HENSEL PHELPS CONSTRUCTION CO | B= | C | 05/18/2021 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 6972661 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 05/17/2021 | building final OK pending Fire final as it is partial status. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | LONNYS | LONNYS | | B= | P | 6970119 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 02/22/2021 | Building final complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | JEREMYA | JEREMYA | | B= | P | 6876885 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 02/02/2021 | Framing at ED double doors OK | JEREMYA | JEREMYA | | BFR | P | 6856600 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 12/15/2020 | Building final complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | JEREMYA | JEREMYA | | B= | P | 6808242 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 11/19/2020 | All above ceiling penetrations in firewall and smoke barriers sealed | JEREMYA | JEREMYA | | BFR | P | 6783379 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/09/2020 | New walls in area B OK / Discussed smoke wall and fire barrier assemblies with GC | JEREMYA | JEREMYA | | BFR | P | 6736049 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 09/17/2020 | Phase 1 Cardiology and P.A.T final corrections complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MECH ONE, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6709086 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 09/15/2020 | Phase 1 Final, P.A.T and Cardiology, Restroom does not have the required clearance between the wall and the sink, only 59" now. All other rooms OK. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MECH ONE, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6705878 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 08/24/2020 | All penetrations above grid OK, walls are all labeled | JEREMYA | JEREMYA | | BFR | P | 6683105 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 07/06/2020 | complete other rough inspections/mechanical inspector to look at damper framing/discussed sealing penetrations at assemblies that were part of demo/frame ok | SCOTTS | SCOTTS | | BFR | P | 6627179 |
ENCORE ELECTRIC, INC. | E= | C | 02/17/2021 | corrections made | RANDY | RANDY | | E= | C | 6872783 |
ENCORE ELECTRIC, INC. | ER | P | 02/04/2021 | FIRE ALARM INSPECTION: FA for door expansion | RANDY | RANDY | | ER | P | 6859468 |
ENCORE ELECTRIC, INC. | ER | P | 02/03/2021 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6858670 |
ENCORE ELECTRIC, INC. | ER | P | 02/03/2021 | rough for door expansion | RANDY | RANDY | | ER | P | 6858012 |
ENCORE ELECTRIC, INC. | E= | C | 12/07/2020 | FIRE ALARM INSPECTION: | MATTHEW | MATTHEW | | E= | C | 6798439 |
ENCORE ELECTRIC, INC. | E= | C | 12/07/2020 | FIRE ALARM INSPECTION: ok per Randy | MATTHEW | MATTHEW | | E= | C | 6798438 |
ENCORE ELECTRIC, INC. | ER | C | 12/07/2020 | FIRE ALARM INSPECTION: ok per Randy | MATTHEW | MATTHEW | | ER | C | 6798437 |
ENCORE ELECTRIC, INC. | E= | P | 12/07/2020 | need handle tie for 208v circuits 14 and 16 / GFCI protect recep within 6' of sink rm B1235d / complete panel label / TR recep in corridor-------- added electrical to door needs to be completed | MATTHEW | MATTHEW | | E= | P | 6798432 |
ENCORE ELECTRIC, INC. | ER | P | 11/24/2020 | FIRE ALARM INSPECTION: nuclear camera area | RANDY | RANDY | | ER | P | 6787422 |
ENCORE ELECTRIC, INC. | ER | P | 11/24/2020 | nuclear camera area | RANDY | RANDY | | ER | P | 6787415 |
ENCORE ELECTRIC, INC. | ER | P | 10/20/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6748241 |
ENCORE ELECTRIC, INC. | ER | P | 10/20/2020 | walls marked on plans | RANDY | RANDY | | ER | P | 6748224 |
ENCORE ELECTRIC, INC. | ER | P | 10/13/2020 | clean hold rm walls-----marked on plans | RANDY | RANDY | | ER | P | 6739037 |
