PALMER RIDGE CONSTRUCTION CO. | B= | C | 12/08/2020 | All other required Final inspections are complete. (This is a computer generated result) | TRENTP | TRENTP | | B= | C | 6799640 |
PALMER RIDGE CONSTRUCTION CO. | B= | P | 12/07/2020 | Complete pending other finals. Additional Inspections Required (computer generated): COLORADO GAS SYSTEMS Mechanical Final Inspection is not Completed yet. | TRENTP | TRENTP | | B= | P | 6798092 |
PALMER RIDGE CONSTRUCTION CO. | B= | P | 12/04/2020 | Complete pending other finals. Additional Inspections Required (computer generated): COLORADO GAS SYSTEMS Mechanical Final Inspection is not Completed yet, ROWAN ELECTRIC LLC Electrical Final Inspection is not Completed yet. | TRENTP | TRENTP | | B= | P | 6796796 |
PALMER RIDGE CONSTRUCTION CO. | BIN | C | 09/08/2020 | Installers cert for blown in insulation on file | TRENTP | TRENTP | | BIN | C | 6698403 |
PALMER RIDGE CONSTRUCTION CO. | BIN | P | 09/03/2020 | Please provide installers cert for blown in insulation, inspector observed 5 inches over spray foam insulation / Will inspect attic insulation at final | TRENTP | TRENTP | | BIN | P | 6696382 |
PALMER RIDGE CONSTRUCTION CO. | BIN | P | 09/03/2020 | Installers cert and evaluation report for spray foam insulation on file / Pending field inspection | TRENTP | TRENTP | | BIN | P | 6695317 |
PALMER RIDGE CONSTRUCTION CO. | BFR | C | 08/31/2020 | Photos of added LS50s on file | TRENTP | TRENTP | | BFR | C | 6690432 |
PALMER RIDGE CONSTRUCTION CO. | BFR | P | 08/27/2020 | Missing LS50s for joists on ledger side at unfinished storage / Rest okay | TRENTP | TRENTP | | BFR | P | 6687856 |
PALMER RIDGE CONSTRUCTION CO. | BFR | R | 08/20/2020 | Unfinished storage above bathroom is not shown on plans and will need to be spliced /// *Inspector observed 2x6 joists 16 in O.C. toe nailed to 2x6 rim joist at one end and bearing on top plate and over door at other end, no header at door, Rim is nailed with 2 fasteners into studs at 12 in O.C. at one side and 16 in O.C. at other side* /// Floor joists for down stairs area are set in hangers which are nailed to header for sliding glass door / Plans call for 4 king studs E.E. of downstairs header for sliding glass door, no kings installed, observed 8 trimmers. | TRENTP | TRENTP | | BFR | R | 6679771 |
PALMER RIDGE CONSTRUCTION CO. | BLA | C | 08/12/2020 | | TRENTP | TRENTP | | BLA | C | 6670038 |
PALMER RIDGE CONSTRUCTION CO. | BSP | P | 07/01/2020 | Deck and porch cover frames okay | TRENTP | TRENTP | | BSP | P | 6624596 |
PALMER RIDGE CONSTRUCTION CO. | BFI | C | 04/16/2020 | Rigid R10 installed interior side of walkout foundation wall OK. | CHUCK | CHUCK | | BFI | C | 6542814 |
PALMER RIDGE CONSTRUCTION CO. | BFD | C | 04/16/2020 | Usable foundation drain to daylight and damp proofing OK. | CHUCK | CHUCK | | BFD | C | 6542809 |
PALMER RIDGE CONSTRUCTION CO. | BFD | P | 04/15/2020 | Soils report on file. Will verify drain at on site inspection. | CHUCK | CHUCK | | BFD | P | 6541852 |
PALMER RIDGE CONSTRUCTION CO. | BFN | C | 04/15/2020 | Foundation design and foundation reinforcement with UFER observation on file. | CHUCK | CHUCK | | BFN | C | 6541847 |
PALMER RIDGE CONSTRUCTION CO. | BFT | C | 04/15/2020 | Open ex. and footing observation on file - 3500# (design verified) / 5% / usable drain required. | CHUCK | CHUCK | | BFT | C | 6541842 |
ROWAN ELECTRIC LLC | E= | C | 12/04/2020 | | TOMC | TOMC | | E= | C | 6797738 |
ROWAN ELECTRIC LLC | E= | R | 12/03/2020 | need gfi protection thru out shop area , with in 6' of all sinks receptacles on south wall of shop had no power | TOMC | TOMC | | E= | R | 6795803 |
ROWAN ELECTRIC LLC | ES | C | 08/19/2020 | Residential Underground: 200-amp 3-wire , no action required by utility. / | GREGM | GREGM | | ES | C | 6678575 |
ROWAN ELECTRIC LLC | ER | C | 08/19/2020 | ER OK ---- 3- #6AL --- 5- #10 --- 1-#2 SER TO SUB PANEL --- IRR UFER ---- | GREGM | GREGM | | ER | C | 6678567 |
ROWAN ELECTRIC LLC | EUG | C | 05/28/2020 | 250 urd | TOMC | TOMC | | EUG | C | 6586017 |
