NUNN CONSTRUCTION, INC. | B= | C | 01/13/2021 | All required final inspection paperwork on file. | NATHAN | NATHAN | | B= | C | 6834012 |
NUNN CONSTRUCTION, INC. | B= | P | 12/17/2020 | We are still missing the state electric permit -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6811023 |
NUNN CONSTRUCTION, INC. | B= | P | 09/30/2020 | state plumbing completed permit attached. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6723871 |
NUNN CONSTRUCTION, INC. | B= | P | 08/18/2020 | images did not attach please email to nathan@pprbd.org. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6675880 |
NUNN CONSTRUCTION, INC. | B= | P | 08/14/2020 | site visit not needed email or upload electric and plumbing verification letters, complete all final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6673735 |
NUNN CONSTRUCTION, INC. | B= | P | 07/31/2020 | need state elec and plumb finals completed, need to complete mech finals, rest of building okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6657587 |
NUNN CONSTRUCTION, INC. | BFR | P | 07/22/2020 | soffit framing at rooms, 405, 511, 513 | NATHAN | NATHAN | | BFR | P | 6646147 |
NUNN CONSTRUCTION, INC. | BSP | P | 07/09/2020 | request was for penetration protection at west walls of rooms 301 and 302, walls are not rated, no inspection required but are okay | BOBF | BOBF | | BSP | P | 6631719 |
NUNN CONSTRUCTION, INC. | BFR | P | 07/08/2020 | pending other required inspections, wall framing for boys and girls restrooms, rooms 301 and 302 okay | BOBF | BOBF | | BFR | P | 6630356 |
NUNN CONSTRUCTION, INC. | BFR | P | 06/02/2020 | This is a 2015 IEBC Level 2 alteration, frame at roos 422, 427, 410, 311C, 316 okay with completed required inspections, discussed rated assemblies and needing details for corridor ceiling and fire walls, | NATHAN | NATHAN | | BFR | P | 6590127 |
PIPE LINE SPECIALTIES INC. | H= | C | 01/07/2021 | ENGINEER APPROVAL LETTER FOR TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6827952 |
PIPE LINE SPECIALTIES INC. | H= | P | 08/31/2020 | REJECTED TAB REPORT - SEVERAL READINGS OUTSIDE +/- 10% THROUGH TAB REPORT - MISSING READINGS AT ERV - 6 GRILLE #9 - MISSING READING AT ERV - 4 GRILLE #3 - NEED REVISED TAB REPORT OR STAMPED APPROVED LETTER FROM ENGINEER APPROVING THIS TAB REPORT - IF NEW TAB IS SUBMITTED CONTRACTOR NEEDS TO REVIEW NEW TAB REPORT BEFORE SUBMITTING TAB REPORT | JERRYF | JERRYF | | H= | P | 6690419 |
PIPE LINE SPECIALTIES INC. | H= | P | 08/17/2020 | UNABLE TO ACCESS REVISED PLANS IN COMPUTER - STILL NEED TO REVIEW BEFORE FINAL - NEED TAB REPORT NOTES: ENGINEER LETTERS RECEIVED FOR OVERSIZED OPENINGS AND ACCESS LETTER FOR AHU 5 AND 6 | JERRYF | JERRYF | | H= | P | 6674264 |
PIPE LINE SPECIALTIES INC. | H= | P | 08/14/2020 | UNABLE TO VIEW REVISED PLANS IN COMPUTER (WILL REVIEW MONDAY 8 / 17 AND ADD NOTES AT THAT TIME) - NEED TO REMOVE GAS FROM PERMIT WORK SCOPE PER NOTES DATED 5 / 27 / 20 - NEED TAB REPORT - ENGINEER LETTER APPROVING REDUCED SERVICE CLEARANCE AT AHU PER PREVIOUS NOTES - NEED ENGINEER DESIGN DETAIL FOR OVER SIZED FIRE DAMPER HOLES ( ATTACH LETTERS TO TAB REPORT) | JERRYF | JERRYF | | H= | P | 6673069 |
