WESTERN STATES MANAGEMENT GROUP LLC | B= | C | 10/13/2020 | | BOBF | BOBF | | B= | C | 6739814 |
WESTERN STATES MANAGEMENT GROUP LLC | B= | P | 09/24/2020 | need to complete other required inspections / need hand rails installed each side of stairs on north east corner of building / open hole and letter for structural connections received. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet, MICK HEATING & SHEET METAL Mechanical Final Inspection is not Completed yet, TRUSTED ELECTRIC Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6717938 |
WESTERN STATES MANAGEMENT GROUP LLC | BLA | C | 07/29/2020 | | ADAML | ADAML | | BLA | C | 6653814 |
WESTERN STATES MANAGEMENT GROUP LLC | BSP | P | 07/29/2020 | Need to attach electrical to permit and complete required inspection / Still need engineer letter for all welds / Grout under all columns OK | ADAML | ADAML | | BSP | P | 6653809 |
WESTERN STATES MANAGEMENT GROUP LLC | BFR | P | 07/06/2020 | need to attach mech and elec to permit and complete required inspections / need to grout under steel columns, need to provide eng letter for all welds including those at column to beam additional RTU support and cross bracing, rest of exterior wall framing okay | BOBF | BOBF | | BFR | P | 6627366 |
WESTERN STATES MANAGEMENT GROUP LLC | BFN | P | 07/06/2020 | eng letter for foundation steel of file, still need stamped open hole | BOBF | BOBF | | BFN | P | 6627336 |
WESTERN STATES MANAGEMENT GROUP LLC | BFT | P | 07/06/2020 | eng letter for footing on file, still need stamped open hole | BOBF | BOBF | | BFT | P | 6627332 |
WESTERN STATES MANAGEMENT GROUP LLC | BFI | P | 05/13/2020 | Foundation insulation OK / Need open hole as well as footing and foundation paperwork | ADAML | ADAML | | BFI | P | 6570177 |
WESTERN STATES MANAGEMENT GROUP LLC | BFN | P | 05/04/2020 | Authorized 3rd party engineer inspection with all observation paperwork to follow | DANE | DANE | | BFN | P | 6559154 |
WESTERN STATES MANAGEMENT GROUP LLC | BFT | P | 05/04/2020 | Authorized 3rd party engineer inspection with all observation paperwork to follow | DANE | DANE | | BFT | P | 6559153 |
TRUSTED ELECTRIC | E= | C | 09/25/2020 | | BRIAN | BRIAN | | E= | C | 6720453 |
TRUSTED ELECTRIC | E= | P | 09/24/2020 | Need breaker fillers in house panel---Need to complete raceways to four 40a RTU's--- | LOGANP | LOGANP | | E= | P | 6718871 |
TRUSTED ELECTRIC | ES | C | 09/21/2020 | Commercial Service: 200a 4w services ok to set meters for units 100--110--120--- | LOGANP | LOGANP | | ES | C | 6712257 |
TRUSTED ELECTRIC | ES | P | 08/18/2020 | Commercial Service: 1000a 4w gutter--ok to set meters for house panel & unit 130 / | LOGANP | LOGANP | | ES | P | 6676464 |
TRUSTED ELECTRIC | ES | R | 08/17/2020 | Commercial Service: need to bond the 100 amp house panel / need sealing lock nuts on the pvc entering the top of the gutter / need 3/0 gec to the steel / if using myers hubs need to use the lock nut that comes with the myers hub and bond the nipple on the meter side / | BRIAN | BRIAN | | ES | R | 6675630 |
MICK HEATING & SHEET METAL CO. | H= | C | 10/13/2020 | CORRECTIONS MADE | MARKB | MARKB | | H= | C | 6739132 |
MICK HEATING & SHEET METAL CO. | H= | P | 09/24/2020 | FINAL PENDING: ----PLAN SPLICE REQUIRED: Plan shows A1 RTU'S as 120k input but 150k input RTU'S were installed---- Building roof ladder measures 16" wide and code requires a minimum of 18" wide. | MARKB | MARKB | | H= | P | 6718235 |
MARTINSON MECHANICAL, INC | H= | C | 09/15/2020 | FINAL FOR GAS CONTRACTOR. ALL LABELING AND SUITE NUMBER TAGS IN PLACE | BILLS | BILLS | | H= | C | 6706149 |
MARTINSON MECHANICAL, INC | HC | C | 08/25/2020 | RELEASE 2 PSI METERS FOR SUITES 100, 110, 120 & 130 | MARKB | MARKB | | HC | C | 6684290 |
MARTINSON MECHANICAL, INC | HI | C | 08/25/2020 | FOR FINAL - Suite 100 RTU regulator needs outdoor rated vent protection. Label all gas stubs with suite number served. 10 PSI PRESSURE TEST ON SUITES 100, 110, 120 & 130. PIPING PER PLAN | MARKB | MARKB | | HI | C | 6684283 |
MARTINSON MECHANICAL, INC | HI | P | 08/21/2020 | SUITE 130 ONLY: 2 PSI APPROVAL LETTER FROM CSU RECEIVED 10 PSI PRESSURE TEST AND PIPING PER PLAN OK | MARKB | MARKB | | HI | P | 6681113 |
MARTINSON MECHANICAL, INC | P= | C | 09/23/2020 | See plan splice. | DANR | DANR | | P= | C | 6715597 |
MARTINSON MECHANICAL, INC | PTO | C | 09/23/2020 | See plans splice. | DANR | DANR | | PTO | C | 6715594 |
MARTINSON MECHANICAL, INC | P= | P | 09/21/2020 | No correction made. | DANR | DANR | | P= | P | 6713352 |
MARTINSON MECHANICAL, INC | P= | P | 09/15/2020 | Need plans splice for added hose bib to East side of building in unit 120 / need PTO completed. | DANR | DANR | | P= | P | 6706703 |
MARTINSON MECHANICAL, INC | PTO | P | 09/15/2020 | Need plans splice for added hose bib to East side of building in unit 120 / rest of piping ok. | DANR | DANR | | PTO | P | 6706698 |
MARTINSON MECHANICAL, INC | PB | C | 09/15/2020 | Ok. | DANR | DANR | | PB | C | 6706669 |
MARTINSON MECHANICAL, INC | PB | P | 05/19/2020 | ok for g.w., s.s., and g.i. vents, MINUS water stubbed into water entry | JOHNS | JOHNS | | PB | P | 6576583 |
MICK HEATING & SHEET METAL CO. | XMS | T | 09/29/2020 | PAID (REC#1720944): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: RTU's and gas added to shell scope | JUSTINC | JUSTINC | | XMS | T | 6722921 |
MARTINSON MECHANICAL, INC | XPS | P | 09/23/2020 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 1 revisions: P-2 adjusted water plan | SHANEN | SHANEN | | XPS | P | 6715561 |