ENCORE ELECTRIC, INC. | E= | P | 09/11/2020 | see notes | RANDY | RANDY | | E= | P | 6702670 |
ENCORE ELECTRIC, INC. | ER | P | 09/11/2020 | see notes | RANDY | RANDY | | ER | P | 6702669 |
ENCORE ELECTRIC, INC. | E= | P | 09/11/2020 | room finals marked on plans-----talked about areas that will require TR outlets | RANDY | RANDY | | E= | P | 6702668 |
ENCORE ELECTRIC, INC. | ER | P | 09/11/2020 | room finals marked on plans | RANDY | RANDY | | ER | P | 6702667 |
ENCORE ELECTRIC, INC. | ER | P | 08/27/2020 | ceilings marked on plans | RANDY | RANDY | | ER | P | 6688075 |
ENCORE ELECTRIC, INC. | ER | P | 08/26/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6686191 |
ENCORE ELECTRIC, INC. | ER | P | 08/26/2020 | ceilings marked on plans | RANDY | RANDY | | ER | P | 6686177 |
ENCORE ELECTRIC, INC. | ER | P | 08/24/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6683669 |
ENCORE ELECTRIC, INC. | ER | P | 08/24/2020 | ceilings B1-8, south rooms B1214, B1215, B1216, B1217, B1218, B1220 | RANDY | RANDY | | ER | P | 6683668 |
ENCORE ELECTRIC, INC. | ER | R | 08/21/2020 | need GC's temp power removed from ceiling before ceiling inspections | RANDY | RANDY | | ER | R | 6681938 |
ENCORE ELECTRIC, INC. | ER | P | 07/16/2020 | toilet and EVS FA | RANDY | RANDY | | ER | P | 6640431 |
ENCORE ELECTRIC, INC. | ER | P | 07/16/2020 | EVS and toilet ceilings marked on plans | RANDY | RANDY | | ER | P | 6639048 |
ENCORE ELECTRIC, INC. | ER | P | 07/10/2020 | walls marked on plans | RANDY | RANDY | | ER | P | 6633766 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 12/11/2020 | ALL HYDRONIC PIPING COMPLETE. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6805482 |
MECHONE, INC. | H= | C | 12/03/2020 | TEST AND BALANCE REPORT AND ENGINEER LETTER APPROVING READINGS OUTSIDE +/-10% OF DESIGN RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6794887 |
MECHONE, INC. | H= | P | 11/23/2020 | PHASE 2. ALL FLEX AND DIFFUSERS INSTALLED. MECHANICAL FINAL PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6786307 |
MECHONE, INC. | HD | P | 11/02/2020 | PHASE 2. ALL SUPPLY/RETURN/EXHAUST AIR DUCTS OK, OK TO WRAP. NO FLEX OR DIFFUSERS YET. | DUSTINS | DUSTINS | | HD | P | 6761688 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 09/15/2020 | PHASE 1. SYSTEM LIVE, NO VISIBLE LEAKS FOUND. PIPING PER PLAN. OK TO INSULATE AND LABEL. STILL NEED TO SEE PIPING FOR PHASE 2 AFTER CONTAINMENT AREA IS MOVED. | DUSTINS | DUSTINS | | H= | P | 6706555 |
MECHONE, INC. | H= | P | 09/15/2020 | PHASE 1: ALL SUPPLY/RETURN/EXHAUST DUCTS FLEX AND DIFFUSERS OK. ALL ACCESS DOORS AND LABELS INSTALLED FOR FIRE DAMPERS. MECHANICAL FINAL PENDING TEST AND BALANCE REPORT. STILL NEED TO SEE PHASE TWO ROUGH AND FINAL INSPECTIONS AFTER CONTAINMENT AREA IS MOVED. | DUSTINS | DUSTINS | | H= | P | 6706554 |
MECHONE, INC. | HD | P | 08/11/2020 | M110 (BDA 59) SUPPLY, RETURN AND EXHAUST DUCTS OK, OK TO WRAP. THREE SMOKE DAMPERS INSTALLED, NEED TO SEE ACCESS DOORS AND LABELS. | DUSTINS | DUSTINS | | HD | P | 6668328 |
MECHONE, INC. | HD | P | 07/31/2020 | M110 (BDA 59) TWO FIRE DAMPER FRAMING AND ANNULAR SPACING OK. | DUSTINS | DUSTINS | | HD | P | 6657119 |
MECHONE, INC. | HD | P | 07/27/2020 | M110 (BDA 59) SUPPLY AIR DUCTS OK, OK TO WRAP. | DUSTINS | DUSTINS | | HD | P | 6651215 |
