INNOVATIVE CONSTRUCTION, INC. | B= | C | 01/08/2021 | | JOHN | JOHN | | B= | C | 6830759 |
INNOVATIVE CONSTRUCTION, INC. | B= | T | 12/11/2020 | PAID (REC#1736127): Temp CO: Extension pending required finals and completion of phase 2 under seperate permit/ Trip fee added for TCO fee collection ( Expires: 1/10/2021 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6804392 |
INNOVATIVE CONSTRUCTION, INC. | B= | P | 12/03/2020 | Photos uploaded of panic hardware on South door / Pending completion of final on separate permit #M87396 | ADAML | ADAML | | B= | P | 6794822 |
INNOVATIVE CONSTRUCTION, INC. | B= | T | 11/13/2020 | PAID (REC#1729991): Temp CO: Extension pending required finals and completion of phase 2 under seperate permit/ Trip fee added for TCO fee collection ( Expires: 12/13/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6776681 |
INNOVATIVE CONSTRUCTION, INC. | B= | T | 10/16/2020 | PAID (REC#1722273): Temp CO: Extension Pending required finals/ Trip fee added for TCO fee collection ( Expires: 11/15/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6744883 |
INNOVATIVE CONSTRUCTION, INC. | B= | T | 09/17/2020 | PAID (REC#1713734): Temp CO: Pending all required finals/ Trip fee added for TCO fee collection ( Expires: 10/17/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6708598 |
INNOVATIVE CONSTRUCTION, INC. | B= | P | 07/23/2020 | Need panic hardware on South exit door / Complete MEP final inspections / Complete outside agency final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), EAGLE HEATING & AIR COND. INC. Mechanical Final Inspection is not Completed yet, RYBA ELECTRIC, INC. Electrical Final Inspection is not Completed yet, TRI-STAR MECHANICAL Plumbing Final Inspection is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | P | 6648004 |
INNOVATIVE CONSTRUCTION, INC. | BFR | C | 07/20/2020 | Grid ceiling support ok at 101, 104, 103 / Demising wall to be completed by other contractor during phase 2 (offices) currently in progress | TIMOTHYS | TIMOTHYS | | BFR | C | 6643520 |
INNOVATIVE CONSTRUCTION, INC. | BFR | P | 06/09/2020 | Light gauge steel wall framing at Storage 101, Janitor closet 104, and Server room 103 ok / Still need to inspect ceiling framing when installed / 18' of previously inspected demising wall removed from grid line O - P / Complete MEP rough inspections / Provide 3rd party welding observations | TIMOTHYS | TIMOTHYS | | BFR | P | 6598957 |
INNOVATIVE CONSTRUCTION, INC. | BFR | P | 05/28/2020 | Light gauge steel framing for demising wall ok between Phase 1 (shop) and Phase 2 (office) | TIMOTHYS | TIMOTHYS | | BFR | P | 6586632 |
INNOVATIVE CONSTRUCTION, INC. | BIN | P | 05/27/2020 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6583913 |
INNOVATIVE CONSTRUCTION, INC. | BFN | C | 05/21/2020 | Geotechnical report on file | TIMOTHYS | TIMOTHYS | | BFN | C | 6579153 |
INNOVATIVE CONSTRUCTION, INC. | BFT | C | 05/21/2020 | Geotechnical report on file | TIMOTHYS | TIMOTHYS | | BFT | C | 6579152 |
INNOVATIVE CONSTRUCTION, INC. | BFN | P | 05/20/2020 | Engineers observation letter for footing, foundation, and soils on file - Engineers field testing reports on file - Provide Geotechnical report referenced in field report | TIMOTHYS | TIMOTHYS | | BFN | P | 6577539 |
