ENCORE ELECTRIC, INC. | E= | C | 10/07/2022 | 30 day metering / | BRIAN | BRIAN | | E= | C | 7542807 |
ENCORE ELECTRIC, INC. | EE | L | 10/05/2022 | Renewed for No Fee at 10/5/2022 2:47:20 PM | ASHLEYL | ASHLEYL | | EE | L | 7540879 |
ENCORE ELECTRIC, INC. | EE | L | 02/03/2022 | Renewed online for Half Fee at Feb 3 2022 10:48AM (RECEIPT #: 1840920) | WEBSITE | WEBSITE | | EE | L | 7258530 |
ENCORE ELECTRIC, INC. | E= | P | 07/21/2021 | corrections made --still need the 30 day metering reports uploaded / 20 amp mini split ok / | BRIAN | BRIAN | | E= | P | 7043844 |
ENCORE ELECTRIC, INC. | EE | L | 07/20/2021 | Renewed online for 1/2 Fee at 7/20/2021 11:29:49 AM (RECEIPT #: 1791377) | WEBSITE | WEBSITE | | EE | L | 7041966 |
ENCORE ELECTRIC, INC. | E= | R | 11/12/2020 | need to have the installer on site to show the work in the ceiling / need access to the disconnect / can not run tc cable through the building with out raceway / ---------------panel , ac 20 amp , under floor in it room ok / | BRIAN | BRIAN | | E= | R | 6774213 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | C | 11/04/2022 | | MATTM | MATTM | | H= | C | 7573068 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | L | 11/04/2022 | Drywall on left side of damper angle needs to have breach repaired / ok to attach picture of correction to next inspection request / | MATTM | MATTM | | H= | L | 7572856 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HE | L | 08/18/2022 | Renewed online for Full Fee at Aug 18 2022 9:26AM (RECEIPT #: 1892512) | WEBSITE | WEBSITE | | HE | L | 7487007 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | R | 06/07/2021 | BASEMENT CLOSET 460G - Seal new duct and need damper install instructions provided at time of inspection. Need drywall repaired on hall side of wall. Not sure if damper needs breakaway connections - none installed - need instructions. | MARKB | MARKB | | HD | R | 6993302 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | L | 04/16/2021 | CANNOT FIND CONTRACTOR AT HOSPITAL AND NOT ANSWERING CALL AHEAD NUMBER | MARKB | MARKB | | H= | L | 6937201 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 04/16/2021 | ENGINEER APPROVED TEST AND BALANCE REPORT RECEIVED | MARKB | MARKB | | HSP | P | 6936385 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HE | C | 04/12/2021 | | BRITNEY | BRITNEY | | HE | C | 6929767 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/16/2020 | FIRE DAMPER FRAMING OK / | LIDO | LIDO | | HD | P | 6744468 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/15/2020 | FIRE DAMPER FRAME NOT READY / | LIDO | LIDO | | HD | P | 6742846 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/28/2020 | BASEMENT : PLAN PAGE M2.01 ( BDA 94) (IS) ROOM# 0460G - FIRE DAMPER OPENING WAS FRAMED PER THE METAL STUD FRAMING FOR A SHAFTWALL / FIRE DAMPER OPENING MUST BE FRAMED PER THE METAL STUD FRAMING IN A DRYWALL PARTITION / | LIDO | LIDO | | HD | P | 6721606 |