COMMERCIAL INTERIOR SPECIALISTS, LLC. | B= | C | 11/01/2021 | | TIMOTHYS | TIMOTHYS | | B= | C | 7161057 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | B= | P | 09/16/2020 | Need all doors and handles installed, complete all final inspections. Reception wall per plan and was not changed. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, GDS ELECTRIC Electrical Final Inspection is not Completed yet, PHOENIX FIRE AND SECURITY Electrical Final Inspection is not Completed yet, TRI-STAR MECHANICAL Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6708107 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BSP | T | 07/17/2020 | PAID (REC#1713261) ADDITIONAL PLAN REVIEW TIME: $50 From: BPHILLIPS Increased project area. | BPHILLIPS | BPHILLIPS | | BSP | T | 6640760 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BFR | P | 06/12/2020 | All walls except entry and possible change of reception wall okay with completed required inspections. Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6603723 |
GDS ELECTRIC | E= | C | 03/11/2021 | | JOHNN | JOHNN | | E= | C | 6896672 |
PHOENIX FIRE AND SECURITY, LLC | E= | C | 12/01/2020 | FIRE ALARM INSPECTION: ok per pics / | BRIAN | BRIAN | | E= | C | 6791678 |
PHOENIX FIRE AND SECURITY, LLC | E= | R | 10/20/2020 | FIRE ALARM INSPECTION: need to add a grid wire to all the grid mounted devices / | BRIAN | BRIAN | | E= | R | 6747368 |
GDS ELECTRIC | E= | P | 09/30/2020 | no power to the furniture in open office---rest ok / | BRIAN | BRIAN | | E= | P | 6724937 |
GDS ELECTRIC | ER | P | 09/22/2020 | grid, east side,ok | JOHNN | JOHNN | | ER | P | 6714116 |
PHOENIX FIRE AND SECURITY, LLC | E= | R | 08/21/2020 | FIRE ALARM INSPECTION: not ready | JOHNN | JOHNN | | E= | R | 6681422 |
PHOENIX FIRE AND SECURITY, LLC | ER | P | 08/21/2020 | FIRE ALARM INSPECTION: above grid,ok | JOHNN | JOHNN | | ER | P | 6681418 |
GDS ELECTRIC | ER | P | 06/15/2020 | walls ok / note no fire alarm installed yet / | BRIAN | BRIAN | | ER | P | 6604194 |
AIRTECH MECHANICAL, INC. | H= | C | 04/05/2021 | BALANCE REPORT IN IMAGES | JON | JON | | H= | C | 6921679 |
AIRTECH MECHANICAL, INC. | H= | P | 04/02/2021 | APPEARS WRONG BALANCE REPORT FOR THIS PERMIT. DUCT WORK STILL ALL CONCEALED. CONFUSION WITH WHAT AREA WAS TO BE INSPECTED. REINSPECT ALL. MAKE SURE ALL PREVIOUS NOTES ARE FOLLOWED. PLANS TO MATCH PROJECT. | JON | JON | | H= | P | 6920944 |
AIRTECH MECHANICAL, INC. | H= | P | 01/19/2021 | NEED PICTURE OF RATING LABEL ON OSB WATER HEATER PLATFORM ATTACH PICTURE TO TAB REPORT | JERRYF | JERRYF | | H= | P | 6839618 |
AIRTECH MECHANICAL, INC. | H= | P | 10/12/2020 | ALL PLASTIC PIPING AND WOOD PLATFORM NEEDS TO MEET 25 /50 FLAME SPREAD | BENH | BENH | | H= | P | 6738191 |
AIRTECH MECHANICAL, INC. | H= | P | 10/12/2020 | TAB REPORT RECEIVED, SEE IMAGES, WILL STILL NEED ONSITE INSPECTION FOR ITEMS ON HD INSPECTION | BENH | BENH | | H= | P | 6737279 |
AIRTECH MECHANICAL, INC. | H= | P | 09/15/2020 | PARTIAL PENDING ADDRESSING NOTES FROM HD INSPECTION AND TAB REPORT | JERRYF | JERRYF | | H= | P | 6705951 |
AIRTECH MECHANICAL, INC. | HD | P | 09/15/2020 | FOR FINAL NEED ALL PLASTIC PIPING AND WOOD WATER HEATER PLATFORM TO MEET 25 / 50 FLAME SPREAD WILL VERIFY AT FINAL LEAVE TILES OUT SO INSPECTION CAN BE COMPLETED - ELECTRICAL INSPECTOR TO VERIFY SERVICE ACCESS TO VAV -302 ABOVE SERVER NOTES: ABOVE CEILING SA MAINS / RUN OUTS / FINAL CONNECTIONS / VAV BOXES ARE COMPLETE | JERRYF | JERRYF | | HD | P | 6705949 |
AIRTECH MECHANICAL, INC. | HD | P | 07/09/2020 | NEED PLAN REVISED TO SHOW NEW OFFICES AT SOUTH SIDE - NEED ALL VAV BOXES AND MEDIUM PRESSURE TIE INS - NEED ALL PVC PIPING PROTECTED IN NEW RETURN PLENUM NOTES: ABOVE CEILING LOW PRESSURE SA MAINS AND RUN OUTS OK EXCEPT FOR SOUTH OFFICES NOT SHOWN ON PLANS | JERRYF | JERRYF | | HD | P | 6632469 |
TRI-STAR MECHANICAL | P= | C | 09/22/2020 | | SAMH | SAMH | | P= | C | 6714504 |
TRI-STAR MECHANICAL | PTO | C | 07/07/2020 | AAV at sink. | SAMH | SAMH | | PTO | C | 6629195 |
GDS ELECTRIC | XES | P | 07/21/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Increased scope. | BERTHA | BERTHA | | XES | P | 6645239 |
AIRTECH MECHANICAL, INC. | XMS | P | 07/17/2020 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: Adjusted schedules redesign of suite | TCRIPPEN | TCRIPPEN | | XMS | P | 6640893 |