ROWAN ELECTRIC LLC | ESL | C | 05/04/2020 | 2 - pvc stubs | TOMC | TOMC | | ESL | C | 6559809 |
COLORADO GAS SYSTEMS | H= | C | 12/08/2020 | FINAL FOR GAS CONTRACTOR | BILLS | BILLS | | H= | C | 6799639 |
CUSTOM CLIMATE CONTROL | H= | C | 12/03/2020 | IECC/IRC VENTILATION FORM SPLICE IN PLANS, SPRAY FOAM REMOVED FROM B-VENT, SEE IMAGES. | BILLS | BILLS | | H= | C | 6795107 |
CUSTOM CLIMATE CONTROL | H= | P | 11/30/2020 | NEED REVISED/APPROVED IECC/IRC VENTILATION FORM SPLICED TO PLANS FOR ADDED EXHAUST FAN AT COMM ROOM ABOVE BATHROOM, ADDED FAN AT COMM ROOM TO TERMINATE AT EXTERIOR, REMOVE SPRAY FOAM FROM WATER HEATER BVENT AT MECH ROOM. CONTRACTOR TO ATTACH PICTURES AT NEXT INSPECTION REQUEST. WHOLE HOUSE VENTILATION BEING ACHIEVED THROUGH EXHAUST FAN LOCATED IN BATHROOM / WHOLE HOUSE VENTILATION SWITCH LOCATED IN BATHROOM / NOTE DETACHED HEATED GARAGE WITH OFFICE AREA / DIRECT VENT FURNACE / A/C COMPLETE / NO OUTSIDE AIR TO FURNACE RETURN / HIGH/LOW GRILLES INTO MECHANICAL ROOM / | BILLS | BILLS | | H= | P | 6790482 |
COLORADO GAS SYSTEMS | HO+ | C | 09/11/2020 | 10 LB TEST OK / 40 FT OF 3/4 INCH POLY WITH TRACER WIRE FOR FUTURE FIRE PIT | ANDREWP | ANDREWP | | HO+ | C | 6703028 |
CUSTOM CLIMATE CONTROL | HC | C | 07/29/2020 | DETACHED GARAGE | ANDREWP | ANDREWP | | HC | C | 6653846 |
CUSTOM CLIMATE CONTROL | HRR | C | 07/29/2020 | NOTES/DIRECT VENT FURNACE | ANDREWP | ANDREWP | | HRR | C | 6653839 |
CUSTOM CLIMATE CONTROL | HRR | L | 07/28/2020 | HOUSE LOCKED AT 10:00 AM | ANDREWP | ANDREWP | | HRR | L | 6652057 |
COLORADO GAS SYSTEMS | HI | C | 07/22/2020 | STUB IN REC ROOM IS FUTURE FIRE PLACE/ AT FINAL WILL NEED TO VERIFY ACCESS FOR REGULATOR | ANDREWP | ANDREWP | | HI | C | 6645523 |
COLORADO GAS SYSTEMS | HI | P | 07/21/2020 | WHAT IS THE GAS STUB WITH THE REGULATOR BEHIND THE FRAMING FOR? MEDIUM PRESSURE STICKERS IN PLACE / WILL NEED VERIFY REGULATORS AT FINAL
10 LB TEST / 3/4 INCH MAIN / 2 GARAGE HEATERS / 1 BBQ STUB / 1 FURNACE/ 1 WATER HEATER/ 1 FUTURE STUB | ANDREWP | ANDREWP | | HI | P | 6644109 |
COLORADO GAS SYSTEMS | HO | C | 05/27/2020 | 10 LB TEST OK / 125 FT OF 3/4 INCH POLY WITH TRACER WIRE FOR GARAGE | ANDREWP | ANDREWP | | HO | C | 6583937 |
DBA PLUMBING LLC | P= | C | 11/06/2020 | Water certificate attached to main residence | MALYNDA | MALYNDA | | P= | C | 6767748 |
DBA PLUMBING LLC | PTO | C | 08/04/2020 | Corrections made. | DANR | DANR | | PTO | C | 6660501 |
DBA PLUMBING LLC | PTO | P | 08/03/2020 | Cannot use santee on side for drainage at laundry sink / need nail protection hose bib in garage and laundry / rest ok. Note: AAV kitchen - bar - lav / no irrigation / need potable water certificate for main house by final. | DANR | DANR | | PTO | P | 6659047 |
DBA PLUMBING LLC | PB | C | 04/30/2020 | Ok. Note: need potable water certificate on main residents by final. | DANR | DANR | | PB | C | 6557095 |
PALMER RIDGE CONSTRUCTION CO. | PWO | C | 04/29/2020 | Note: Check for potable water certificate on residence by final | MALYNDA | MALYNDA | | PWO | C | 6555915 |
COLORADO GAS SYSTEMS | XMS | T | 12/03/2020 | PAID (REC#1733982): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: ADDED FAN ...CLOUD | DALEH | DALEH | | XMS | T | 6794921 |
COLORADO GAS SYSTEMS | XMS | P | 08/26/2020 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: no revisions to Mechanical | DALEH | DALEH | | XMS | P | 6685722 |
PALMER RIDGE CONSTRUCTION CO. | XBS | T | 08/26/2020 | PAID (REC#1707777): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise structurals | MICHAELA | MICHAELA | | XBS | T | 6685629 |
PALMER RIDGE CONSTRUCTION CO. | XBS | T | 05/21/2020 | PAID (REC#1682233): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise deck loading at garage | MICHAELA | MICHAELA | | XBS | T | 6579641 |
PALMER RIDGE CONSTRUCTION CO. | XMS | T | 04/30/2020 | PAID (REC#1677332): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised manuals J,D for zoned system | JUSTINC | JUSTINC | | XMS | T | 6556785 |