PIPE LINE SPECIALTIES INC. | H= | P | 08/03/2020 | PARTIAL FINAL PENDING THE FOLLOWING - TAB REPORT - LABEL ALL ROOF EQUIPMENT - COUNTER FLASH ALL EXHAUST FANS ON ROOF WHERE WOOD IS SHOWING - IN FILL OPEN HOLES IN FLOOR AT ERV 5 AND 6 AT SERVICE WALK WAY - NEED LETTER FROM ENGINEER APPROVING LIMITED SERVICE ACCESS TO ERV 5 - KILN INSPECTION WHEN READY - GRILLE AND RADIATION DAMPER IN CORRIDOR OUTSIDE ROOM 318 | JERRYF | JERRYF | | H= | P | 6658676 |
PIPE LINE SPECIALTIES INC. | HRP | C | 08/03/2020 | PRESSURE TESTS OK AT CONDENSERS 3 AND 4 - ALL BOILER CONDENSATE PIPING IS COMPLETE - ALL OTHER CONDENSATE PIPING IS COMPLETE | JERRYF | JERRYF | | HRP | C | 6658668 |
PIPE LINE SPECIALTIES INC. | HWP | P | 08/03/2020 | NEED TO ADD 2 RELOCATED BOILERS TO PERMIT WORK SCOPE NOTES:ALL NEAR BOILER PIPING OK | JERRYF | JERRYF | | HWP | P | 6658667 |
PIPE LINE SPECIALTIES INC. | HRP | P | 07/30/2020 | LOOKED AT ERV 1 - 4 AND AHU- 1,2,3 AND 5, ALL UNDER WORKING PRESSURE, STILL NEED TO SEE AHU-4, AND BOILER ROOM COMPLETED | BENH | BENH | | HRP | P | 6655662 |
PIPE LINE SPECIALTIES INC. | H= | P | 07/30/2020 | QUESTIONING RADIATION DAMPER BLANKETS ON REGISTERS, HAVE INSTALLATION INSTRUCTIONS AT NEXT INSPECTION, PREVIOUS WILL BE BACK MONDAY CONTRACTOR TO RECALL FINAL ON MONDAY | BENH | BENH | | H= | P | 6655656 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/28/2020 | HAD COMPUTER ISSUES PULLING UP PLANS BUT INSPECTED DUCT IN SOUTHEAST PENTHOUSE, OK TO WRAP | BENH | BENH | | HD | P | 6652509 |
PIPE LINE SPECIALTIES INC. | HV | C | 07/28/2020 | HAD COMPUTER ISSUES PULLING UP PLANS BUT INSPECTION WAS FOR 3- BOILER VENTS IN BASEMENT MECHANICAL ROOM, VENT TERMINATION OK, DID NOT LOOK AT CONDENSATE FOR BOILERS | BENH | BENH | | HV | C | 6652496 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/23/2020 | THIS INSPECTION WAS FOR AHU 1 ROOF DUCT - NEED TO WEATHER PROTECT FLEX CONNECTORS - NEED SOUTH CORRIDOR RADIATION DAMPERS AND BLANKETS - NEED RADIATION DAMPER AND BLANKET AT CORRIDOR 300 OUTSIDE ROOM 318 - ALL OTHER CORRIDOR DAMPERS AND GRILLES ARE COMPLETE | JERRYF | JERRYF | | HD | P | 6647634 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/21/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - AHU 2 RETURN PLENUM HAS BEEN ISOLATED - ALL CORRIDOR RADIATION GRILLES NEED ALL BLANKETS RESTING ON GRILLES (RE INSPECT ALL) | JERRYF | JERRYF | | HD | P | 6644655 |
PIPE LINE SPECIALTIES INC. | HD | R | 07/17/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - FIRE DAMPERS AT ROOMS 511 AND 513 - CANNOT INSPECT THESE DAMPERS WITHOUT STAMPED ENGINEERING DETAIL - DAMPER HAS LARGE BREECH ON TOP IN ROOM 511 - STOPPED INSPECTION | JERRYF | JERRYF | | HD | R | 6641037 |
PIPE LINE SPECIALTIES INC. | HSP | P | 07/15/2020 | HAD CONSULT WITH ROM FROM PLS AND G.C. ON FIRE DAMPER INSTALLATION AT ROOM 513 ( NEED ENGINEER TO SUPPLY STAMPED DESIGN DETAIL FOR CONSTRUCTION OF DAMPER SUPPORT AT OVER SIZED HOLES 0 - HAD CONSULT WITH ROM FROM PLS ON RADIATION DAMPER SUPPORT ( WILL NEED INSTALL MANUAL FOR RADIATION DAMPERS AT TIME OF INSPECTION) | JERRYF | JERRYF | | HSP | P | 6637981 |