MECHONE, INC. | HD | P | 07/07/2020 | M110 (BDA 25) ONE FIRE/SMOKE DAMPER FRAMING NEEDS TO INSTALLED PER INSTALLATION INSTRUCTIONS. | DUSTINS | DUSTINS | | HD | P | 6628612 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 12/11/2020 | Phase 2 ok. | DANR | DANR | | P= | C | 6804748 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 10/28/2020 | Phase 2: ok. Note: check all domestic water and drain tie ins to existing mains at final / check insulation at final. | DANR | DANR | | PTO | C | 6756630 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/16/2020 | Phase 2: In wall DWV and domestic water okay. | DANR | DANR | | PTO | P | 6745092 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/16/2020 | Phase one columns B - E and 6.8: need inspection room B1251 (EVS) / rest ok for this area. | DANR | DANR | | P= | P | 6708244 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/15/2020 | Phase one columns B - E and 6.8: restroom B1220D lacking clearance from toilet wall to edge of lavatory sink / need inspection room B1251 (EVS) / rest ok for this area. | DANR | DANR | | P= | P | 6705819 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/29/2020 | Overhead domestic water and vents only columns B - E, and 6.8 ok. Note: check all domestic water tie ins to existing mains and insulation at final. | DANR | DANR | | PTO | P | 6654898 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 07/10/2020 | connection at 4" main in floor for B1220C ok | JOSEPHD | JOSEPHD | | PB | P | 6633478 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/10/2020 | in wall ok at rooms B1220C and B1220B | JOSEPHD | JOSEPHD | | PTO | P | 6633475 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/01/2020 | need to see sink at room B1220C and bathroom south of B1120C, all other sinks in wall ok need to see all over head and under floor completed | JOSEPHD | JOSEPHD | | PTO | P | 6624020 |
ENCORE ELECTRIC, INC. | XES | T | 12/04/2020 | PAID (REC#1734715): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added electrical at controlled access door. | BERTHA | BERTHA | | XES | T | 6796737 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 12/03/2020 | PAID (REC#1734536): PLAN SPLICE FEE: $50 by: DANM for Construction: Addition of controlled access doors at ED corridor A1-19 and associated equipment and devices | DANM | DANM | | XBS | T | 6794963 |
ENCORE ELECTRIC, INC. | XES | P | 10/19/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Minor power and systems revisions. | BERTHA | BERTHA | | XES | P | 6745668 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 10/16/2020 | PAID (REC#1722934): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: P310 adjusted medical gas plan. | SHANEN | SHANEN | | XPS | T | 6744918 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 10/16/2020 | PAID (REC#1722693): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions to architectural sheets | DANM | DANM | | XBS | T | 6744784 |
HENSEL PHELPS CONSTRUCTION CO | XBS | P | 07/28/2020 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revise EXIT 02 to terminate at 1 HR Smoke Barrier | DANM | DANM | | XBS | P | 6652220 |
ENCORE ELECTRIC, INC. | XES | P | 07/16/2020 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 6639261 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 07/10/2020 | PAID (REC#1694721): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions | DANM | DANM | | XBS | T | 6632968 |
ENCORE ELECTRIC, INC. | XES | T | 06/18/2020 | PAID (REC#1689919): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised for background changes. | BERTHA | BERTHA | | XES | T | 6609845 |
HENSEL PHELPS CONSTRUCTION CO | XPS | T | 06/17/2020 | PAID (REC#1689381): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: PD200, P110, P200, P210, P310, P601 See drawing notes above CLOUDED REVISIONS ONLY stamp on each sheet. | SHANEN | SHANEN | | XPS | T | 6608278 |
HENSEL PHELPS CONSTRUCTION CO | XMS | P | 06/17/2020 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised layout and schedule | JUSTINC | JUSTINC | | XMS | P | 6608206 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 06/17/2020 | PAID (REC#1689380): PLAN SPLICE FEE: $50 by: DANM for Construction: Revised layout for P.A.T. suite | DANM | DANM | | XBS | T | 6608071 |