INNOVATIVE CONSTRUCTION, INC. | BFT | P | 05/20/2020 | Engineers observation letter for footing, foundation, and soils on file - Engineers field testing reports on file - Provide Geotechnical report referenced in field report | TIMOTHYS | TIMOTHYS | | BFT | P | 6577538 |
INNOVATIVE CONSTRUCTION, INC. | BFN | R | 05/19/2020 | Uploaded excavation observation paperwork needs to be stamped by a Colorado licensed engineer before it can be accepted | TIMOTHYS | TIMOTHYS | | BFN | R | 6576067 |
INNOVATIVE CONSTRUCTION, INC. | BFT | R | 05/19/2020 | Uploaded excavation observation paperwork needs to be stamped by a Colorado licensed engineer before it can be accepted | TIMOTHYS | TIMOTHYS | | BFT | R | 6576060 |
INNOVATIVE CONSTRUCTION, INC. | BFN | R | 05/18/2020 | Uploaded excavation observation paperwork needs to be stamped by a Colorado licensed engineer before it can be accepted | TIMOTHYS | TIMOTHYS | | BFN | R | 6574399 |
INNOVATIVE CONSTRUCTION, INC. | BFT | R | 05/18/2020 | Uploaded excavation observation paperwork needs to be stamped by a Colorado licensed engineer before it can be accepted | TIMOTHYS | TIMOTHYS | | BFT | R | 6574397 |
INNOVATIVE CONSTRUCTION, INC. | BSP | P | 05/14/2020 | Complete foundation inspections / Overhead door steel structure ok per plan pending welding and bolting letter | TIMOTHYS | TIMOTHYS | | BSP | P | 6572483 |
INNOVATIVE CONSTRUCTION, INC. | BFN | R | 05/14/2020 | Uploaded excavation observation paperwork needs to be stamped by a Colorado licensed engineer before it can be accepted | TIMOTHYS | TIMOTHYS | | BFN | R | 6571195 |
INNOVATIVE CONSTRUCTION, INC. | BFT | R | 05/14/2020 | Uploaded excavation observation paperwork needs to be stamped by a Colorado licensed engineer before it can be accepted | TIMOTHYS | TIMOTHYS | | BFT | R | 6571189 |
RYBA ELECTRIC, INC. | E= | C | 11/12/2020 | Corrections made on drawings | BRETC | BRETC | | E= | C | 6774485 |
RYBA ELECTRIC, INC. | ER | C | 11/12/2020 | | BRETC | BRETC | | ER | C | 6774478 |
RYBA ELECTRIC, INC. | EP | C | 11/12/2020 | | BRETC | BRETC | | EP | C | 6774475 |
RYBA ELECTRIC, INC. | E= | P | 09/11/2020 | Panels LA & LB, plans need to show series rated for 10k brkrs installed / Plans were spliced to show AL conductors on one line | BRETC | BRETC | | E= | P | 6702832 |
RYBA ELECTRIC, INC. | E= | P | 07/20/2020 | Label everything all equipment and panels, disconnects / Splice plans / Rest - Ok | BRETC | BRETC | | E= | P | 6642706 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/10/2020 | FIRE ALARM INSPECTION: | BRETC | BRETC | | E= | C | 6634289 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 07/10/2020 | FIRE ALARM INSPECTION: 13 Horn Strobes in joists | BRETC | BRETC | | ER | C | 6634287 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/10/2020 | FIRE ALARM INSPECTION: 13 Horn Strobes in joists | BRETC | BRETC | | E= | C | 6634288 |
RYBA ELECTRIC, INC. | ER | P | 06/18/2020 | Demising wall South only. | BRETC | BRETC | | ER | P | 6609083 |
