THOMAS GENERAL CONTRACTORS, INC. | B= | C | 07/30/2020 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 6656034 | THOMAS GENERAL CONTRACTORS, INC. | B= | P | 07/23/2020 | Building final complete // Partial pending other final inspections // No return trip needed. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), DILLER ELECTRIC Electrical Final Inspection is not Completed yet, ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6648363 | THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 07/17/2020 | Grid ceiling support ok everywhere except reception area / Concealed space draftstop ok / Complete MEP rough inspections | TIMOTHYS | TIMOTHYS | | BSP | P | 6641981 | THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 06/17/2020 | Attach mechanical permit and complete MEP rough inspections / Light gauge steel framing at wall type W3A and W3D ok at 260, 261, 273, 274, 272, 276, 271, 275, 270, 269, 267, 268, 262, 263, 264, 265, 290, 277 | TIMOTHYS | TIMOTHYS | | BFR | P | 6608532 | DILLER ELECTRIC LLC | EP | C | 07/29/2020 | 60 amp 4/w L2H - Ok | BRETC | BRETC | | EP | C | 6654023 | DILLER ELECTRIC LLC | ER | C | 07/29/2020 | | BRETC | BRETC | | ER | C | 6654018 | DILLER ELECTRIC LLC | E= | C | 07/29/2020 | | BRETC | BRETC | | E= | C | 6654019 | DILLER ELECTRIC LLC | E= | P | 07/23/2020 | Break room, GFCI Recpt left of sink / FA Booster brkr lock on in panl L2H, brkr RED / Trouble shoot receptacles in hall and class rm / Need 2 circuits for / Rest - Ok | BRETC | BRETC | | E= | P | 6647747 | DILLER ELECTRIC LLC | ER | C | 07/17/2020 | FIRE ALARM INSPECTION: 261,262,263,264,265,268,269,270,271,272,273,274,275 - Ok | BRETC | BRETC | | ER | C | 6642076 | DILLER ELECTRIC LLC | E= | C | 07/17/2020 | FIRE ALARM INSPECTION: | BRETC | BRETC | | E= | C | 6641445 | DILLER ELECTRIC LLC | E= | C | 07/17/2020 | FIRE ALARM INSPECTION: 261,262,263,264,265,268,269,270,271,272,273,274,275 - Ok | BRETC | BRETC | | E= | C | 6641440 | DILLER ELECTRIC LLC | ER | P | 07/17/2020 | Conference Rm 268 ceiling / above ceilings ok / check 268 and 262 HVAC LV on grid | BRETC | BRETC | | ER | P | 6641427 | DILLER ELECTRIC LLC | ER | P | 07/15/2020 | NO TILE CAN BE DROP IN: This is electrical rough above ceiling only / FA not ready, still needs to be ran / 261,262,263,264,265,269,270,271,272,273,274,275 / Main conference rm NOT DONE / | BRETC | BRETC | | ER | P | 6638201 | DILLER ELECTRIC LLC | ER | P | 06/18/2020 | FIRE ALARM INSPECTION: 260 - 276 / 12 wall stubs only | BRETC | BRETC | | ER | P | 6609591 | DILLER ELECTRIC LLC | ER | P | 06/18/2020 | Rm 265 - all walls complete | BRETC | BRETC | | ER | P | 6609590 | DILLER ELECTRIC LLC | ER | P | 06/17/2020 | walls only - 264, 263, 262, 261, 269-275, hall 277 | BRETC | BRETC | | ER | P | 6608272 | ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 07/30/2020 | SPLICE COMPLETED / TEST AND BALANCE REPORT RECEIVED. SEE IMAGES. | LIDO | LIDO | | H= | C | 6655100 | ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 07/24/2020 | FINAL PENDING : (IT) ROOM # 267 SHOWN ON MECHANICAL PLANS AS DROP GRID CEILING. DUCT IN ROOM IS NOW EXPOSED. NEED REVISED AND APPROVED PLANS BY FINAL, WHAT IS BEING DONE FOR RETURN AIR IN ROOM # 267? /MISSING RETURN AIR LAY-IN GRILL FOR ROOM # 269 / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 6650114 | ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 07/16/2020 | (IT) ROOM # 267 SHOWN ON MECHANICAL PLANS AS DROP GRID CEILING. DUCT IN ROOM IS NOW EXPOSED. NEED REVISED AND APPROVED PLANS BY FINAL / ALL ABOVE CEILING DUCT ROUGH OK., OK TO WRAP/ | LIDO | LIDO | | HD | P | 6640053 | ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 07/07/2020 | Added note for missing 10" supply (LM) 7/8/20 / ABOVE CEILING DUCT ROUGH : E-WHP-4 - MISSING 8" SUPPLY FOR ROOM # 267, FINISH SEALING ALL DUCT ROUGH. DO NOT WRAP / E-WHP-1 DUCT ROUGH OK, OK TO WRAP. NEED DUCT FINAL CONNECTION TO E-WHP/ E-WHP-2- Missing 10" supply for room # 202. REST OF DUCT ROUGH OK, OK TO WRAP / E-WHP-3- DUCT ROUGH OK, OK TO WRAP / E-WHP-5- DUCT ROUGH OK, OK TO WRAP.
| LIDO | LIDO | | HD | P | 6629485 | ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | XMS | T | 07/28/2020 | PAID (REC#1699839): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Added return air | JUSTINC | JUSTINC | | XMS | T | 6651942 |
|
|