/06/2020 | I inspected the mother's room, rear bathrooms, break room and lights in garden center only -------------- need cover plate on 4 sq box in bath ceiling by access door--------- rough inspections not called for any work other then mothers room------------ need plans spliced removing any work not performed | MATTHEW | MATTHEW | | E= | P | 6663185 |
THOR'S HAMMER, INC. | ER | C | 07/22/2020 | ER OK ---- MOTHERS ROOM ----- | GREGM | GREGM | | ER | C | 6646627 |
TDR CONTRACTORS, INC. | H= | C | 12/15/2020 | Test and balance report received. see images/ | LIDO | LIDO | | H= | C | 6808034 |
TDR CONTRACTORS, INC. | H= | P | 12/04/2020 | ALL ABOVE CEILING ROUGH DUCT, FLEX DUCT, GRILLS AND THERMOSTAT / SENSORS OK / FINAL PENDING :TEST AND BALANCE REPORT IS MISSING ADDRESS. NEED REVISED BALANCE REPORT / | LIDO | LIDO | | H= | P | 6797846 |
TDR CONTRACTORS, INC. | H= | P | 11/28/2020 | FINAL PENDING :TEST AND BALANCE REPORT IS MISSING ADDRESS. NEED REVISED BALANCE REPORT / NEED ABOVE CEILING ROUGH DUCT INSPECTION AND FINAL INSPECTION FOR GRILLS AND THERMOSTATS INSIDE BUILDING. COMMUNICATE THIS TO MECHANICAL CONTRACTOR RHONDA FROM TDR CONTRACTORS INC / ROOF OK PER INSPECTION DATED 10/30/20 / | LIDO | LIDO | | H= | P | 6789799 |
TDR CONTRACTORS, INC. | H= | P | 11/10/2020 | NOW ABLE TO VIEW PLAN PAGE M1.1 FROM PERMIT / COMMUNICATED WITH CONTRACTOR THAT A FINAL INSPECTION IS REQUIRED / FACE-TIME IS AN OPTIONS / | LIDO | LIDO | | H= | P | 6770420 |
TDR CONTRACTORS, INC. | H= | P | 10/30/2020 | UNABLE TO LOCATE PLAN PAGE M1.1. WILL GET WITH (IT) DEPARTMENT FOR PLAN PAGE RETRIEVAL. WILL UPDATE NOTES AFTER / ROOF- EF-2,8,9 AND 11 OK / STILL NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 6760628 |
TDR CONTRACTORS, INC. | H= | P | 10/26/2020 | PER CONVERSATION WITH CONTRACTOR, NO ONE ON SITE. CONTRACTOR WILL RESCHEDULE WHEN THEY CAN HAVE SOMEONE ON SITE. | LIDO | LIDO | | H= | P | 6754659 |
HUSSMANN SERVICES CORPORATION | H= | C | 08/05/2020 | ALL REFRIGERATION INSTALL AND FINAL CONNECTIONS COMPLETE / CONDENSATE DISPOSAL COMPLETE | LIDO | LIDO | | H= | C | 6662574 |
HUSSMANN SERVICES CORPORATION | HRP | P | 07/31/2020 | 2- 350LB TEST FOR F-5 AND F-6 OK ( Still need refrigeration piping install inspection when ready ) | LIDO | LIDO | | HRP | P | 6658172 |
HUSSMANN SERVICES CORPORATION | HSP | P | 07/30/2020 | CALLED CONTRACTOR MULTIPLE TIMES AND LEFT MESSAGE / UNABLE TO LOCATE CONSTRUCTION AREA IN STORE / CONTRACTOR TO RESCHEDULE / | LIDO | LIDO | | HSP | P | 6656640 |
FRONTIER MECHANICAL LLC | P= | C | 11/03/2020 | walked store checking work through out | TED | TED | | P= | C | 6763566 |
FRONTIER MECHANICAL LLC | PTO | C | 11/03/2020 | walked through store checking restrooms front and rear for replaced fixtures, check deli dept. new sink, new water heaters (2 electric at rear of store) check new pvb installed at mop sinksoe bibb at produce case | TED | TED | | PTO | C | 6763563 |
FRONTIER MECHANICAL LLC | P= | L | 11/02/2020 | both call ahead contacts did not know about the inspection or could not be on site, need to recall inspection and have someone on site to walk inspector through inspection, there has only been a base inspection in deli | TED | TED | | P= | L | 6761006 |
FRONTIER MECHANICAL LLC | PB | P | 07/15/2020 | base in deli for new hand sink, test and design ok | TED | TED | | PB | P | 6638547 |
THOR'S HAMMER, INC. | XES | T | 10/19/2020 | PAID (REC#1724074): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power - added restroom scope - revised panel schedules. | BERTHA | BERTHA | | XES | T | 6745542 |
FRONTIER MECHANICAL LLC | XPS | T | 07/08/2020 | PAID (REC#1695752): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 1, 2 revisions: P1 adjusted overall plumbing plan, P1.1 adjusted enlarged plumbing plans, P2 adjusted plumbing details, P3 adjusted plumbing schedules | SHANEN | SHANEN | | XPS | T | 6630416 |
MARK YOUNG CONSTRUCTION, INC. | XBS | T | 07/08/2020 | PAID (REC#1695591): PLAN SPLICE FEE: $50 by: DANM for Construction: Various revisions throughout | DANM | DANM | | XBS | T | 6629672 |
MARK YOUNG CONSTRUCTION, INC. | XBS | T | 05/04/2020 | PAID (REC#1682442): PLAN SPLICE FEE: $50 by: DANM for Construction: Various minor revisions | DANM | DANM | | XBS | T | 6559424 |