RAINE BUILDING LLC. | B= | C | 07/21/2021 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 7043404 |
RAINE BUILDING LLC. | B= | P | 08/21/2020 | pending other final inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), JOHNSON BROTHERS PLUMBING & HEATING Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6682040 |
RAINE BUILDING LLC. | BFR | P | 07/01/2020 | need to attach mechanical to permit and complete other rough inspections / observed non-load bearing wall framing | BRIANB | BRIANB | | BFR | P | 6624718 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 08/21/2020 | interior finish complete | CHIPO | CHIPO | | E= | C | 6681956 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/15/2020 | FIRE ALARM INSPECTION: | LOGANP | LOGANP | | E= | C | 6638129 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 07/15/2020 | FIRE ALARM INSPECTION: Above ceilings ok / | LOGANP | LOGANP | | ER | C | 6638127 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/15/2020 | FIRE ALARM INSPECTION: Above ceilings ok / | LOGANP | LOGANP | | E= | C | 6638128 |
PROCOM ELECTRICAL SERVICES, INC. | ER | P | 07/15/2020 | Above ceilings ok / Room 202 Needs track light installed / | LOGANP | LOGANP | | ER | P | 6638122 |
PROCOM ELECTRICAL SERVICES, INC. | ER | P | 07/01/2020 | install grd screws in metal boxes, verify on next inspection --------- in all meeting rooms read 210.71 ------------- walls ok | CRAIG | CRAIG | | ER | P | 6623756 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | C | 08/31/2020 | Mechanical final ok. Test and balance report received, see images. / | MARKB | MARKB | | H= | C | 6690428 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | P | 08/06/2020 | Mechanical final ok pending receipt of test and balance report / FLEX, DIFFUSERS AND THERMOSTATS COMPLETE PER PLAN SPLICE. | MARKB | MARKB | | H= | P | 6664232 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HD | P | 07/20/2020 | Still need engineer to address transfer duct through wall above ceiling into "NO Work" area not shown on plans. Engineer to address return air for offices not shown on plans. ABOVE CEILING DUCT - FLEX, DIFFUSERS AND SLOT BOXES INSTALLED PER PLAN EXCEPT: Still need slot boxes installed in offices 203 & 204 | MARKB | MARKB | | HD | P | 6642509 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HD | P | 07/14/2020 | ----PLAN SPLICE REQUIRED: New transfer installed at entrance area into "NO WORK" area not on plans. ENGINEER TO ADDRESS: How each office gets return air not shown on plans---- ABOVE CEILING DUCT - Existing slot diffusers have been taken out of ceiling and will need to be put back. No diffusers installed. Flex tucked up in ceiling and cannot verify all are where the need to be. VAV AND FPB INSTALLED PER PLAN. | MARKB | MARKB | | HD | P | 6636916 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | XMS | T | 08/05/2020 | PAID (REC#1702185): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: okay new splice returns relocated and note 17 | TCRIPPEN | TCRIPPEN | | XMS | T | 6661425 |