ELDER CONSTRUCTION, INC. | B= | C | 02/02/2021 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 6855941 |
ELDER CONSTRUCTION, INC. | B= | P | 12/18/2020 | All final items OK. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 6813419 |
ELDER CONSTRUCTION, INC. | BFR | P | 09/30/2020 | Obtain and attach mechanical permit / Light gauge steel framing ok 1068B, 1139, 1133A, 1053A, 1126, 1125, 1142A,B,C, 1152A,B, 1143A, 1141A / Discussed timeline, inspection schedule, and expectations with contractor | TIMOTHYS | TIMOTHYS | | BFR | P | 6725351 |
FOSTER ELECTRIC CORPORATION | E= | C | 12/10/2020 | Areas/Offices/Classrooms/Meeting - Complete | BRETC | BRETC | | E= | C | 6803415 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/27/2020 | Ceilings only - marked on drawings / 10/27 | BRETC | BRETC | | ER | P | 6755114 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/05/2020 | Walls only / Marked on drawings 10/5 | BRETC | BRETC | | ER | P | 6729751 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/30/2020 | Walls only marked on main drawings / 9/30 / Discussed accessibility requirements with contractor / Discussed conference room spacing | BRETC | BRETC | | ER | P | 6725253 |
FOSTER ELECTRIC CORPORATION | ER | L | 09/03/2020 | EC call in by mistake/ | JOHNN | JOHNN | | ER | L | 6696441 |
COLORADO SHEET METAL CO., INC. | H= | C | 02/02/2021 | TAB REPORT RECEIVED , SEE IMAGES | BENH | BENH | | H= | C | 6855940 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 11/25/2020 | ALL LINES HAVE BEEN INSULATED AND LABELED | BENH | BENH | | H= | C | 6789779 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | C | 11/12/2020 | SYSTEM UNDER WORKING PRESSURE, NO VISIBLE LEAKS, OK TO INSULATE, NEEDED FOR FINAL: ALL LINES INSULATED, REST OK | BENH | BENH | | HWP | C | 6774282 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 11/05/2020 | WRONG PERMIT CALLED IN, NEEDS TO BE N10831 AND CONTRACTOR NEEDS TO ATTACH TO THAT PERMIT TO COMPLETE HWP INSPECTION , INSPECTION WAS FOR 3RD FLOOR PIPING TO VAV'S, NO VISIBLE LEAKS, SYSTEM UNDER WORKING PRESSURE OK TO INSULATE | BENH | BENH | | HWP | P | 6766202 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/08/2020 | INSPECTION TODAY WAS FOR SUPPLYS IN OFFICE 1142 A, 1143 B, RECEPTION OFFICE, WAITING ROOM, OFFICE 1121, OK TO INSULATE | BENH | BENH | | HD | P | 6734937 |