PIPE LINE SPECIALTIES INC. | HWP | P | 07/15/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - AHU 1 HWP PIPING FROM INSIDE UNIT TO BELOW CEILING SO DUCT WORK CAN BE INSTALLED - PRESSURE TEST OK AND PIPING PER PLAN - STILL NEED TIE IN TO BUILDING SYSTEM | JERRYF | JERRYF | | HWP | P | 6637961 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/13/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - AREA'S S1 - S3 - C2 - MEZZANINE AT GYM. - ADMIN. AND CLASSROOMS - ALL GRILLES / OSA / EXHAUST CONNECTIONS ARE COMPLETE STILL NEED THE FOLLOWING - HRP INSPECTION TO VERIFY ALL LINE SET INSULATION IS COMPLETE AT ALL CEILING UNITS THROUGH OUT BUILDING (LEAVE TILES OUT FOR INSPECTION) - ROOF / SMOKE SHUTDOWN / CONTROLS / FIRE DAMPER LABELS AT DOORS AND CEILING GRID AND RETAINAGE IN CLASSROOMS - TAB REPORT - ALL REQUIRED PLAN REVISIONS | JERRYF | JERRYF | | HD | P | 6634780 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/07/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - SOUTH END CLASSROOMS AND HARD LID RESTROOMS SA / RA AND EXHAUST GRILLES AND CONNECTIONS FROM GRID LINES H THROUGH B AND 3 THROUGH 6 AND GYM FIRE DAMPER RETAINAGE AND BREAK AWAY DUCT CONNECTIONS - ALL OK | JERRYF | JERRYF | | HD | P | 6628869 |
PIPE LINE SPECIALTIES INC. | HWP | P | 07/06/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - AREA S 1 CONDENSATE DRAINS ABOVE HARD LIDS AT THE FOLLOWING CEILING UNITS - IUO4 - 13 - 15 - 14 AND 16 DRAIN PIPING AND FINAL CONNECTIONS AT UNIT DRAIN CONNECTIONS OK | JERRYF | JERRYF | | HWP | P | 6627044 |
PIPE LINE SPECIALTIES INC. | HWP | P | 07/01/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - AREA C 1 THROUGH C4 CORRIDOR - PRESSURE TEST OK AND PIPING PER PLAN - (STILL NEED INSPECTION ON ALL TIE INS TO ERV ON ROOF) | JERRYF | JERRYF | | HWP | P | 6623778 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/01/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - AREA N 1 AND N 2 - ABOVE CEILING SA / RA GRILLES AND CONNECTIONS OK - ROOM 430 MUSIC NEED ENGINEER TO ADDRESS RETURN DUCT DROP SIZING AT AHU 2 APPEARS TO BE UNDERSIZED - NEED TO ISOLATE WOOD CURB FROM RETURN PLENUM AT AHU 2 - ABOVE CEILING SA / RA GRILLES AND CONNECTIONS OK IN THE FOLLOWING ROOMS - 420 - 421 - 423 - 422 | JERRYF | JERRYF | | HD | P | 6623777 |
PIPE LINE SPECIALTIES INC. | HRP | P | 06/30/2020 | PRESSURE TEST LETTER FOR UNITS 1 THROUGH 4 RECEIVED FROM CONTRACTOR | JERRYF | JERRYF | | HRP | P | 6621596 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/29/2020 | NEED ENGINEER TO SUPPLY FULL DESIGN DETAIL FOR DAMPER OPENINGS AT ROOM 513 WHERE HOLES ARE OVERSIZED THIS INSPECTION WAS FOR FIRE DAMPERS AT AHU 3 SA / RA AT COMMONS AREA - DAMPER GAP AND RETAINAGE OK - AT FUTURE INSPECTION VERIFY BREAK AWAY CONNECTIONS | JERRYF | JERRYF | | HD | P | 6620793 |
PIPE LINE SPECIALTIES INC. | HWP | P | 06/29/2020 | AT FUTURE INSPECTION VERIFY LINE SET INSULATION IS COMPLETE TO CABINET UNITS THIS INSPECTION WAS FOR AREA A SECTION 5 AND 6 - CONDENSATE DRAIN AND REF. PIPING - PRESSURE TEST AND PIPING OK PER PLAN | JERRYF | JERRYF | | HWP | P | 6620783 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/25/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - FIRE DAMPER GAP AT AREA C4 - 48 X 16 AND 48 X 18 OK STILL NEED RETAINAGE - AREA C1 CORRIDOR AND ROOM 405 6 X 6 DAMPER GAP AND RETAINAGE OK | JERRYF | JERRYF | | HD | P | 6617992 |
