GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 12/09/2020 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6801153 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/19/2020 | . Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6611129 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/23/2020 | pending completion of other required inspections, interior wall and soffit framing okay | BOBF | BOBF | | BFR | P | 6549924 |
ENCORE ELECTRIC, INC. | E= | C | 09/10/2020 | pictures of the lights emailed to me OK | CRAIGS | CRAIGS | | E= | C | 6700973 |
ENCORE ELECTRIC, INC. | E= | P | 06/04/2020 | except remaining lights | CRAIGS | CRAIGS | | E= | P | 6593823 |
ENCORE ELECTRIC, INC. | ER | C | 06/03/2020 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 6591783 |
ENCORE ELECTRIC, INC. | E= | C | 06/03/2020 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 6591784 |
ENCORE ELECTRIC, INC. | E= | C | 06/03/2020 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 6591785 |
ENCORE ELECTRIC, INC. | ER | C | 06/03/2020 | need all the paper work for the equipment that plugs in above ceiling | CRAIGS | CRAIGS | | ER | C | 6591781 |
ENCORE ELECTRIC, INC. | ER | P | 05/12/2020 | soffit can lights OK | CRAIGS | CRAIGS | | ER | P | 6568265 |
ENCORE ELECTRIC, INC. | ER | P | 05/04/2020 | FIRE ALARM INSPECTION: walls,ok | JOHNN | JOHNN | | ER | P | 6559965 |
ENCORE ELECTRIC, INC. | ESL | C | 05/04/2020 | | JOHNN | JOHNN | | ESL | C | 6559964 |
ENCORE ELECTRIC, INC. | ER | P | 05/04/2020 | walls,ok, | JOHNN | JOHNN | | ER | P | 6559959 |
COLORADO SHEET METAL CO., INC. | H= | C | 12/09/2020 | SERVICE ACCESS PICTURES AND TAB REPORT APPROVAL LETTER RECEIVED | JERRYF | JERRYF | | H= | C | 6801152 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/16/2020 | AFTER DISCUSSION WITH CONTRACTOR, OK TO SEND PICTURES OF ACCESS FOR VAV, AND MVD ACCESS AND LETTER FROM ENGINEER REGARDING TAB REPORT | BENH | BENH | | H= | P | 6777649 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/16/2020 | PARTIAL PENDING THE FOLLOWING - SITE VISIT TO VERIFY ACCESS TO VAV PER PREVIOUS NOTES AND MVD ACCESS PER NOTES ON TAB REPORT - NEED ENGINEER TO APPROVE TAB REPORT (SOME READINGS OUTSIDE +/- 10%) | JERRYF | JERRYF | | H= | P | 6776946 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/04/2020 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 6593936 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 06/04/2020 | | JERRYF | JERRYF | | H= | C | 6593929 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 05/29/2020 | VAV BOX CONNECTIONS OK - OK TO INSULATE | JERRYF | JERRYF | | HWP | C | 6587836 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/29/2020 | CONDUIT HAS BEEN INSTALLED UNDER VAV 1084 NOW BOX LACKS SERVICE CLEARANCE AT FINAL VERIFY PROPER SERVICE ACCESS | JERRYF | JERRYF | | HD | P | 6587823 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/14/2020 | PRESSURE TEST OK AND PIPING PER PLAN FOR PIPING IN WALL AT 1ST FLOOR - STILL NEED ALL VAV CONNECTIONS | JERRYF | JERRYF | | HWP | P | 6572340 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/05/2020 | ABOVE CEILING SA / RA MAINS / RUN OUTS AND BOXES OK | JERRYF | JERRYF | | HD | P | 6561566 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/29/2020 | ABOVE CEILING HWP PIPING OK - STILL NEED PIPING COMPLETED IN WALL AND UNDER GROUND | JERRYF | JERRYF | | HWP | P | 6555875 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 07/17/2020 | existing dwv and water, only re set sink. NOTE: vtr (existing) | JOHNS | JOHNS | | PTO | C | 6641123 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 07/17/2020 | | JOHNS | JOHNS | | P= | C | 6641116 |
OLSON PLUMBING & HEATING COMPANY | PTO | L | 06/04/2020 | Cancel per contractor request. | SAMH | SAMH | | PTO | L | 6593235 |