SCHEINER COMMERCIAL GROUP, INC. | B= | C | 10/23/2020 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 6752014 |
SCHEINER COMMERCIAL GROUP, INC. | B= | P | 10/20/2020 | pending other final inspections. Additional Inspections Required (computer generated): DILLER ELECTRIC Electrical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6748308 |
SCHEINER COMMERCIAL GROUP, INC. | BFR | P | 09/09/2020 | need to revise design to reflect as built condition - demising walls are existing and are not in scope of work for tenant finish as shown in design per wall type 3 / other corrections okay / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6700593 |
SCHEINER COMMERCIAL GROUP, INC. | BFR | R | 09/01/2020 | need to revise design to reflect as built condition - demising wall framing does not extend to roof deck as shown on approved design per wall type 3 at west end of suite - at east end of suite, demising wall is existing and is not in scope of work for tenant finish as shown in design / need details for wall type 6 not found on approved design / need to revise design to reflect as built condition to reflect deletion of wall type 6 at customer counter / missing framing details for all soffits and soffit framing needs to be re-inspected / hard lid framing completed over restrooms not in approved design / observed light gauge wall framing / need to complete other rough inspections / reviewed accessible elements with site super | BRIANB | BRIANB | | BFR | R | 6693171 |
SCHEINER COMMERCIAL GROUP, INC. | BIN | P | 09/01/2020 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | GITA | GITA | | BIN | P | 6692131 |
DILLER ELECTRIC LLC | E= | C | 10/23/2020 | Electrical complete / | ROB | ROB | | E= | C | 6752012 |
DILLER ELECTRIC LLC | E= | P | 10/21/2020 | Prints have not been scanned yet / | ROB | ROB | | E= | P | 6748629 |
DILLER ELECTRIC LLC | E= | P | 10/13/2020 | Need to splice prints with one line changes, deletion of duct heater, and changes of equipment loads, phasing / All else ok / | ROB | ROB | | E= | P | 6739440 |
DILLER ELECTRIC LLC | E= | P | 10/12/2020 | Need disconnects for DW, Cooler, Freezer / Recpt near sink in rear needs GFCI protection, / Need to seal cooler and freezer conduits / Check splice for service / | ROB | ROB | | E= | P | 6738351 |
DILLER ELECTRIC LLC | ER | P | 09/29/2020 | Rough ok for grid ceilings / | ROB | ROB | | ER | P | 6723455 |
DILLER ELECTRIC LLC | ER | P | 09/11/2020 | hard lids in bathrooms and soffits okay / beer tap wall rough in okay | CHIPO | CHIPO | | ER | P | 6702543 |
DILLER ELECTRIC LLC | E= | P | 08/31/2020 | Not Ready | BRETC | BRETC | | E= | P | 6691558 |
DILLER ELECTRIC LLC | ER | P | 08/31/2020 | All walls only - Ok | BRETC | BRETC | | ER | P | 6691555 |
DILLER ELECTRIC LLC | ER | P | 08/18/2020 | Rough ok for south and east walls / Discussed accessibility requirements with contractor / | ROB | ROB | | ER | P | 6676307 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 10/22/2020 | Mechanical final ok. Test and balance report received, see images. / | MARKB | MARKB | | H= | C | 6750398 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 10/21/2020 | Mechanical final ok pending receipt of test and balance report / CO2 TANK IS SHOWN ON CURRENT A-100.00 PLAN SPLICE DATED 10/14/20 AND FIRE SIGNED OFF 10/19/20. | MARKB | MARKB | | H= | P | 6748584 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 10/13/2020 | NOTE ADDED 10/21/20: OWNER PROVIDE SELF-CONTAINED COOLERS ARE NOT PART OF THESE INSPECTION. Cannot put contractor under final partial until CO2 tank is taken care of - Fire review shows 550lb CO2 tank outside building but is currently set up for tan to go inside building. If tank is to stay inside building, will need new fire review and shown on mechanical drawings and note explaining how complying with code. --FURTHER RESEARCH REQUIRED for clearance on self contained walkin's. PLAN SPLICE FOR DUCT ON FILE, BATHROOM EXHAUST, DIFFUSERS AND THERMOSTATS COMPLETE. | MARKB | MARKB | | HD | P | 6740173 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/09/2020 | ABOVE CEILING DUCT - RTU-10 ROUND DUCT DOWN THE MIDDLE OK FOR SUPPORT AND SEALING BUT DOES NOT MATCH PLANS. WRAP AT OWN RISK. WILL NEED A PLAN SPLICE FOR CHANGED DUCT. No exhaust at this time | MARKB | MARKB | | HD | P | 6700778 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/02/2020 | ----Will need refrigeration contractor attached to permit---- CURRENT PLANS DO NOT SHOW ANY COOKING EQUIPMENT ABOVE CEILING DUCT - SUPPLY MAINS FOR RTU-9 & 10 INSTALLED PER PLAN OK TO WRAP EXCEPT FOR: 10x8 & 14x8 mains in the middle for RTU-10 not installed - If not following plan, a plan splice will be required. | MARKB | MARKB | | HD | P | 6694838 |
AMEN PLUMBING- HEATING, LLC | P= | C | 10/12/2020 | request for e letter for material was addressed on plan revisions, all ok | JOHNS | JOHNS | | P= | C | 6737439 |
AMEN PLUMBING- HEATING, LLC | PTO | C | 08/28/2020 | NEED engineers letter for pex and sch 40 dwv
BY FINAL need to see pics of both flanges secured, vtr (existing), check water htr and above ceiling waters insulated, check bfp at applicable areas, no fill and drain kit | JOHNS | JOHNS | | PTO | C | 6689676 |
AMEN PLUMBING- HEATING, LLC | PB | C | 07/28/2020 | NEED to add 1 dishwasher to scope by PTO
rest ok for g.w. and s.s.. NOTE: water will be ran over head | JOHNS | JOHNS | | PB | C | 6652230 |
DILLER ELECTRIC LLC | XES | T | 10/19/2020 | PAID (REC#1722818): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power plan, revised schedules. | BERTHA | BERTHA | | XES | T | 6746272 |
SCHEINER COMMERCIAL GROUP, INC. | XBS | T | 10/14/2020 | PAID (REC#1722446): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add wall detail | MICHAELA | MICHAELA | | XBS | T | 6741591 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 10/07/2020 | PAID (REC#1719815): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: As-built revisions | JUSTINC | JUSTINC | | XMS | T | 6733173 |
SCHEINER COMMERCIAL GROUP, INC. | XBS | T | 09/04/2020 | PAID (REC#1710847): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise framing details | MICHAELA | MICHAELA | | XBS | T | 6697738 |