PIPE LINE SPECIALTIES INC. | HRP | P | 06/25/2020 | THIS INSPECTION WAS FOR AREA'S N1 AND 2 HRP PIPING - STILL NEED TO INSPECT ALL CONDENSATE DRAIN PIPING - NEED LETTER FROM CONTRACTOR WITH LICENSEE SIGNATURE VERIFY PRESSURE TEST OK FOR THIS AREA ONLY SINCE THIS AREA WAS TESTED AND COMPLETED WITHOUT INSPECTION - ALL OTHER REF. PIPING WILL NEED PRESSURE TEST VERIFIED BY PPRBD NOTES: PIPING OK PENDING LETTER VERIFYING PRESSURE TEST | JERRYF | JERRYF | | HRP | P | 6617991 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/18/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - F/D FRAMING AT AREA C4 AHU #3 48 X 16 AND 48 X 14 OPENINGS OK - AREA C 1 - ABOVE CEILING SA / RA / EXHAUST AT THE FOLLOWING ROOMS OK - 407 - 406 - 412 - 413 - 435 - 436 - 434 | JERRYF | JERRYF | | HD | P | 6609152 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/16/2020 | STILL NEED ALL ERV TIE INS - RESTROOMS 206 AND 211 - ALL OSA TIE INS AT CEILING UNITS - COMPLETE DUCT TIE INS AT CAFETERIA RTU - DESIGN DETAIL FROM ARCHITECT / ENGINEER FOR OVERSIZED HOLES AT FIRE DAMPERS AND INSPECTION OF DAMPER FRAMING WHEN READY - STILL NEED ALL REFRIGERATION PRESSURE TESTS AND INSPECTIONS WHEN READY THIS INSPECTION WAS FOR THE FOLLOWING AREA'S - CAFETERIA RETURN RUN OUTS - S1 - CLASSROOMS 211 - 213 - AREA S3 - C1 RESTROOM - ABOVE CEILING SA / RA / EXHAUST MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6606149 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/04/2020 | THIS INSPECTION WAS FOR THE FOLLOWING AREA'S - S1 - C1 - C3 - COMMONS AND CAFETERIA - CORRIDOR - ABOVE CEILING SA MAINS AND RUN OUTS OK STILL NEED RA IN CAFETERIA - TIE INS TO ERV'S AND TIE IN FINAL CONNECTIONS IN ALL ROOMS | JERRYF | JERRYF | | HD | P | 6593523 |
PIPE LINE SPECIALTIES INC. | HWP | P | 06/04/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - AREA'S - S2 - S3 - S1 - CI - PRESSURE TEST AND PIPING ON SUPPLY AND RETURN OK - STILL NEED ALL FINAL TIE INS AND CONNECTIONS TO ERV'S | JERRYF | JERRYF | | HWP | P | 6593522 |
PIPE LINE SPECIALTIES INC. | HD | P | 05/27/2020 | NEED TO REMOVE ALL GAS WORK FROM PERMIT - THIS INSPECTION WAS FOR AREA S 2 PAGE MH 2.01A ERV 5 CORRIDOR AND CLASSROOMS SA / RA MAINS AND RUN OUTS - UNABLE TO OPEN PLANS IN COMPUTER INSPECTION WAS PERFORMED FROM ON SITE PLANS - STILL NEED TIE INS TO ROOF EQUIPMENT NOTES: ABOVE CEILING SA / RA MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6584229 |
PIPE LINE SPECIALTIES INC. | HWP | P | 05/18/2020 | INSPECTED BY ON SITE UN APPROVED PLANS - NEED APPROVED PLAN REVISIONS - UNABLE TO REVIEW PLANS IN COMPUTER CONTRACTOR PROCEEDING AT OWN RISK - THIS INSPECTION WAS FOR THE FOLLOWING PAGE MP2.02A FROM GRID LINES 18 THROUGH 22 CORRIDOR PIPING - NOTES PRESSURE TEST OK AND PIPING OK PER UN APPROVED PLANS | JERRYF | JERRYF | | HWP | P | 6574994 |
PIPE LINE SPECIALTIES INC. | HD | P | 05/18/2020 | INSPECTED BY ON SITE UN APPROVED PLANS - NEED APPROVED PLAN REVISIONS - UNABLE TO REVIEW PLANS IN COMPUTER CONTRACTOR PROCEEDING AT OWN RISK - THIS INSPECTION WAS FOR THE FOLLOWING PAGE MH 2.03A FROM GRID LINES 18 THROUGH 22 CORRIDOR AND CLASS ROOMS NOTE: ABOVE CEILING SA / RA / EXHAUST OK - HAD CONSULT ON OVER SIZED HOLES AT FIRE DAMPERS (ENGINEER TO ADDRESS IN FILL AT OPENINGS WILL NEED DAMPER INSTALL MANUAL AT TIME OF INSPECTION | JERRYF | JERRYF | | HD | P | 6574989 |
PIPE LINE SPECIALTIES INC. | XMS | T | 05/18/2020 | PAID (REC#1683182): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 6574493 |
NUNN CONSTRUCTION, INC. | XBS | T | 05/15/2020 | PAID (REC#1683027): PLAN SPLICE FEE: $79.17 by: LBENNETT for Construction: Minor layout changes, occupant load revised | LBENNETT | LBENNETT | | XBS | T | 6574119 |