RYBA ELECTRIC, INC. | EP | P | 06/11/2020 | Panels HA,LA,HB,LCP&LB splice plans with new one line wire schedule using aluminum / | BRETC | BRETC | | EP | P | 6600958 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | C | 08/13/2020 | ENGINEER LETTER RECEIVED AND ROOF OK | JERRYF | JERRYF | | H= | C | 6671297 |
RESCUE MECHANICAL, INC. | H= | C | 07/23/2020 | | JERRYF | JERRYF | | H= | C | 6646961 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 07/23/2020 | TAB REPORT RECEIVED - STILL NEED TO ADDRESS ALL OTHER PREVIOUS NOTES TO COMPLETE FINAL | JERRYF | JERRYF | | H= | P | 6646960 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 07/22/2020 | TUBE HEATER INSTALL MANUAL INSTALL MANUAL FOR MODEL VPS UNITS - PAGE 10 STATES THAT THEY ARE CATEGORY 3 VENTED UNITS ARE VENTED IN SINGLE WALL FLUE AND B VENT??? - NEED STAMPED APPROVED LETTER FROM REZNOR OR MECHANICAL ENGINEER STATING THAT B VENT IS ACCEPTABLE OR REPLACE VENTING AT ALL TUBE HEATERS - WILL NEED ROOF INSPECTION BEFORE FINAL TO VERIFY MUA UNIT AND TUBE HEATER FLUE TERMINATIONS - NEED TAB REPORT FOR MUA UNIT - ALL VENTING WILL NEED COMPLETE INSPECTION INCLUDING CLEARANCES TO COMBUSTIBLES - STOPPED INSPECTION | JERRYF | JERRYF | | H= | P | 6645736 |
RESCUE MECHANICAL, INC. | H= | P | 07/22/2020 | PARTIAL FINAL PENDING CONTRACTOR CALLING INSPECTION NOTES: ALL FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6645733 |
EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 07/21/2020 | THIS INSPECTION WAS FOR PHASE 1 BDA PAGE 25 - NEED INSTALL MANUAL FOR TUBE HEATERS TO VERIFY VENTING - NEED TRANSFER GRILLE TO ELECTRIC ROOM PER PLAN - NEED ROOF INSPECTION - NEED TAB REPORT | JERRYF | JERRYF | | H= | P | 6645183 |
RESCUE MECHANICAL, INC. | H= | P | 07/16/2020 | SEE HI NOTES TO COMPLETE FINAL | JERRYF | JERRYF | | H= | P | 6640492 |
RESCUE MECHANICAL, INC. | HC | C | 07/16/2020 | OK TO RELEASE 2# METER | JERRYF | JERRYF | | HC | C | 6640491 |
RESCUE MECHANICAL, INC. | HI | C | 07/16/2020 | PRESSURE TESTS OK - PIPING PER PLAN - TO COMPLETE FINAL NEED CONNECTIONS AT ALL TUBE HEATERS PER INSTALL MANUAL | JERRYF | JERRYF | | HI | C | 6640486 |
TRI-STAR MECHANICAL | P= | C | 10/16/2020 | | SAMH | SAMH | | P= | C | 6744690 |
TRI-STAR MECHANICAL | P= | P | 09/03/2020 | Update scope of work. | SAMH | SAMH | | P= | P | 6695567 |
TRI-STAR MECHANICAL | P= | P | 07/23/2020 | No hot water / re-inspect all. | DANR | DANR | | P= | P | 6648496 |
TRI-STAR MECHANICAL | PTO | C | 06/16/2020 | Complete PB by final. Adjust scope of work for omitted fixtures. | SAMH | SAMH | | PTO | C | 6606885 |
TRI-STAR MECHANICAL | PB | P | 06/01/2020 | Need Engineers letter to tie in 3" Sewer to Existing 3" Sewer main. Cover at own risk. | SAMH | SAMH | | PB | P | 6588589 |
RYBA ELECTRIC, INC. | XES | T | 10/21/2020 | PAID (REC#1723929): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Provide series ratings. | BERTHA | BERTHA | | XES | T | 6748647 |
RYBA ELECTRIC, INC. | XES | T | 08/11/2020 | PAID (REC#1711291): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised conductors to AL. | BERTHA | BERTHA | | XES | T | 6667957 |
INNOVATIVE CONSTRUCTION, INC. | XPS | T | 05/20/2020 | PAID (REC#1682073): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 4 revisions: P2.1 adjusted first floor drain, waste, and vent plan | SHANEN | SHANEN | | XPS | T | 6579026 |